Network Rail have recently published a press release, outlining platform extensions for 3 of the Manchester Airport line stations: Mauldeth Road, East Didsbury and Gatley, which will be starting from Sunday January 8th:

Platforms at three stations between Manchester Piccadilly and Manchester Airport are being extended for passengers from this weekend.

Network Rail is investing £8.5m to lengthen Mauldeth Road, East Didsbury and Gatley stations to make way for longer trains, providing more seats in future for passengers travelling along the busy airport line.

The work begins on Sunday 8 January and will be complete by the end of March.

To carry out the upgrades, the line between Manchester Piccadilly and Manchester Airport will be closed for six Sundays on:

  • January 8, 15 and 22
  • February 12, 19, and 26

Replacement buses will be in place to keep passengers on the move but people are being advised to plan ahead at www.nationalrail.co.uk and allow extra time for their journeys to and from the airport on those dates.

You can read more about it on the official page here:
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

busestrains

On Moderation
Joined
9 Sep 2022
Messages
788
Location
Salisbury
Network Rail have recently published a press release, outlining platform extensions for 3 of the Manchester Airport line stations: Mauldeth Road, East Didsbury and Gatley, which will be starting from Sunday January 8th:



You can read more about it on the official page here:
Out of interest why are Burnage and Heald Green not being done too? Or are they already longer than the East Didsbury and Gatley and Mauldeth Road platforms?

Does anyone know how long the platforms are being extended to as the article does not say? How many coaches will they be able to take after they are extended?

Also i hope ticket acceptance on the trams is arranged. It seems silly to make passengers travelling between the airport and the city centre use rail replacement buses when the trams will still be available.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,917
Location
Mold, Clwyd
Current platfrom lengths (Up/Down) from the SA:
Styal: 166/165m
Heald Green: 142/142
Gatley: 106/122
East Didsbury: 104/112
Burnage 149/150
Mauldeth Road 121/140

So if the target is 6x23m = 138m (ie double 323/331), Styal, Heald Green and Burnage are already compliant.
However, looking at current through services, and taking Liverpool-Airport as an example, many stations on the Chat Moss route can not take 2x323/331, so are going to remain single units.
 
Last edited:

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,333
Also i hope ticket acceptance on the trams is arranged. It seems silly to make passengers travelling between the airport and the city centre use rail replacement buses when the trams will still be available.
Won't locals simply use the tram or local buses using the appropriate fares if they are more convenient? The tram doesn't go directly from the East Didsbury line to Piccadillly Station so isn't ideal as a rail replacement option for connections from there.
 

sportzbar

Member
Joined
11 May 2014
Messages
208
However, looking at current through services, and taking Liverpool-Airport as an example, many stations on the Chat Moss route can not take 2x323/331, so are going to remain single units.
Chat Moss route already sees regular double 331 services using ASDO....
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,779
Location
West of Andover
Also i hope ticket acceptance on the trams is arranged. It seems silly to make passengers travelling between the airport and the city centre use rail replacement buses when the trams will still be available.
Depends if there will be nonstop buses available between the airport & Piccadilly. As those will probably be faster than the tram.
 

sportzbar

Member
Joined
11 May 2014
Messages
208
Depends if there will be nonstop buses available between the airport & Piccadilly. As those will probably be faster than the tram.
Buses scheduled every 30 mins from Piccadilly (probably more than one at a time, but this is rail replacement buses).

:30 each hour Picc-Heald Green-Airport

:00 each hour Picc-All Stops-Airport
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,391
Location
"Marston Vale mafia"
However, looking at current through services, and taking Liverpool-Airport as an example, many stations on the Chat Moss route can not take 2x323/331, so are going to remain single units.

It's at least in part for 6-car (6x24) Barrow and Windermere operation. The Furness Line platforms have already been done.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
It's at least in part for 6-car (6x24) Barrow and Windermere operation. The Furness Line platforms have already been done.
The Barrow and Windermere services currently call at Gatley but skip the other stations. The TfW services call at E Didsbury. Only the Chat Moss and Crewe stoppers currently call at Mauldeth Road.

The 195/1 and 331/0 are 71.4m long, so 143m for a double formation.
 

OrangeJuice

Member
Joined
4 Jun 2018
Messages
210
Aren't northern getting more 323's from WMT eventually and wouldn't they then be run in pairs?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,391
Location
"Marston Vale mafia"
Aren't northern getting more 323's from WMT eventually and wouldn't they then be run in pairs?

Yes, Northern are getting the WMT 323s and they will replace 319s and 6.331 sets (in pairs) in the North West I believe (I bet Blackpool line people won't like it, but they do have more capacity due to the 3+2 seating). 323s don't have ASDO so this may be why they are extending platforms now.
 

javelin

Member
Joined
6 Sep 2021
Messages
135
Location
_
Unless I've missed something, Chat Moss is planned to be done too and was announced at the same time as the Styal line was.
 

js1000

Member
Joined
14 Jun 2014
Messages
1,022
The stations on the Styal Line all received ASDO beacons in late 2017/early 2018 ready for the arrival of six coach 195s and 331s. However the Class 323 do not even have SDO - nevermind automatic SDO.

Commuter patronage on the Styal line has been absolutely battered over the past 5 years or so good to see they are making improvements. The 2018 timetable change to skip-stop services on this line never made much sense to me. An express service to/from Piccadilly to the Airport is no more quicker than a stopping service due to the 70mph speed restriction and the increased unreliability simply turns commuters away and cannibalises bread and butter commuter revenue.

Doubling to six-car 323 service for a reliable half-hourly service, upgrading capacity for commuters and an effective shuttle service for visitors, should hopefully get this route back on track.
 

Liverpool 507

Member
Joined
17 Jan 2018
Messages
642
Location
Merseyside
Chat Moss route already sees regular double 331 services using ASDO....
Not since the timetable change. Those double services that operated before the timetable change involved local door only entry and exit on the back set. Even at stations where five of six coaches fitted.
Unless I've missed something, Chat Moss is planned to be done too and was announced at the same time as the Styal line was.
Lea Green and Newton-le-Willows are to be done for the benefit of TPE. The main platform extensions in Merseyside at the moment are for the Merseyrail 777s so I would assume why Chat Moss is still in the queue so to speak.
 

CJ

Member
Joined
18 May 2009
Messages
214
Location
Stockport
6-car 331s have been used on the Liverpool - Airport stopper during industrial action days (according to RTT), but normally (since Dec 22 timetable) they have been a mixture of single 3-car 323 or 3-car 331. 4-car 319s no longer run on this route.

6-car 185s were used on the Redcar - Airport service when they stopped at Gatley initially (front 4 cars would open towards Airport, front 5 cars would open towards Piccadilly). However, this has now been replaced by the Cumbria service during Weekdays/Saturdays, with the TPE service continuing to stop on Sundays only.

Some stations on the Manchester Airport - Cumbria service have had their station platforms extended for 6-car 195 operations recently (just in time for the Dec 22 timetable change), so it's good to see that further progress is being made for routes which are destined/aspired for 6-car operation.

Here's hoping it won't be too long until some of the Chat Moss/Crewe stopper stations are extended also.

The stations on the Styal Line all received ASDO beacons in late 2017/early 2018 ready for the arrival of six coach 195s and 331s. However the Class 323 do not even have SDO - nevermind automatic SDO.

Commuter patronage on the Styal line has been absolutely battered over the past 5 years or so good to see they are making improvements. The 2018 timetable change to skip-stop services on this line never made much sense to me. An express service to/from Piccadilly to the Airport is no more quicker than a stopping service due to the 70mph speed restriction and the increased unreliability simply turns commuters away and cannibalises bread and butter commuter revenue.

Doubling to six-car 323 service for a reliable half-hourly service, upgrading capacity for commuters and an effective shuttle service for visitors, should hopefully get this route back on track.

Yes agreed, fingers crossed we see stability on this line once again.

Unless I've missed something, Chat Moss is planned to be done too and was announced at the same time as the Styal line was.

I remember reading something similar also.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Unless I've missed something, Chat Moss is planned to be done too and was announced at the same time as the Styal line was.
According to the Sectional Appendix, nearly all the platforms on the Chat Moss line are less than 140m, the only exceptions being Edge Hill, Roby Down, Rainhill Up and Earlestown Up. So quite a lot of work to do.
 
Last edited:

CE142

Member
Joined
23 Dec 2014
Messages
105
It's at least in part for 6-car (6x24) Barrow and Windermere operation. The Furness Line platforms have already been done.
The only platforms that will take 2x195/1s on the Furness line bothways are Carnforth and Barrow..... And Grange on the Up.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,280
Location
Bolton
The only platforms that will take 2x195/1s on the Furness line bothways are Carnforth and Barrow..... And Grange on the Up.
Indeed. But at least they can all take four coaches now.

== Doublepost prevention - post automatically merged: ==

What were the recent extensions, then?
Just to enable both units to be on the platform.
 

javelin

Member
Joined
6 Sep 2021
Messages
135
Location
_
According to the Sectional Appendix, nearly all the platforms on the Chat Moss line are less than 140m, the only exceptions being Edge Hill, Roby Down, Rainhill Up and Earlestown Up. So quite a lot of work to do.

Found it.


It [DfT] gave the following breakdown of the £84m:

  • £16.8m of the investment will go into a two-phase programme of infrastructure works to enhance the performance and reliability benefits of the new December 2022 timetable, including track improvements on the Manchester-Liverpool route and platform extensions at four stations on the Cumbrian route, which will start this summer and be complete by December.
  • £41.5m will go into depot improvements and 17 platform extensions on the Chat Moss, Bolton, Styal and Leeds NW lines. This will support the already-planned roll-out of refurbished Class 323 electric trains by Northern, with work beginning this summer and to be completed by Summer 2023, meaning that passengers can enjoy better reliability and capacity across routes, including the Bolton Corridor.
  • £26m will go towards design and development work on three planned tranches of upgrades to improve passenger facilities at Manchester Piccadilly and Manchester Victoria, as well as plans for re-signalling works on the Castlefield Corridor and a remodelling of Oxford Road station, all to be completed by the mid-2030s.

Make of that what you will.
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,917
Location
Mold, Clwyd

6-car 331s have been used on the Liverpool - Airport stopper during industrial action days (according to RTT), but normally (since Dec 22 timetable) they have been a mixture of single 3-car 323 or 3-car 331. 4-car 319s no longer run on this route.
Where have the 319s gone to, then?
Do they still do Piccadilly-Airport-Crewe?
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,110
Location
Wilmslow
Where have the 319s gone to, then?
Do they still do Piccadilly-Airport-Crewe?
Not a single one working through Wilmslow today.
Plenty on Wigan-Liverpool Lime Street booked workings though. And Blackpool North to Liverpool Lime Street workings.
(Realtime Trains and look for 4-car allocations before drilling down.)

EDIT Back in November someone was good enough to post the EMU diagrams, including for class 319, on this forum. The only A booked working to Manchester Airport I can see is 2F13 05:32 Manchester Airport to Liverpool Lime Street, which was 319 381 today. There is also 2A27 00:03 Piccadilly-Airport.
 
Last edited:

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Found it.




Make of that what you will.
By my count 1415 platforms need doing on the Chat Moss line, plus the 5 on the Styal line, plus 6 at Blackrod, Adlington and Leyland, plus however many on the Aire and Wharfe Valley lines. So I do not understand how they arrived at a total of only 17, although Sectional Appendix platform lengths are not always accurate/up to date.

Of course some will just involve bringing a disused portion of the platform back into use.
 
Last edited:

jonesy3001

Established Member
Joined
13 Jul 2009
Messages
3,317
Location
Otley, West Yorkshire
Not a single one working through Wilmslow today.
Plenty on Wigan-Liverpool Lime Street booked workings though. And Blackpool North to Liverpool Lime Street workings.
(Realtime Trains and look for 4-car allocations before drilling down.)

EDIT Back in November someone was good enough to post the EMU diagrams, including for class 319, on this forum. The only A booked working to Manchester Airport I can see is 2F13 05:32 Manchester Airport to Liverpool Lime Street, which was 319 381 today. There is also 2A27 00:03 Piccadilly-Airport.
Shared 323/331 workings in the Piccadilly area apart from the blackpools and hadfields and as stated, the only 319 is the early airport to liverpool train.
Victoria is your best bet for the 319s now.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
Commuter patronage on the Styal line has been absolutely battered over the past 5 years or so good to see they are making improvements. The 2018 timetable change to skip-stop services on this line never made much sense to me.
Doesn't mean that pattern will remain though.
The current Styal line pattern is utterly broken and won’t last long. There is now 2tph all stops, but at the expense of the Lime Street - Warrington Bank Quay electric service, but too many trains run non-stop, not enough skip-stop calls have been retained and the ones that have should probably run non-stop, e.g. the Barrow/Windermere service should definitely run non-stop and the Blackpool North - Hazel Grove which has been hastily diverted that way should not.
Yes, Northern are getting the WMT 323s and they will replace 319s and 6.331 sets (in pairs) in the North West I believe (I bet Blackpool line people won't like it, but they do have more capacity due to the 3+2 seating). 323s don't have ASDO so this may be why they are extending platforms now.
I thought 323s were banned through Chorley. They might get away with replacing many of the 319/769 workings and Sprinters on the new Stalybridge/Westhoughton wires, but they will never displace 6 car 331s to Blackpool North. The line just couldn’t take the capacity reduction.

I doubt 323s could be pathed to run at 90mph on the WCML between Wigan and Preston either, but that might be able to cope with a 4 car 331.
Lea Green and Newton-le-Willows are to be done for the benefit of TPE. The main platform extensions in Merseyside at the moment are for the Merseyrail 777s so I would assume why Chat Moss is still in the queue so to speak.
I do hope Lea Green and Newton-le-Willows get done to 6 car length now TPE are running 6 car 185s on the Hull service. The Merseyrail platform extensions are nearly done so the same team may be able to move onto Chat Moss.

I’ve heard that the Roby and Huyton island platforms can’t be lengthened to 6 cars without track realignment, but they don’t look like that would make them too narrow to me.
Roby Down
Down Fast or Down Slow? Roby is 4 platforms.
Where have the 319s gone to, then?
Do they still do Piccadilly-Airport-Crewe?
There does seem to have been many changes to unit allocations in this timetable. I can’t work out what has been freed up or where.
Victoria is your best bet for the 319s now.
What electric only services run into Victoria? I have seen them on the peak Wigan North Western Chat Moss shuttles.

Does the early morning Stoke-on-Trent - Blackpool North 331 not still run, formerly the only 331 south of Stockport other than to Hazel Grove?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,917
Location
Mold, Clwyd
Shared 323/331 workings in the Piccadilly area apart from the blackpools and hadfields and as stated, the only 319 is the early airport to liverpool train.
Victoria is your best bet for the 319s now.
So it looks like 319s have swapped with 331s on the Liverpool-Wigan-Blackpool runs, with the 331s now on the Airport run.
 