The main barrier is getting over the 3rd rail issue, modding all those 345s will be expensive.
No, the main issue is finding a couple of billion quid.
The main barrier is getting over the 3rd rail issue, modding all those 345s will be expensive.
No the main barrier is the high cost of the infrastructure works especially through Slade Green and Dartford. (over £2bn for this)Extension to Ebbsfleet has been a widely-backed proposal for a while now. The main barrier is getting over the 3rd rail issue, modding all those 345s will be expensive.
Gidea Park is a strange place to put a big eastern driver depot tbh, but it is not too far from the M25 I suppose.
I assume you’d send drivers out in batches so they could intensify service and there’d always be one or 2 waiting for the next service if you were planning to step service up.
Extension to Ebbsfleet has been a widely-backed proposal for a while now. The main barrier is getting over the 3rd rail issue, modding all those 345s will be expensive.
No enthusiasm for Ebbsfleet (which causes much confusion) but rather Gravesend (4tph Crossrail terminating) and Northfleet (12tph Crossrail with 8tph terminating) which has long since been safeguarded as part of the Crossrail Act. TfL are happy if the funding is addressed by the Ebbsfleet consortium* as the vast majority of the benefits (and cost) would fall outside TfL boundaries (effectively Slade Green).Regarding extension to Ebbsfleet, are TfL one of those widely backing the proposal? I may have missed it but can’t recall any enthusiasm from them for going to Ebbsfleet.
Going back to the original question and to the point about increasing rail capacity into London, the answer is "yes but..." The original arguments for Crossrail were to do with increasing the capacity for commuters to get to Central London jobs, but with the constraints being identified as the Underground network within the Central Area and the interchanges from mainline rail to the Central Area Underground. So it wasn't about getting into London from "outside", it was about getting around Central London once you arrived.Related from the discussions on passenger numbers...
It seems to me that there isn't actually a massive amount of new capacity into London on the EL. Obviously the core to abbey wood is all new capacity.
But on the GEML/GWML basically it's just replaced trains that stopped at paddington/liv st to continue onwards - not actual "new" capacity per se. I suspect in the next timetable change the 4 trains stopping at Liv St High level are indeed "new" capacity, and maybe the GEML/GWML slows have a more frequent service under EL vs previously (though not entirely sure of that).
I read some stat ages ago while it was getting built that it was increasing rail capacity into london by 10%, but I can't see that actually being the case, unless they are refering to the core -> abbey wood only? (which is really streching the defention of 'into london' IMO).
Well they do some times. Clapham Jct. Potters Barr. Paddington to name a few.
The actual relevant issue (as much as there is one) is whether standing passengers fare worse in derailments than seated passengers. I don't recall ever seeing any analysis of this (but I've not looked at all recently)Well they do some times. Clapham Jct. Potters Barr. Paddington to name a few.
At the end, it's likely be deverloper contribution heavy extension given that DfT nor TfL would have the funding be available.No enthusiasm for Ebbsfleet (which causes much confusion) but rather Gravesend (4tph Crossrail terminating) and Northfleet (12tph Crossrail with 8tph terminating) which has long since been safeguarded as part of the Crossrail Act. TfL are happy if the funding is addressed by the Ebbsfleet consortium* as the vast majority of the benefits (and cost) would fall outside TfL boundaries (effectively Slade Green).
it has to be branded as "Ebbsfleet" for political & funding reasons due to the powers available to Ebbsfleet Development Corporation and is heavily promoted by TfSE.
*Ebbsfleet consortium:
- London Borough of Bexley
- Dartford Borough Council
- Gravesham Borough Council
- Ebbsfleet Development Corporation
- Kent County Council
- The Greater London Authority
- Greater North Kent Partnership
I haven't looked at it recently but from memory for starters:The actual relevant issue (as much as there is one) is whether standing passengers fare worse in derailments than seated passengers. I don't recall ever seeing any analysis of this (but I've not looked at all recently)
No, the main issue is finding a couple of billion quid.
Apart from the money, third rail is an issue to some extent because you'll have to bring them all out of service gradually to do the mods.No the main barrier is the high cost of the infrastructure works especially through Slade Green and Dartford. (over £2bn for this)
The 345s are third rail ready so the modifications will be the cheap bit.
There would also need to be lots of extra 345s. (circa 12 as central estimate, depending on service levels or patterns)
Extension to "Ebbsfleet" doesn't actually mean Ebbsfleet (not so international) station but Gravesend terminus with Northfleet / Swanscombe / Greenhithe (forBlue WaterwestEbbsfleet) stops.
Fair enough - Shenfield or Ilford seems a more logical place to put a drivers depot, but I suppose space matters.The M25 has nothing to do with it. Gidea Park drivers depot exists as there are 9 trains stabled there. It has always been an important depot for the GE side. Shenfield depot could have more drivers based there instead but is constrained by the accommodation available.
Regarding extension to Ebbsfleet, are TfL one of those widely backing the proposal? I may have missed it but can’t recall any enthusiasm from them for going to Ebbsfleet.
Doesn't it go to six from May?I don't think the current situation where most crossrail services terminate at Paddington and four trains an hour shuttle from Paddington High level to heathrow is sustainable.
Yes but only half hourly to T5, the other four will go to T4Doesn't it go to six from May?
But you can change at Heathrow Central for an HEX to terminal 5 free of chargeYes but only half hourly to T5, the other four will go to T4
Indeed, but your average tourist heading back to Heathrow on Crossrail dosent know that and neither will they want to hoof their luggage off and on trains at T123 so they hang around on the platform with all their luggage for up to half an hour, which given that only at Moorgate/Liverpool street is there a continous walkway tunnel between the platforms is far from ideal in the peaks and then squeeze onto the packed half hourly T5 service.But you can change at Heathrow Central for an HEX to terminal 5 free of charge
They're not empty. Almost all seats were taken when I used the Express last month, and you couldn't do anything with the paths anyway.Meanwhile four half empty trains an hour shuttle from T5 to Paddington High level taking four fast line paths and obstructing two inter city length platforms. Its crackers.
I dont see the point.No, the main issue is finding a couple of billion quid.
Other than use them for GW intercities and generally taking pressure off the fast lines.They're not empty. Almost all seats were taken when I used the Express last month, and you couldn't do anything with the paths anyway.
I suspect there are contractual issues with BAA impeding such a move though.
Millions and millions of speculative discussions on this topic have determined that GWR Intercity services on Heathrow Express paths will catch up the train ahead at Slough.Other than use them for GW intercities and generally taking pressure off the fast lines.
Yes I suspect it would need an act of parliament to and BAAs owners would be very cross.That’s putting it mildly!
Not if it dosent stop there. Slough stops cause enough intercity hold ups of trains behind now, negating much of the benefits of the Reading rebuild. Now that Crossrail serves Slough, ditch them during peak times just as Woking and Clapham stops are ditched on peak hour fasts to Waterloo.Millions and millions of speculative discussions on this topic have determined that GWR Intercity services on Heathrow Express paths will catch up the train ahead at Slough.
Yes I suspect it would need an act of parliament to and BAAs owners would be very cross.
If and when Crossrail is ever extended to Dartford, there will be conflicting movements between up Crossrail and Down Southeastern services restricting capacity, which would not have happened if a Finchley Road arrangement had been designed.
I think that is certainly one of the options. Probably the only feasible one (and would presumably mean no extension to Gravesend)Would they? I was under the impression that the (unfunded and therefore admittedly vague) plans for extending the EL to 'Ebbsfleet' involved 4-tracking the line from Abbey Wood to Dartford, so EL trains would be on separate tracks from SouthEastern, and no conflicting moves at Abbey Wood would occur?
That was the original plan, the latest proposals are the cheaper version reusing existing Abbey Wood to Gravesend tracks altering several junctions to uplift capacity and turnback existing Southeastern services earlier. It still costs around £3bn and as such doesn't seem that likely to happen.Would they? I was under the impression that the (unfunded and therefore admittedly vague) plans for extending the EL to 'Ebbsfleet' involved 4-tracking the line from Abbey Wood to Dartford, so EL trains would be on separate tracks from SouthEastern, and no conflicting moves at Abbey Wood would occur?
This is the problem belowI don't think the current situation where most crossrail services terminate at Paddington and four trains an hour shuttle from Paddington High level to heathrow is sustainable.
No chance of crossing on the flat and no flyover exists to get to the Mains from the Crossrail tunnels.Re HEx: You might get cheaper fares but I doubt Crossrail is going to go cross to the Mains at Portobello.
No that plan addresses the capacity constraints at Dartford and NW of Dartford, the potential capacity issues east of Dartford can be addressed with these planned service tweaks:I think that is certainly one of the options. Probably the only feasible one (and would presumably mean no extension to Gravesend)
The Slough calls won't be Intercity from May, they are semi fast 387 commuter services, much like the MML Thameslink services which are first stop St AlbansYes I suspect it would need an act of parliament to and BAAs owners would be very cross.
But the bullet will have to be bitten, if not now, when Old Oak Common HS2 interchange opens and hordes of Northerners with mountains of luggage also pile on to Heathrow crossrail services too.
== Doublepost prevention - post automatically merged: ==
Not if it dosent stop there. Slough stops cause enough intercity hold ups of trains behind now, negating much of the benefits of the Reading rebuild. Now that Crossrail serves Slough, ditch them during peak times just as Woking and Clapham stops are ditched on peak hour fasts to Waterloo.
St Albans used to get Midland Main Line intercities calling, but that was ditched when Thameslink came along with increased services and the world didn't end.
That was the original plan, the latest proposals are the cheaper version reusing existing Abbey Wood to Gravesend tracks altering several junctions to uplift capacity and turnback existing Southeastern services earlier. It still costs around £3bn and as such doesn't seem that likely to happen.
Apart from Basingstoke if they electrifed it, Bedyn/Westbury if they reversed the imposition of a Newbury/Bedwyn shuttle and fast to Bristol via Bristol Parkway as originally planned, making the semifast Exeter/Paigntons hourly etc.The Slough calls won't be Intercity from May, they are semi fast 387 commuter services, much like the MML Thameslink services which are first stop St Albans
There is no capacity to do anything meaningful with the HEx paths.
There's nowhere to stick the trains when they get to Reading anyway