810001 and another 810 are in the test shed formed up as a 5 car train at Merchant Park, they have been through single car testing.It’s been mentioned in the Avanti rolling stock thread that the first 805 is going to be moving to Old Dalby next week for testing. Does anybody know whether the first 810 is closing in on that milestone too? And in any case, does anybody have any general 810 updates since the previous post in mid-September?
These are yet to be seen outside as a whole train, (single cars have been seen outside occasionally over the last few weeks).