Merseyrail legacy fleet updates (Class 507/508)

Status
Not open for further replies.

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
508140 did indeed take its leave of the Merseyrail network in last night's steady rain. A few bits were robbed such as light fittings to keep the others going. This one was slightly sombre as 508140 was one of my favourite 508s and it ended its days riding well unlike 508143 which was appalling.

Not on this day though (9/8/22), failed at Hall Road and consequently being push by 507026 to Kirkdale, see: https://www.flickr.com/photos/8arail/52348614264/in/dateposted-public/
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

L401CJF

Established Member
Joined
16 Oct 2019
Messages
1,486
Location
Wirral
508140 did indeed take its leave of the Merseyrail network in last night's steady rain. A few bits were robbed such as light fittings to keep the others going. This one was slightly sombre as 508140 was one of my favourite 508s and it ended its days riding well unlike 508143 which was appalling.
Looking at the footage the door steps along with cab window handrails (rear cab) seem to have been nicked too.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,044
Location
Surrey
Looking at the footage the door steps along with cab window handrails (rear cab) seem to have been nicked too.
Surely would have been sensible to just leave it at Kirkdale so anything could have been taken from it to keep the remaining fleet operational although are we getting to a point that they know more donors are going to be coming because short of a heavy overhaul they can't stay in traffic.
 

MR-507508

Member
Joined
17 Jan 2020
Messages
1,022
Location
North West
508140 did indeed take its leave of the Merseyrail network in last night's steady rain. A few bits were robbed such as light fittings to keep the others going. This one was slightly sombre as 508140 was one of my favourite 508s and it ended its days riding well unlike 508143 which was appalling.
Did any parts of 508134 or 508110 ever return to the network?
By parts, I am actually thinking of one or two bogies.
I remember seeing a photo of some bogies (2 I think) being delivered to Birkenhead North E.M.U.D. sometime last year, does anyone know if these were salvaged and escaped scrap from 508134 and/or 508110?
 

315801

Member
Joined
12 Jul 2022
Messages
201
I think the salvage of all usable parts including steps, collector shoes, cab desk equipment ( speedo, brake gauge etc ) and the motors if required should take place before units are sent away.

At least this would ensure that there are sufficient parts available if needed and bogies could always be sent back from newport in case a bogie swap was required.
 
Joined
1 Sep 2018
Messages
490
Location
Malvern to Minffordd
I think the salvage of all usable parts including steps, collector shoes, cab desk equipment ( speedo, brake gauge etc ) and the motors if required should take place before units are sent away.
See here, taken through the cab window at Crewe during the run round.
Looking at the footage the door steps along with cab window handrails (rear cab) seem to have been nicked too.
Yes, these had been removed.
508140 did indeed take its leave of the Merseyrail network in last night's steady rain. A few bits were robbed such as light fittings to keep the others going. This one was slightly sombre as 508140 was one of my favourite 508s and it ended its days riding well unlike 508143 which was appalling.
Several seats taken out too!
Oh, and as for the steady rain....
It was like a monsoon at Crewe!
 

Attachments

  • IMG_20221010_014809.jpg
    IMG_20221010_014809.jpg
    3.3 MB · Views: 196

prod_pep

Established Member
Joined
8 Aug 2010
Messages
1,711
Location
Liverpool
The 507/8s' door steps are removed as standard practice whenever they are hauled outside the Merseyrail network.

Any parts to be retained as spares will have to be salvaged before the condemned unit is hauled away, as don't they have a 'total destruction order' placed upon them as other scrap units do?
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,894
Any parts to be retained as spares will have to be salvaged before the condemned unit is hauled away, as don't they have a 'total destruction order' placed upon them as other scrap units do?
There's no reason parts can't be removed at the scrapyard with agreement from them. As happened with at least the 91s that went to Newport, I believe.
 

warwickshire

On Moderation
Joined
6 Feb 2020
Messages
2,304
Location
leamingtonspa
37884 CEPHEUS on form with 508140 through Wem around 20 Late with 5q78 0849 Crewe to Newport Docks Simms with 37884 full throttle through the valley there. However 508140 has departed.
 

WesternLancer

Veteran Member
Joined
12 Apr 2019
Messages
15,326
Apols as I am sure it will be in the thread somewhere, but how long are 507s and 508s likely to still be in operation on Merseyrail?

Having recently had the chance to go to Sussex for a day on 313s, it occurs to me to wonder how long I have to enjoy 507s and 508s before withdrawal.

If a useful post up thread feel free to redirect me, but all advice welcome. Many thanks.
 

Razorblades

Member
Joined
17 Dec 2021
Messages
454
Location
Copshaw Holm, Scottish Borders
Apols as I am sure it will be in the thread somewhere, but how long are 507s and 508s likely to still be in operation on Merseyrail?

Having recently had the chance to go to Sussex for a day on 313s, it occurs to me to wonder how long I have to enjoy 507s and 508s before withdrawal.

If a useful post up thread feel free to redirect me, but all advice welcome. Many thanks.

Opinions vary, but you've undoubtedly got a few weeks left before the new fleet starts to phase-in. If I was a betting man, I reckon you'll have until May 2023 realistically.
 

Sam 76

Member
Joined
10 Nov 2021
Messages
499
Location
Southport.
Opinions vary, but you've undoubtedly got a few weeks left before the new fleet starts to phase-in. If I was a betting man, I reckon you'll have until May 2023 realistically.
I think really it will be at least late 2023 if not 2024. Most units aren’t in the country yet and will have to undergo the tests the current ones have done. I think Merseyrail themselves said it’s over a 15 month period if I’m not mistaken
 

WesternLancer

Veteran Member
Joined
12 Apr 2019
Messages
15,326
Opinions vary, but you've undoubtedly got a few weeks left before the new fleet starts to phase-in. If I was a betting man, I reckon you'll have until May 2023 realistically.
Thanks for that analysis - helpful to read. Was wondering to what extent the December timetable change might be a cut off, but sounds like it may not be that imminent...

== Doublepost prevention - post automatically merged: ==

I think really it will be at least late 2023 if not 2024. Most units aren’t in the country yet and will have to undergo the tests the current ones have done. I think Merseyrail themselves said it’s over a 15 month period if I’m not mistaken
Thanks - again v helpful to read that take - tho I may try and plan a visit sooner rather than later maybe! But sounds like May 2023 timetable change is probably not even the cut off then.
 

Sam 76

Member
Joined
10 Nov 2021
Messages
499
Location
Southport.
Thanks for that analysis - helpful to read. Was wondering to what extent the December timetable change might be a cut off, but sounds like it may not be that imminent...

== Doublepost prevention - post automatically merged: ==


Thanks - again v helpful to read that take - tho I may try and plan a visit sooner rather than later maybe! But sounds like May 2023 timetable change is probably not even the cut off then.
I would say that there will be a good number around after May 2023 even up to the end of the year. I commute on them each day and some of the 507’s getting refitted mechanically and a lick of paint at the moment so they are defo trying to extend their lives for more than a few months
 

Vespa

Established Member
Joined
20 Dec 2019
Messages
1,733
Location
Merseyside
You may be looking at gradual change over of possibly three years as they get withdrawn once replacement counterpart 777 completed their fault free miles and handed over to Merseyrail.

Make the most of it, I would imagine there would be some farewell tours and ticket getting sold out, souvenirs for sale etc
 

prod_pep

Established Member
Joined
8 Aug 2010
Messages
1,711
Location
Liverpool
They have mentioned a 15-month roll-out of the new stock which, even if the first 777 entered service tomorrow, would see us into 2024.

The 507 overhauls and paint touch-ups are out of necessity really as each unit progressively reaches a mileage limit. They generally get between five and six years out of a unit between overhauls, but I highly doubt they expect to have 507s still running in 2028 - we can dream!

Speaking of which, 507023 is now back in service having received its overhaul. Outside Birkenhead North depot yesterday was 507001 which I believe is approaching its turn (along with 507007 and 507027).
 

Sam 76

Member
Joined
10 Nov 2021
Messages
499
Location
Southport.
Yeah it will be interesting to see how quickly they are reduced to just 6 car peak services on the Southport and Chester services. I imagine that they could be like the 315s and just do that for a while before finally saying their farewell, having grown up with them all my life it will be very strange to see them go
 

8A Rail

Established Member
Joined
6 Dec 2012
Messages
1,351
Location
Mars
I am a little surprised that some people have not mentioned that Merseyrail intend to keep 10 Class 507's operating until some NR works have been completed, such as work need to be carried out at Southport before that location is able of taking a pair of Class 777's. I think there is other work in the locations need to be carried out, this includes the remedial work at Liverpool Central Station next month. I certainly think that both Class 507 and Class 508 units will be around all of next year for sure and some have mentioned May 2023.
 

Sam 76

Member
Joined
10 Nov 2021
Messages
499
Location
Southport.
I am a little surprised that some people have not mentioned that Merseyrail intend to keep 10 Class 507's operating until some NR works have been completed, such as work need to be carried out at Southport before that location is able of taking a pair of Class 777's. I think there is other work in the locations need to be carried out, this includes the remedial work at Liverpool Central Station next month. I certainly think that both Class 507 and Class 508 units will be around all of next year for sure and some have mentioned May 2023.
Yep that’s the thing. So even if it’s 3 or 4 diagrams during the peaks they will be around for a while even if not all the time
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,239
I am a little surprised that some people have not mentioned that Merseyrail intend to keep 10 Class 507's operating until some NR works have been completed, such as work need to be carried out at Southport before that location is able of taking a pair of Class 777's. I think there is other work in the locations need to be carried out, this includes the remedial work at Liverpool Central Station next month. I certainly think that both Class 507 and Class 508 units will be around all of next year for sure and some have mentioned May 2023.
That may all be academic now. The delays to introduction have meant the NR works will be complete (or very close to compete) by the time the other diagrams are converted to 777 operation.
 

D821

Member
Joined
1 Sep 2021
Messages
628
Location
The Wirral
I was near Birkenhead North the other day and saw a lorry with a load of bogies on it pulling away, not sure if they were for the scrap or for refurbishment.
 

Liverpool 507

Member
Joined
17 Jan 2018
Messages
642
Location
Merseyside
I was near Birkenhead North the other day and saw a lorry with a load of bogies on it pulling away, not sure if they were for the scrap or for refurbishment.
It was said at one point that Stadler where going to use Birkenhead North’s heavy maintenance shed as a bogie refurbishment facility for all other UK Stadler stock.

Presumably this would be once 507/8s are out of the picture.
 

Ribbleman

Member
Joined
12 Jun 2019
Messages
328
That may all be academic now. The delays to introduction have meant the NR works will be complete (or very close to compete) by the time the other diagrams are converted to 777 operation.
At one point there were going to be 14 x Class 507 being kept on extended leases from Angel Trains after all the 777s had entered service. This was to be until NR had finished track and signalling alterations. However, as Skie points out, the continued delay to the 777s entering service may mean that retention of those 507s is unnecessary.
 

WesternLancer

Veteran Member
Joined
12 Apr 2019
Messages
15,326
I would say that there will be a good number around after May 2023 even up to the end of the year. I commute on them each day and some of the 507’s getting refitted mechanically and a lick of paint at the moment so they are defo trying to extend their lives for more than a few months
Thanks for that take.

== Doublepost prevention - post automatically merged: ==

You may be looking at gradual change over of possibly three years as they get withdrawn once replacement counterpart 777 completed their fault free miles and handed over to Merseyrail.

Make the most of it, I would imagine there would be some farewell tours and ticket getting sold out, souvenirs for sale etc
Thanks @Vespa - useful insight and appreciated.

== Doublepost prevention - post automatically merged: ==

They have mentioned a 15-month roll-out of the new stock which, even if the first 777 entered service tomorrow, would see us into 2024.

The 507 overhauls and paint touch-ups are out of necessity really as each unit progressively reaches a mileage limit. They generally get between five and six years out of a unit between overhauls, but I highly doubt they expect to have 507s still running in 2028 - we can dream!

Speaking of which, 507023 is now back in service having received its overhaul. Outside Birkenhead North depot yesterday was 507001 which I believe is approaching its turn (along with 507007 and 507027).
Also - many thanks, helpful to consider this.

In general, the whole thing has to be a good excuse to visit Liverpool IMHO - one of the world's greatest cities with such a superb heritage. :D

Occured to me to wonder if hosting eurovision was going to have an impact on the need for rolling stock - tho it does not sound like a new fleet will be able to be rolled out in time for that in May '23!
 
Last edited:

AMD

Member
Joined
6 Dec 2017
Messages
774
That’s so odd. Are they going to have to move the points and signal to accommodate ?
Platforms 2&3 are being extended into the concourse - the gateline is moving through 90deg so from the side of M&S to the back of the M to Go shop, with the buffers sitting just on the town side of where the gateline is right now. The back corner of the M to go shop is being chopped off to make it all fit as otherwise one of the wide gates would open almost onto the building - to give you an idea of where it's all going.
 

Sam 76

Member
Joined
10 Nov 2021
Messages
499
Location
Southport.
Platforms 2&3 are being extended into the concourse - the gateline is moving through 90deg so from the side of M&S to the back of the M to Go shop, with the buffers sitting just on the town side of where the gateline is right now. The back corner of the M to go shop is being chopped off to make it all fit as otherwise one of the wide gates would open almost onto the building - to give you an idea of where it's all going.
Ahh ok wow that’s a big job I suspect Southport will be shut for many weeks at some point then
 

Liverpool 507

Member
Joined
17 Jan 2018
Messages
642
Location
Merseyside
Ahh ok wow that’s a big job I suspect Southport will be shut for many weeks at some point then
Merseyrail will probably start and terminate at Hillside. Northern may get away with using Platforms 5 and 6, with the side gate (London Street) used for access.
 