Future of SWR's class 158/159 fleet

Status
Not open for further replies.

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,375
Location
belfast
If we didn't already have 3rd rail covering fairly long distances, there's no way we'd choose to do so now. No other countries use it on the scales and at the speeds we do, and that's the case for a good reason.

That said, 3rd rail all the way to Exeter would still be a better solution than either hydrogen or batteries.
an even better option would be to pick a sensible place to switch from 3rd rail to overhead and electrify most of the distance using OHLE. And electrify GWML to Exeter as well while we're at it. If only the government would provide the funding.
TBH, battery is probably a better option than installing so much new 3rd rail
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Xavi

Member
Joined
17 Apr 2012
Messages
854
No other countries use it on the scales and at the speeds we do, and that's the case for a good reason.
However, building 3rd rail in Exeter seems so unlikely as to be impossible
I thought we were talking batteries and recharging, not full scale electrification. In and around stations could be plausible to avoid 25KV AC capability and the associated raising / lowering of pantograph.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,600
Location
Northampton
Why? NR and ORR are considering reversing previous policy and allowing extensions of 3rd rail.
The review has been kicked into the long grass more times than I can count (we're in a 'Which Christmas?' stage), which suggests that their conclusion is the one people don't want to hear.
When I worked with NR strategic planning there was certainly an assumption that battery technology would substitute for any extension of the 3rd rail network.

Also, on the West of England line, 3rd rail is completely the wrong choice. It's not got the traffic to justify using such a low voltage, it's over far too long a distance, and it's within the area of a natural extension of the OLE network.

== Doublepost prevention - post automatically merged: ==

I thought we were talking batteries and recharging, not full scale electrification. In and around stations could be plausible to avoid 25KV AC capability and the associated raising / lowering of pantograph.
In and around stations the risk of accidentally coming into contact with a live rail is a far higher concern than putting the pan up and down. There's a reason OLE i used by mainline railways the world over, and 3rd rail is confined to urban metro-type systems.
 
Last edited:

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
TBH, battery is probably a better option than installing so much new 3rd rail
Unless a major leap forward in battery technology is made, I'll remain highly sceptical of its use on mainline railways. The weight, energy density, and requirement for large quantities of rare-earth metals mean that OHLE will continue to be the best solution to decarbonising the railway.

Battery is flavour of the month at the moment, but where are the examples of widespread reliable use on railways? It has a role in niche applications, but that's about it.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,600
Location
Northampton
Unless a major leap forward in battery technology is made, I'll remain highly sceptical of its use on mainline railways. The weight, energy density, and requirement for large quantities of rare-earth metals mean that OHLE will continue to be the best solution to decarbonising the railway.

Battery is flavour of the month at the moment, but where are the examples of widespread reliable use on railways? It has a role in niche applications, but that's about it.
Have a look at Germany and Japan. The traffic pattern on the GB network is well-suited to battery extensions of electrified core routes, and battery technology in cars is leaping forward at a considerable rate, assisting rail technology as it does so.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
Have a look at Germany and Japan. The traffic pattern on the GB network is well-suited to battery extensions of electrified core routes, and battery technology in cars is leaping forward at a considerable rate, assisting rail technology as it does so.
I still stand by my assertion that for a route as long (and relatively frequently served) as the WofE line, OHLE makes far more sense. It's an established technology that is well understood, and doesn't have the added environmental costs of sourcing the materials for batteries- something that battery advocates conveniently ignore.
 

Xavi

Member
Joined
17 Apr 2012
Messages
854
In and around stations the risk of accidentally coming into contact with a live rail is a far higher concern than putting the pan up and down. There's a reason OLE i used by mainline railways the world over, and 3rd rail is confined to urban metro-type systems.
We knew that post was coming. Practicality over ‘concern’ needs consideration.

== Doublepost prevention - post automatically merged: ==

I still stand by my assertion that for a route as long (and relatively frequently served) as the WofE line, OHLE makes far more sense. It's an established technology that is well understood, and doesn't have the added environmental costs of sourcing the materials for batteries- something that battery advocates conveniently ignore.
Agree that full OHLE is the only sensible way to go, unfortunately we need a change of government policy to do so.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,600
Location
Northampton
I still stand by my assertion that for a route as long (and relatively frequently served) as the WofE line, OHLE makes far more sense. It's an established technology that is well understood, and doesn't have the added environmental costs of sourcing the materials for batteries- something that battery advocates conveniently ignore.
I agree, but the cost is hard to justify.
We knew that post was coming. Practicality over ‘concern’ needs consideration.
The concern is real. People die from touching 3rd rail, and a pantograph going up and down is not a problem at all.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Have a look at Germany and Japan. The traffic pattern on the GB network is well-suited to battery extensions of electrified core routes, and battery technology in cars is leaping forward at a considerable rate, assisting rail technology as it does so.
Possibly where the battery charging can be done from existing ac overhead systems. Where you are trying to charge the batteries from existing dc third rail systems you either need huge numbers of battery units so they can trickle charge themselves whilst on wholly electrified services or massive upgrades to the existing dc electrification most of which was only upgraded to the anticipated maximum load when the electrostar/desiro units were introduced in the early 2000s.
 

Xavi

Member
Joined
17 Apr 2012
Messages
854
The concern is real. People die from touching 3rd rail, and a pantograph going up and down is not a problem at all.
Risk, practicality and cost would all feature in a cost-benefit analysis.
 

Xavi

Member
Joined
17 Apr 2012
Messages
854
And almost universally 3rd rail fails that analysis.
Not sure an independent risk assessment would be enough to significantly impact the overall cost-benefit analysis although ORR could revert to blanket ban, of course.

I support OHLE over 3rd rail, however, DfT policy needs a significant shift otherwise lower up-front investment cost options (batteries as part of the train would be leased) will be front of the queue in the drive to net zero. Look no further than Merseyrail (metro I know) and Scotrail (more akin to WofE but sensibly OHLE).

== Doublepost prevention - post automatically merged: ==

Possibly where the battery charging can be done from existing ac overhead systems. Where you are trying to charge the batteries from existing dc third rail systems you either need huge numbers of battery units so they can trickle charge themselves whilst on wholly electrified services or massive upgrades to the existing dc electrification most of which was only upgraded to the anticipated maximum load when the electrostar/desiro units were introduced in the early 2000s.
If the electrification / battery solution was to be used on WofE, the battery charging would principally be on new (relatively lightly used) sections of electrification west of Worting Junction (ideally OHLE). The software would identify where charging could be done (not required for traction) on existing sections within the maximum loads and there would be regenerative braking too.

In the meantime I will be happy to travel on 158/9s as long as it's viable to keep them operating efficiently. Superb trains despite their age and only occasionally let down by the air conditioning. I was only speaking to a friend on Saturday who told me he often uses them (for comfort) from Exeter to reach Canary Wharf via Jubilee Line rather than GWR.
 
Last edited:

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Not sure an independent risk assessment would be enough to significantly impact the overall cost-benefit analysis although ORR could revert to blanket ban, of course.

I support OHLE over 3rd rail, however, DfT policy needs a significant shift otherwise lower up-front investment cost options (batteries as part of the train would be leased) will be front of the queue in the drive to net zero. Look no further than Merseyrail (metro I know) and Scotrail (more akin to WofE but sensibly OHLE).

== Doublepost prevention - post automatically merged: ==


If the electrification / battery solution was to be used on WofE, the battery charging would principally be on new (relatively lightly used) sections of electrification west of Worting Junction (ideally OHLE). The software would identify where charging could be done (not required for traction) on existing sections within the maximum loads and there would be regenerative braking too.

In the meantime I will be happy to travel on 158/9s as long as it's viable to keep them operating efficiently. Superb trains despite their age and only occasionally let down by the air conditioning. I was only speaking to a friend on Saturday who told me he often uses them (for comfort) from Exeter to reach Canary Wharf via Jubilee Line rather than GWR.
Hate to point it out but net zero in UK electric generation on current policies is 30 years plus away. Taking a global UK view (particularly in England) huge government investment on marginal secondary diesel powered routes shouldnt be a priority.
 

Xavi

Member
Joined
17 Apr 2012
Messages
854
Hate to point it out but net zero in UK electric generation on current policies is 30 years plus away. Taking a global UK view (particularly in England) huge government investment on marginal secondary diesel powered routes shouldnt be a priority.
The 30-year target is correct. However, the current operator has identified the present trains will require replacement in 5-8 years (they won't last another 30 years) and new diesel only trains won't be leased for routes serving London. Not sure I would describe it as a 'huge' investment either.
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
Although SWR do not serve Barnstaple and while similar units are (sometimes) currently used on the Barnstaple branch, if new units are being considered, GWR services from Barnstaple to Exeter with a journey time of just over an hour my not require the same type of rolling stock as over three and a half hour end to end journeys on the Waterloo to Exeter service

Exeter-Barnstaple isn't a meandering stop-everry-few-mins branch, it's a similar service to the WoE ( past Salisbury at least ). We're looking at Salisbury-Exeter vs Barnstaple-and-back for timings if we're looking at battery segments rather than Waterloo-Exeter, and I'm fairly sure ( I can't remember the full speed timing of Salisbury to Exeter at the moment, there's still speed restrictions ) that especially including hills, Exeter-Barnstaple-Exeter would be manageable by the same stock Salisbury-Bristoll too, I'd imagine.

There's no practical difference between a 159 and a 158 whatever is procured should be looked at with an eye for replacing all of them ( with some modular propulsion ), not just the WoE route.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Not sure an independent risk assessment would be enough to significantly impact the overall cost-benefit analysis although ORR could revert to blanket ban, of course.

I support OHLE over 3rd rail, however, DfT policy needs a significant shift otherwise lower up-front investment cost options (batteries as part of the train would be leased) will be front of the queue in the drive to net zero. Look no further than Merseyrail (metro I know) and Scotrail (more akin to WofE but sensibly OHLE).

== Doublepost prevention - post automatically merged: ==


If the electrification / battery solution was to be used on WofE, the battery charging would principally be on new (relatively lightly used) sections of electrification west of Worting Junction (ideally OHLE). The software would identify where charging could be done (not required for traction) on existing sections within the maximum loads and there would be regenerative braking too.

In the meantime I will be happy to travel on 158/9s as long as it's viable to keep them operating efficiently. Superb trains despite their age and only occasionally let down by the air conditioning. I was only speaking to a friend on Saturday who told me he often uses them (for comfort) from Exeter to reach Canary Wharf via Jubilee Line rather than GWR.
Any assessment of whether 3rd rail should be extended, would see that there is more accidents with people than OHLE.

Whilst long term an ideal solution would be to have trains say running 3rd rail to Basingstoke, then OHLE down to Exeter St David's, I cannot see that happening. So in the same way that GWR have class 800 & 802 hybrid units that can be converted to be battery/OHLE only units then any replacement for class 158/159 should be the same with the ability to run on 3rd rail. But in the short term, the new trains would run on 3rd rail to Basinsgstoke and then run on either diesel/battery/hydrogen to Exeter ST David. If battery is used though, you would need a point at Exeter St David that has an OHLE section that a pantograph could be lifted up to so that the batteries could be recharged while either in any sidings or at the station. This would be the same solution as has been mentioned in the Speculative Discussion forums for other lines such as the line to Uckfield and trains travelling between Eastbourne and Ashford.

Unless a major leap forward in battery technology is made, I'll remain highly sceptical of its use on mainline railways. The weight, energy density, and requirement for large quantities of rare-earth metals mean that OHLE will continue to be the best solution to decarbonising the railway.

Battery is flavour of the month at the moment, but where are the examples of widespread reliable use on railways? It has a role in niche applications, but that's about it.
I still stand by my assertion that for a route as long (and relatively frequently served) as the WofE line, OHLE makes far more sense. It's an established technology that is well understood, and doesn't have the added environmental costs of sourcing the materials for batteries- something that battery advocates conveniently ignore.
So for the same distance and possibly longer, Germany can have battery trains such as reported in https://www.railjournal.com/fleet/german-regions-order-63-battery-trains/

You already have https://www.alstom.com/press-releas...-test-first-battery-train-passenger-operation that does 94.5 miles just on battery power. I do not suppose that it will be very long before a train on battery power will be able to do about 130 - 140 miles.

I have not been able to workout, but what is the distance in miles between the places mentioned in https://www.railjournal.com/fleet/german-regions-order-63-battery-trains/ that the BEMU units will travel?
 

dciuk

Member
Joined
1 May 2018
Messages
163
Exeter-Barnstaple isn't a meandering stop-everry-few-mins branch, it's a similar service to the WoE ( past Salisbury at least ). We're looking at Salisbury-Exeter vs Barnstaple-and-back for timings if we're looking at battery segments rather than Waterloo-Exeter, and I'm fairly sure ( I can't remember the full speed timing of Salisbury to Exeter at the moment, there's still speed restrictions ) that especially including hills, Exeter-Barnstaple-Exeter would be manageable by the same stock Salisbury-Bristoll too, I'd imagine.

There's no practical difference between a 159 and a 158 whatever is procured should be looked at with an eye for replacing all of them ( with some modular propulsion ), not just the WoE route.
Risking going off topic here, but if GWR were looking at purchasing a new replacement for their Devon and Cornwall Branch lines they might prefer to have a single universal fleet rather than a handful that can run the Barnstable branch to keep them the same as those used to Salisbury and beyond. While perhaps if they were suitable all those branch lines could use them even though 90mph (although purpose built units for SWR would probably be 100mph or higher) would be overkill in most cases and some of the branches such as Looe would no doubt struggle to accomodate that grade of train). Exeter to Salisbury/Waterloo is a long distance main line service which many passangers will be taking journeys of well over 2 hours, where as the Barnstable branch is mainly carrying passengers about an hours journey to their nearest large urban area to work or shop or visit leisure venues not available more locally or to connect onto other longer distance services.

== Doublepost prevention - post automatically merged: ==

Any assessment of whether 3rd rail should be extended, would see that there is more accidents with people than OHLE.
A lot of the countries busiest stations use 3rd rail and have done for years, while OHLE might be less dangerous than 3rd rail would 3rd rail at say Salisbury be more of a problem than 3rd rail at Basingstoke and if we are not looking at taking it away from existing routes, forcing extentions of these routes to use OHLE creates a compatibility issue. I have not been there myself, but I am pretty sure the recently opened Northern line extenstion uses 3rd (and/or 4th) rail

== Doublepost prevention - post automatically merged: ==

Whilst long term an ideal solution would be to have trains say running 3rd rail to Basingstoke, then OHLE down to Exeter St David's, I cannot see that happening. So in the same way that GWR have class 800 & 802 hybrid units that can be converted to be battery/OHLE only units then any replacement for class 158/159 should be the same with the ability to run on 3rd rail. But in the short term, the new trains would run on 3rd rail to Basinsgstoke and then run on either diesel/battery/hydrogen to Exeter ST David. If battery is used though, you would need a point at Exeter St David that has an OHLE section that a pantograph could be lifted up to so that the batteries could be recharged while either in any sidings or at the station.
Diesel is not one of the options being considered according to the report and batteries are only being considered with a capacity of 60-80km (although in a few years that might have improved), which would mean a few stretches between Basingstoke and Exeter would need some for of electricfication (or lots of short Station areas to get maxium charging out of minimum infrasturcture). Wether that be 3rd rail DC or overhead AC.
 
Last edited:

Xavi

Member
Joined
17 Apr 2012
Messages
854
But in the short term, the new trains would run on 3rd rail to Basinsgstoke and then run on either diesel/battery/hydrogen to Exeter ST David. If battery is used though, you would need a point at Exeter St David that has an OHLE section that a pantograph could be lifted up to so that the batteries could be recharged while either in any sidings or at the station.
You’re way off the mark if you think Basingstoke to Exeter is doable on batteries. You would need sections every 20-30 miles for a reliable service whatever the Germany distance tests have proven, hence me pointing out that 3rd rail would be more practical and less expensive to install - you’d need a sub-station for each section whether it was OHLE or 3rd rail. Rail is the safest form of transportation whether it’s 3rd rail or not; Mk 3 carriages or not. IMO ORR needs to reevaluate some policies.

I’d use OHLE (preferably without batteries) but DfT hates up-front capital cost - another area for reevaluation.

== Doublepost prevention - post automatically merged: ==

Risking going off topic here, but if GWR were looking at purchasing a new replacement for their Devon and Cornwall Branch lines they might prefer to have a single universal fleet rather than a handful that can run the Barnstable branch to keep them the same as those used to Salisbury and beyond.
I agree this would be a good approach. I wrote on another thread that it will be proposed (not sure who by in this manufacturer, ROSCO, TOC, NR, GBR world) to replace the GWR regional and SWT diesel fleet with units with one standard fleet of 25KV ac / 750 dc units plus interchangeable battery / diesel module. Gunnislake and Looe for Vivarail. This would provide a good politically valuable workload for Newport or Newton Aycliffe.

The 15x/16x fleet is on its last legs and will have to be replaced with new.

I predict it will be proposed but whether it will be funded by DfT is another matter.
 
Last edited:

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
You’re way off the mark if you think Basingstoke to Exeter is doable on batteries. You would need sections every 20-30 miles for a reliable service whatever the Germany distance tests have proven, hence me pointing out that 3rd rail would be more practical and less expensive to install - you’d need a sub-station for each section whether it was OHLE or 3rd rail. Rail is the safest form of transportation whether it’s 3rd rail or not; Mk 3 carriages or not. IMO ORR needs to reevaluate some policies.

I’d use OHLE (preferably without batteries) but DfT hates up-front capital cost - another area for reevaluation.
More than 30 miles, Stadler have managed 90 miles though its still far of a round trip on the unelectrified section.
 

jackot

Member
Joined
1 Aug 2021
Messages
343
Location
Surrey
I agree this would be a good approach. I wrote on another thread that it will be proposed (not sure who by in this manufacturer, ROSCO, TOC, NR, GBR world) to replace the GWR regional and SWT diesel fleet with units with one standard fleet of 25KV ac / 750 dc units plus interchangeable battery / diesel module. Gunnislake and Looe for Vivarail. This would provide a good politically valuable workload for Newport or Newton Aycliffe.
I’d also say the same. Having a more standardised fleet between multiple operators would negate the future annoyance of small micro fleets (think class 175s). Both operators have very similar requirements for their units and are both owned by First Group. Both could probably do with a variant with end doors (suited for Waterloo to Exeter and Cardiff to Portsmouth), as well as a variant with doors at thirds for most of GWRs Devon/Cornwall operations, SWRs Romsey to Salisbury, as well as an eventual replacement for the bodged 769s For GWR.
 

Xavi

Member
Joined
17 Apr 2012
Messages
854
More than 30 miles, Stadler have managed 90 miles though its still far of a round trip on the unelectrified section.
The 90 miles quoted requires a full charge and you won’t get that with recharging on the move unless the OHLE or 3rd rail is a considerable length. For reliability multiple shorter sections would be preferable.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,600
Location
Northampton
The 90 miles quoted requires a full charge and you won’t get that with recharging on the move unless the OHLE or 3rd rail is a considerable length. For reliability multiple shorter sections would be preferable.
Agreed. Salisbury-Tisbury, Sherborne-Crewkerne and east of Exeter would be the most obvious places to do so. However that would rely on OLE being extended to Exeter via Westbury and Castle Cary. Wiring Romsey-Westbury via Warminster (either batteries to bridge the gap or OLE to Eastleigh East and Redbridge Jns), extending the Exeter area to Pinhoe or Honiton, and then running a 'giant extension lead' from Castle Cary to Yeovil Junction (Pen Mill is a take it/leave it situation) to feed the central charging seciton.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
The 90 miles quoted requires a full charge and you won’t get that with recharging on the move unless the OHLE or 3rd rail is a considerable length. For reliability multiple shorter sections would be preferable.
Stadler claim 15 mins to recharge.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,375
Location
belfast
Stadler claim 15 mins to recharge.
Only if the power availability isn't limited, though

Realistically, a feeder station in or near Exeter, plus electrification going out from there on all lines would simultaneously work for the SWR new trains as well as making some progress in electrifying the western, allowing for cost sharing.

For the GWR branches, the best hope might be for the current diesel units to last long enough for the mainline to be electrified, then use battery units that charge when on the mainline. You could even start with that already for the thames valley branches (or they could be electrified, and use standard EMUs)
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
Only if the power availability isn't limited, though

Realistically, a feeder station in or near Exeter, plus electrification going out from there on all lines would simultaneously work for the SWR new trains as well as making some progress in electrifying the western, allowing for cost sharing.

For the GWR branches, the best hope might be for the current diesel units to last long enough for the mainline to be electrified, then use battery units that charge when on the mainline. You could even start with that already for the thames valley branches (or they could be electrified, and use standard EMUs)
There are no 'standard' EMUs suitable for Marlow unfortunately. Unless you managed to get permission to do 3rd rail and got it fitted before the 466s get sent off to Sims at Newport.
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
Risking going off topic here, but if GWR were looking at purchasing a new replacement for their Devon and Cornwall Branch lines they might prefer to have a single universal fleet rather than a handful that can run the Barnstable branch to keep them the same as those used to Salisbury and beyond. While perhaps if they were suitable all those branch lines could use them even though 90mph (although purpose built units for SWR would probably be 100mph or higher) would be overkill in most cases and some of the branches such as Looe would no doubt struggle to accomodate that grade of train). Exeter to Salisbury/Waterloo is a long distance main line service which many passangers will be taking journeys of well over 2 hours, where as the Barnstable branch is mainly carrying passengers about an hours journey to their nearest large urban area to work or shop or visit leisure venues not available more locally or to connect onto other longer distance services.

GWR have two sets of services in the region - metro-style, ie Exmouth-Paignton & the Cornish branches, and secondary services like Penzance-Cardiff, so they really need two sets of units anyway. Barnstaple ( and more so if they start sending them off to Axminster ) is nearer a long distance secondary than the Paignton metro, but if they need two sets of units it's not really relevant.
 

fandroid

Established Member
Joined
9 Nov 2014
Messages
2,566
Location
Hampshire
The SWR 159 replacement is covered in the latest edition of Rail magazine. SWR have put out a paper on achieving net zero carbon emissions by 2040, and they regard the 159s (and 158s) as being life expired by 2030. The talk is of battery/electric units to replace the fleet but for those to be feasible for the Exeter route there would have to be fast charging infrastructure beyond Basingstoke. I'm not sure if that solution really exists yet.

The 159s were one of the most reliable diesel fleets going, so SWR would have to be careful about the reliability costs of being too "innovative" with the replacements. Lobby hard for OLE beyond Worting Junction?
 

Sm5

Member
Joined
21 Oct 2016
Messages
1,013
Given railways are not going to be immune to further government cuts, and railways have been bloated with investment for some time..

Couldnt the operation be passed to GWR, routed from Paddington and run by 800’s ? Passengers change at Basingstoke for Waterloo, but otherwise could benefit a faster run to Paddington.
 