easter
New Member
I am on the 20:15 from leicester, got a seat, st pancras was hell, announcement at sp advising travel to peterborough via euston and nuneaton!
Power was initially shut off between Biggleswade (or thereabouts) and Alexandra Palace via both the main line and Hertford Loop.Any reason trains couldn't run Moorgate to HN and back (like they used to) this is affecting huge numbers for whom a service could surely run?
Would be Biggleswade as there's a Neutral Section there. Ditto Ally Pally as you have Wood Green FS.Power was initially shut off between Biggleswade (or thereabouts) and Alexandra Palace via both the main line and Hertford Loop.
People who followed that advice would have just missed the 1900 Sheffield to St P, and the 1938 and 2000 were cancelled. I think the 2101 is running.They seemed to have detrained an Azuma and at Doncaster and everyone crowding on the 3-car 158 1822 to Sheffield. Platform staff asking passengers to wait for the 1842 TPE if they can’t get on.
BBC News said:Rail passengers are being warned of serious disruption to mainline services following damage to overhead power lines in Hertfordshire.
BBC News said:A man was seriously injured after dangling an object from a bridge in Stevenage that hit the electric cables.
Perhaps this way was less busy? Was it? I mean it seems as if most went via Leicester and you went against the larger flow?
It may well be true - you don’t see sane people dangling objects near live electric wires. Alternatives it could be bored youths who don’t know better.
Wonder how that compares to travelling via Liverpool St and Cambridge.I am on the 20:15 from leicester, got a seat, st pancras was hell, announcement at sp advising travel to peterborough via euston and nuneaton!
Not really. No more than entrances to motorways need anything more than a 'no pedestrians' sign.There has been a lot of comment on some of the Infrastructure/Electrification threads over the years that the relatively recent change in Standards for bridge parapet height on electrified lines is 'un-necessary', 'gold plating' ''elf and safety gone mad', etc.
Doesn't this sort of incident suggest that making it harder or less tempting to hang or throw items over electrified lines might be a sound idea?
It is upsetting to see someone so eloquently spoken and intelligent be mocked by someone on here for not knowing the facts. I thought this forum was above that.Really quite hilarious to see a clueless Labour MP (Cov South) whose stuck on an Azuma tweet moaning about the service and why the railway needs to be taken into public ownership - on publicly-owned LNER![]()
In fairness, a set of barriers failing in the down position is pretty easily managed from a train running point of view, unless detection has been lost. This would mean signals being passed at danger, otherwise normal running of trains, but crossing closed to road traffic.Doesn't seem a good day for the ECML again, a few delays earlier due to the barriers failing in the down position at Bullpit Ln near Newark NG.
It’s not that I’m mocking her, it’s more the fact nationalisation is so very over-idealised by labour, and she doesn’t realise that she’s unconsciously complaining about how awful a nationalised service is. It’s ironic, that’s all, but I don’t want to derail the thread with politics.It is upsetting to see someone so eloquently spoken and intelligent be mocked by someone on here for not knowing the facts. I thought this forum was above that.
----
If debris has fallen from the bridge on the track, then my first thought is that maybe said bridge isn't up to scratch, but other than that there's nothing that can really be done, just an unfortunate situation with even news institutions with high reputation such as the BBC wrongly reporting at first.
Understandable. It probably was closer to misinformation known at the time. No harm done ^^It’s not that I’m mocking her, it’s more the fact nationalisation is so very over-idealised by labour, and she doesn’t realise that she’s unconsciously complaining about how awful a nationalised service is. It’s ironic, that’s all, but I don’t want to derail the thread with politics.
Criticising something without knowing the facts is something that should be criticised. No matter how eloquent or intelligent you may be, you should make sure that, at the very least, what you know is not incorrect.It is upsetting to see someone so eloquently spoken and intelligent be mocked by someone on here for not knowing the facts.
It’s not that I’m mocking her, it’s more the fact nationalisation is so very over-idealised by labour, and she doesn’t realise that she’s unconsciously complaining about how awful a nationalised service is. It’s ironic, that’s all, but I don’t want to derail the thread with politics.
There has been a lot of comment on some of the Infrastructure/Electrification threads over the years that the relatively recent change in Standards for bridge parapet height on electrified lines is 'un-necessary', 'gold plating' ''elf and safety gone mad', etc.
Doesn't this sort of incident suggest that making it harder or less tempting to hang or throw items over electrified lines might be a sound idea?
For once, I largely agree with you! The primary cause of this was somebody poking at the OLE, and if people are determined to ask silly questions, there's only so much deflection you can put in their way. Education is the reasonable response to this specific issue.Clearly not.
Ultimately someone got a nasty belt off of this, and I hope they recover, but making railway electrification unaffordable by gold plating standards that have been shown to be largely safe for seven decades, and thus potentially pushing people into less safe modes of transport in the longer term, isn't the answer.
Continuing to educate the population about railway risks, and looking at the big picture of transport safety is the answer.
Yeah, detection was indeed lost so trains had to be talked past a red aspect. I was on one of the affected trains and we gained around a 15 minute delay.In fairness, a set of barriers failing in the down position is pretty easily managed from a train running point of view, unless detection has been lost. This would mean signals being passed at danger, otherwise normal running of trains, but crossing closed to road traffic.
In regards the Stevenage incident, I got away from there before it happened. Phew!
For once, I largely agree with you! The primary cause of this was somebody poking at the OLE, and if people are determined to ask silly questions, there's only so much deflection you can put in their way. Education is the reasonable response to this specific issue.
I would say that adding Parapet extensions isn't a particularly costly or difficult thing though, and I think that areas of risk such as bridge should have a consistent level of protection at the structure itself (i.e. the parapet height should be consistent across all tracks). In this case, the presence of Parapet extensions over only 1 track may have indirectly led to an inference that the others were safe to approach, and it would not have been unreasonable additional cost to have fitted them across the whole length.
At this specific bridge (not sure if you missed the discussion) there is a parapet extension over the Down Hertford Loop but not over the 4 ECML tracks. https://www.google.com/maps/@51.889...4!1sD-EiLYeofg1M1aQ-7jT6mQ!2e0!7i16384!8i8192I'd agree. A parapet extension is something that isn't going to require massive extra costs (involved with bridge rebuilding) so could be seen as a reasonable response in some areas.
Criticising something without knowing the facts is something that should be criticised. No matter how eloquent or intelligent you may be, you should make sure that, at the very least, what you know is not incorrect.
I agree with you they shouldn't be mocked though.
In this case, the presence of Parapet extensions over only 1 track may have indirectly led to an inference that the others were safe to approach