Eric
Member
Perhaps not, but those there would be little value running to the stations north of York or Doncaster. However it does give a valuable link to London to the stations served on the rest of the route. The business case for GC will rest of the ORCATS revenue. No ORCATS no GC.
50 minutes Wakefield to Bradford is a joke. If that could be cut down by even half that time then I bet GC would have a lot more passengers. Far too easy to get the fast train from Forster Square and a short hop onto the KGX train.
I must add and even then the GC service puts you down at the abysmal and dilapidated Kirkgate station which isn't the nearest station to the town centre.
50+ minutes from Bradford to Wakefield really does need to be looked at asap, because the bus only takes 40 minutes (albeit the Sheffield limited stop).
Someone has mentioned the excessive dwell time at Brighouse and on the approach to Halifax which I believe is beyond GC's control as these are the allocated paths they have been granted.
Off memory the last time I did this journey, we spent seven minutes sat at Brighouse and then a further five minutes at the junction waiting to get onto the Halifax to Bradford line as the Blackpool to York service had priority over us (from what the member of staff I spoke to told me).
There is room for improvement that I think we all acknowledge.
If the journey times could just somehow be reduced then IMO the passenger numbers using the GC West Yorkshire extension would grow in tow.