Strathclyder
Established Member
(I didn't want to start a new thread on this as I didn't think it warranted it, but if needs be, the mods/admins are welcome to merge it with my Class 303/311 thread from 2020/21)
www.railforums.co.uk
The Class 311s are often cited, including by Wikipedia naturally, as being built by Cravens of Sheffield to a tweaked design of the Class 303s built by Pressed Steel in Linwood. By the time they were ordered (1965/66?) however, Cravens was beginning to prepare the railway rolling stock part of it's business for a merger with Metro-Cammell, a process which was more or less complete by the time they arrived in Glasgow and had entered service on what is now the Inverclyde Line in August/September 1967. Related to this, I've seen it postulated that the design drawings for the 303s provided by Pressed Steel for Cravens to use proved problematic to work with, but I don't know if there is any truth to that.
So my main query is this: is it known how much design/construction work Cravens undertook independently on the 311s before completely coming under the Met-Camm umbrella, if any at all?
Class 303s/311s - Memories, favourite liveries etc.
I know there's been a few threads on this subject over the years, but seeing as they're all locked, I thought I'd start this one. With the 18th anniversary of their last revenue-earning run fast approaching (30th December 2002), I thought it appropriate to start a thread on one of the...
The Class 311s are often cited, including by Wikipedia naturally, as being built by Cravens of Sheffield to a tweaked design of the Class 303s built by Pressed Steel in Linwood. By the time they were ordered (1965/66?) however, Cravens was beginning to prepare the railway rolling stock part of it's business for a merger with Metro-Cammell, a process which was more or less complete by the time they arrived in Glasgow and had entered service on what is now the Inverclyde Line in August/September 1967. Related to this, I've seen it postulated that the design drawings for the 303s provided by Pressed Steel for Cravens to use proved problematic to work with, but I don't know if there is any truth to that.
So my main query is this: is it known how much design/construction work Cravens undertook independently on the 311s before completely coming under the Met-Camm umbrella, if any at all?
