Yes, that is what got me wondering if there was more to it than a signal failure.As mentioned above. Lightning strike in Perth area. Not sure why is wasn't continued beyond Edinburgh, albeit late, other than that.
Why did it need to run as an additional, the original service was not excessively late at Edinburgh?Ran as an additional 1Z13 from Edinburgh.
Realtime Trains | 1Z13 1130 Edinburgh to London Kings Cross | 15/08/2022
Real-time train running information for 1Z13 1130 departure from Edinburgh to London Kings Cross on 15/08/2022. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
The set formed the restarted 1E15 (ex Aberdeen, which was running late), running as 1Z15 departing at 1330. 1E15 then terminated and formed 1E16.Not sure why is wasn't continued beyond Edinburgh, albeit late, other than that.
Just protecting performance on the ECML, and the service south of Edinburgh.Yes, that is what got me wondering if there was more to it than a signal failure.
That is a bit odd. When you bear in mind I've just dealt with an East Midlands Railway service running 74 minutes late, and kept to its full route. Whilst the following service is now also delayed behind it.Yes, that is what got me wondering if there was more to it than a signal failure.
== Doublepost prevention - post automatically merged: ==
Why did it need to run as an additional, the original service was not excessively late at Edinburgh?
Totally agree, well explained.The correct decision IMO. 1E13 was 65 late at Edinburgh, 1E15 (which 1E13 formed) was 23 late.
Doing it that way didn’t make anything any later, ensured almost right time running south of Edinburgh for all of the 1130, 1230 & 1300 departures, avoided extra pressure on the 1200 due to the lateness of the original 1130 set, and protected through journey opportunities as best as possible.
Root cause was a combination of a lightening strike affecting signalling, and speed restrictions imposed due to poor weather north of Edinburgh.
If you're on about the delays on the Skegness route, I don't think you can compare this with the operations of long distance services on the ECML. Certainly won't be any stock available or crew changes to do what LNER have done here.That is a bit odd. When you bear in mind I've just dealt with an East Midlands Railway service running 74 minutes late, and kept to its full route. Whilst the following service is now also delayed behind it.
More my point being the decisions that are made regarding train running. On other occasions a service may, as seen from this thread, may terminate early to aid service recovery. Equally, a service may omit some stations for service recovery purposes. However, it doesn't always happen. I recall travelling south from Edinburgh one evening and the train was delayed by another train failing between Edinburgh and Dunbar. The service continued through to London, but was over two hours late.If you're on about the delays on the Skegness route, I don't think you can compare this with the operations of long distance services on the ECML. Certainly won't be any stock available or crew changes to do what LNER have done here.
All down to circumstances, even things like varied train crew diagrams due to engineering works could cause variations in how service disruption is handled. Certainly earlier on in the day the options for handling disruption are slightly more flexible, but as you get towards the end of the day the options get more limited.More my point being the decisions that are made regarding train running. On other occasions a service may, as seen from this thread, may terminate early to aid service recovery. Equally, a service may omit some stations for service recovery purposes. However, it doesn't always happen. I recall travelling south from Edinburgh one evening and the train was delayed by another train failing between Edinburgh and Dunbar. The service continued through to London, but was over two hours late.
The services that terminated at Edinburgh to then restart as 1Z services had already failed ppm, so terminating them to restart as alternative services really was the right decisions.More my point being the decisions that are made regarding train running. On other occasions a service may, as seen from this thread, may terminate early to aid service recovery. Equally, a service may omit some stations for service recovery purposes. However, it doesn't always happen. I recall travelling south from Edinburgh one evening and the train was delayed by another train failing between Edinburgh and Dunbar. The service continued through to London, but was over two hours late.
Perhaps LNER, Avanti WC and TPE should be merged.LNER are quite good at doing this keeping the service from Scotland running broadly to time by utilising other sets for right time departures.
Then the worst practices, not the best ones, would be sharedPerhaps LNER, Avanti WC and TPE should be merged.
Perhaps LNER, Avanti WC and TPE should be merged.