It’s an out of station interchange which doesn’t get an interchange symbol on the station line diagrams (and the symbol isn’t even shown there anyway).Barking Riverside does have a river pier so maybe that is what the interchange blob is for?
Apparently the issues are caused by them getting rid of their dedicated signage team (I bet they thought they weren’t really needed because new lines hardly ever open).Is it my imagination or is TfL having a lot of quality control issues with their signage these days?
Thanks for that, I have just been looking for a really updated map like that.New tube map is up showing the extension open
There is no alterations at Barking, the extension just uses existing lines via the C2C line flyover to platforms 7 and 8 instead. There are new lines just past the junction however on the Dagenham/Rainham branch.Thanks for that, I have just been looking for a really updated map like that.
There are quite a few new UndergrounD and Main line lines that I should like to do, EG; Paddington to Abbey Wood, Northern Line Battersea Power Station and around the new Platforms Tunnels at Bank and now the Goblin Extention to Barking Riverside. I assume that they must have done alot of rebuilds at Barking Station as I presume the original Goblin services went into a bay or terminus platform there? I was surprised to hear that this has just open, I did not know that it was even under construction, although I knew it was proposed. The last time I did that line from Gospel Oak, they had new-ish, 2 carriage Diesel units.
Looks very strange seeing Wanstead Park now north of the Great Eastern main line. Perhaps it migrated because transferring passengers were walking east-west rather than north-south?New tube map is up showing the extension open
Indeed. The trains head a short way down the Grays branch with c2c trains before taking the new flyover to the new station. Effectively the bay platform is now unneeded, though I would imagine will be used in times of disruption, when the riverside extension is closed for unplanned/maintenance or for a few first or last train of the day scenarios.
Effectively the bay platform is now unneeded, though I would imagine will be used in times of disruption, when the riverside extension is closed for unplanned/maintenance or for a few first or last train of the day scenarios.
You were lucky! I caught a late running train to Barking Riverside, had a very leisurely stroll around the area in dry but intense heat and then made my way back to the station. There were numerous members of staff doing seemingly nothing and certainly none made any attempt to inform passengers that the service was now suspended.Unfortunately I didn't make the first train on Monday as I needed to wake up at 0215 for the night buses and only got up at 0240.
I'm starting to think Geoff Marshall and Jago Hazzard must have been stuck there in Barking Riverside for two days! No video from either of them yet!
Geoff Marshall definitely posted (maybe a tweet?) somewhere he wouldn’t do one while there was advice not to travel.I'm starting to think Geoff Marshall and Jago Hazzard must have been stuck there in Barking Riverside for two days! No video from either of them yet!
His video is still in editingGeoff Marshall definitely posted (maybe a tweet?) somewhere he wouldn’t do one while there was advice not to travel.
Many thanks pdeaves - I'd not been aware of this resource previously - really useful.Start here http://www.railwaycodes.org.uk/elrs/_mileages/b/bkr.shtm hope that helps
And many thanks swt-passenger for this. It looks as though I'm not eligible to register, but the pdfs are very informative.The up and down halves of the junction are quite well separated by distance, but the down junction is grade separated and conflict free, so does that perhaps mean trains don’t need to be timed there?
The route taken by up trains is more conflicting, as far as the sectional appendix shows it there seems to be a flat crossing of the eastbound entry route into the Ripple Lane sidings.
If you want the detailed layout and distances they’re in the Anglia online sectional appendix, you need to refer to routes EA1390 and EA1395. Links to sectional appendices are on the Network Rail page here:
National Electronic Sectional Appendix - Network Rail
The National Electronic Sectional Appendix contains detailed information useful to operators about network capability, as well as other data.www.networkrail.co.uk
I've been on three trains out of Barking Riverside and every single one has been held for a freight to pass, I'm typing this now as I also sit on a train 2J42 at ripple lane sidings...also awaiting a freight train to pass...
I'm starting to think Geoff Marshall and Jago Hazzard must have been stuck there in Barking Riverside for two days! No video from either of them yet!
Oh 100%. But you know what the railway is like for removing things like this!Terminating the GOBLIN at Barking may still be very necessary at times of c2c or freight disruption (it's a moderately busy area!). I guess it's always good to have a conflict free 'bail out' option when merging with other services where things can go wrong. Like tipping out an Overground train and running into the sidings from P1 at New Cross Gate.
Looks very strange seeing Wanstead Park now north of the Great Eastern main line. Perhaps it migrated because transferring passengers were walking east-west rather than north-south?
sorry, I meant south in the first place! Thanks for spotting.In fact, the new map shows Wanstead Park as being on the south side of the main line - which certainly is misleading ... since it's actually to the north.
Post #163 has the distances from the two junctions. Barking station is at 7m 42ch. I also found all the info you’d need has been included in the current public online sectional appendix, please see the link in post #166.Does anybody have the exact mileage/chains from Barking - Barking Riverside please? It won’t load up the distance on Railmiles. Thanks!
Post #163 has the distances from the two junctions. Barking station is at 7m 42ch. I also found all the info you’d need has been included in the current public online sectional appendix, please see the link in post #166.