I haven't read the whole of this thread. I have more to do with my life, just a quick dip in to view what was being said.
Are many of you actually supporting the railway and it's staff or just accepting what the "dear blonde leader" is spouting out?
There are no "agency" or "supply staff" in any operational safety related role on the railway. The only agency staff are engineering staff employed by specialist contractors and they undergo the same PTS, Rules and Regs and safety training as NR staff.
It takes 18 to 20 weeks to train someone to be a basic grade signaller, and many applicants don't complete the course successfully.
It takes maybe 20 to 30 weeks to train staff with railway experience to become a driver. Longer, much longer , for new entrants.
Then they need route training and ongoing assessment until they can drive by themselves.
The whole process can take over a year for a depot with one or two traction types and limited route knowledge. They are then mentored for the first year of driving solo.
There is also an considerable failure rate before appointments and reaching the reality of late night suburban services or 0230 starts
Most training of drivers and signalmen is for the fraction of 1 percent of the time w
hen things goes wrong.
Doing the basic driving or signalling is only maybe 20% of the training.
The UK and the rest of Europe run railways are the product of nearly 200 years of safety developments. That's why a railway accident is headline news.
On the roads a fatality may make the local paper or news broadcast.
As a railway enthusiast forum, I would have hoped for better understanding. The extensive training is for yours and every-ones safety.
The other thing which caught my eye, pay.
An average of £40k may be a reasonable estimate. As a Band 4C ( Technical specialist / management ) when I retired a few years ago my salary with London weighting was well short of that. I had an input to possession and worksite safety mentoring contractors and to engineering trains. I had to adhere to Rules and Regs as well as Train Planning Rules, Engineering Access plans and bear in mind the financial implication of possession over-runs or incidents and delay attribution.
After this I fully expect to be suspended by the moderation team for a while!