FGWHST43009
Member
- Joined
- 3 Nov 2020
- Messages
- 255
That is true at the moment, you could do 4 tracking in some places to enable a frequent all-stations service as well as allow IC services to overtake. A new alignment would be useful east of Cardiff, especially if it connects to HS2 as well as the GWML at Bristol Parkway. High speed trains from Cardiff/Swansea to Manchester etc would use the line as well as GWR's expresses to London Paddington. I would at least electrify Cardiff - Swansea and try to bypass Neath for the fastest trains.I'd argue the model we should be going for is not the TGV one though.
There isn't much traffic to Swansea compared to traffic to Cardiff, so if we built a bypass very few people would actually use it.
I'd argue a better model is the Shinkansen style segregated station model.
Last edited: