• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Merseyrail Class 777 introduction updates

Status
Not open for further replies.

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
It may be slower but i believe that safety should always takes priority over speed. Incidents such as wrong side door release and off platform door release are much rarer on trains with Guard release and more common on trains with Driver release. I have seen data to show that. On trains with Guard release the Guard will first open their local door and step on to the platform to check it is safe first before then releasing all of the other doors. So that makes the above incidents much harder to occur. So i think that Guard release is a lot safer than Driver release even if it is slower.
Platform detection sensors wouldn't be too difficult, have a distance sensor a bit bellow platform height, if its very close its at a platform, if its far away then its the wrong side.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
Wheres the evidence of that not seen it on 30 years of DOO travel on Thameslink
It’s simply more likely when a driver has a pair of “Door open left” and “door open right” buttons right next to each other for them to press the wrong one than it is for a guard who has to step onto the platform at the local door on the correct side before releasing the other doors on that side, because the guard does not want to fall onto the third rail.

I also don’t buy into the claim that DOO is faster. Dwell times on Merseyrail services are very short.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,817
It’s simply more likely when a driver has a pair of “Door open left” and “door open right” buttons right next to each other for them to press the wrong one than it is for a guard who has to step onto the platform at the local door on the correct side before releasing the other doors on that side, because the guard does not want to fall onto the third rail.
Fit Correct Side Door Enable kit then. It’s really not difficult.
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,238
Fit Correct Side Door Enable kit then. It’s really not difficult.
They sort of already do it with the existing sensors that are used by the sliding steps. Individual doors won’t release if their step can’t measure a distance to the platform.

They do have ADSO kit fitted. It would just be a case of putting beacons at every platform to enable “real” CSDE.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,391
Location
"Marston Vale mafia"
I also don’t buy into the claim that DOO is faster. Dwell times on Merseyrail services are very short.

It objectively takes longer (about 5 seconds*) to do this:

1. Open local door
2. Get out and look if platformed
3. Get back in and press release

than this:

1. Look in DOO cameras to see if platformed
2. Press release

It also takes longer on dispatch, because closing the local door and "ding ding, ding ding" takes somewhere between 5 and 10 seconds.

On a Southport that's a minimum of 220 seconds or about 3 and a half minutes. It makes a difference.

Remember that they had to add two minutes to the Ormskirk-Liverpool running time simply because of the fitment of hustle alarms which make closing up take an extra few seconds over before they were fitted.
 

urbophile

Established Member
Joined
26 Nov 2015
Messages
2,481
Location
Liverpool
I also don’t buy into the claim that DOO is faster. Dwell times on Merseyrail services are very short.
I'm not well up on the technology, but as a frequent Merseyrail passenger there often seems to be a long wait for the guard to (reach and) open the doors. Surely there can be a simple fix to enable the driver to do that without risk: that should save a lot of time. I agree that the guard should be the one to check and close the doors though.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
At this rate the Tyne & Wear Metro Stadler units, which were ordered several years after and are based on the Merseyrail units to a large extent, could enter service first.
 

DJH1971

Established Member
Joined
10 Jun 2012
Messages
1,751
Location
St Helens, Merseyside
At the rate they are going the 777's will end up needing to be refurbished before they even enter service. The 507/508's cannot go on forever.
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,238
At this rate the Tyne & Wear Metro Stadler units, which were ordered several years after and are based on the Merseyrail units to a large extent, could enter service first.
They aren’t based on them at all. They look similar in the renders due to a similar colour scheme and light pattern, but it’s an entirely different package, bodyshell and spec.

I also doubt they’ll have one in service before the first 777 is, but they’ll also not have had the full brunt of a pandemic to deal with so should be in service relatively quickly once delivery starts at pace.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,391
Location
"Marston Vale mafia"
They are both Stadler METRO units, but the Merseyrail units have a body which has much more in common with the regular FLIRT, hence many people (including me) calling them that at times.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
They aren’t based on them at all. They look similar in the renders due to a similar colour scheme and light pattern, but it’s an entirely different package, bodyshell and spec.

I also doubt they’ll have one in service before the first 777 is, but they’ll also not have had the full brunt of a pandemic to deal with so should be in service relatively quickly once delivery starts at pace.
The Tyne & Wear units are a modified version of the basic Stadler Metro product. The basic Stadler Metro product is quite literally the 777 for Merseyrail.
 

D821

Member
Joined
1 Sep 2021
Messages
628
Location
The Wirral
Sorry if this sounds like a stupid question, but what exactly are the guards checking for before they open the doors? They haven't always worked on that manner, have they?
 

L401CJF

Established Member
Joined
16 Oct 2019
Messages
1,486
Location
Wirral
Sorry if this sounds like a stupid question, but what exactly are the guards checking for before they open the doors? They haven't always worked on that manner, have they?
Ensure the whole train is on the platform/stopped in the correct position.
 

wobman

Established Member
Joined
2 Jan 2011
Messages
1,233
Sorry if this sounds like a stupid question, but what exactly are the guards checking for before they open the doors? They haven't always worked on that manner, have they?
To see if the train is fully on the platform, merseyrail trains run in various formations so this is a vital element of the safe running of the services.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
To see if the train is fully on the platform, merseyrail trains run in various formations so this is a vital element of the safe running of the services.
And of course the 777s will run in new formations, some of which have even greater difficulty fitting into platforms, which will only make this even more vital.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,008
Location
Surrey
I also don’t buy into the claim that DOO is faster. Dwell times on Merseyrail services are very short.
If the guard doesn't have to get out and do a check before releasing doors then its entirely possible to get comparable dwell times to DOO.
 

Fokx

Established Member
Joined
19 Jul 2019
Messages
1,613
Location
Liverpool
Ensure the whole train is on the platform/stopped in the correct position.
Add to that hazard perception, and any issues with the PTI that may cause problems for alighting passengers on the train and those already on the platform
 

L401CJF

Established Member
Joined
16 Oct 2019
Messages
1,486
Location
Wirral
Add to that hazard perception, and any issues with the PTI that may cause problems for alighting passengers on the train and those already on the platform
Of course. Ensure the train is fully accommodated in the platform in the correct position. Ensure it is safe to release the doors. We were told for example if there is a fight on the platform or something, not to release the doors. In theory the driver would see the fight while pulling in and signal 2-2 (do not release doors). In theory they should signal the same if they have overran the platform - but again the guard should check before releasing the doors.

A few weeks ago we were held outside a station and the driver called saying the signaller had held us due to an intoxicated passenger trying to board a previous train at the next station, so not to release the doors until I am certain he isn't trying to board. Police had him detained when I checked so I then released the doors.

The guard should also know who requires assistance - for example if you see somebody struggling with a pram, case or somebody with poor mobility struggling with the gap, it is best to assist them to avoid a slip, trip, fall down the gap etc. If the guard is keeping an eye on the train internally throughout the journey its easy enough to identify those who might need extra help alighting through ticket checks etc and to position yourself in a suitable position for their station to assist them.

Where I work we don't have dwell time targets as such, we are told to take as much time as we need to ensure the safety of PTI and not to rush. It takes as long as it takes to perform the PTI safety checks, let everybody board and alight, and to assist those who need assistance.

Obviously its quite difficult to judge how long is long enough, but rushing through the process to meet a target surely increases the chances of an incident such as overcarrying a passenger, or trapping somebody in the doors.
 

urbophile

Established Member
Joined
26 Nov 2015
Messages
2,481
Location
Liverpool
But as I said, this will double immediately upon the 777s entering service.
do they plan to run 777s along with the old trains on the same lines? I thought the idea was to run all services on one branch with the new trains from the outset. Admittedly that will mean a few stations (eg Kirkdale to Central) having to cope with both types.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
do they plan to run 777s along with the old trains on the same lines? I thought the idea was to run all services on one branch with the new trains from the outset. Admittedly that will mean a few stations (eg Kirkdale to Central) having to cope with both types.
I believe the plan is to convert whole lines at once, starting with Ormskirk and Kirkby, then the Wirral lines and finally Southport, so anywhere more than line shares tracks will have to deal with both types in service. Southport may see 4 car 777s run in between 6 car 507s at one point.
 

karlbbb

Member
Joined
26 Jul 2009
Messages
460
But as I said, this will double immediately upon the 777s entering service.
The 4-car 777 sets are almost identical in length (within 1 metre?) to the 3-car 507/508s, aren't they? Aside from accounting for different door placements, there aren't any wild differences I could see.
 

Vespa

Established Member
Joined
20 Dec 2019
Messages
1,733
Location
Merseyside
The 4-car 777 sets are almost identical in length (within 1 metre?) to the 3-car 507/508s, aren't they? Aside from accounting for different door placements, there aren't any wild differences I could see.

It was enough of a difference to require platform lengthening by digging out toward the concourse in Southport.
 

D821

Member
Joined
1 Sep 2021
Messages
628
Location
The Wirral
The Liverpool Echo has an article this morning where they have asked when the trains will be in service. The LCRA are saying "phased in from autumn this year."
 

karlbbb

Member
Joined
26 Jul 2009
Messages
460
The Liverpool Echo has an article this morning where they have asked when the trains will be in service. The LCRA are saying "phased in from autumn this year."
And as pointed out in the comments, this is likely to be cow excrement as the unions/guards/drivers/everyone is yet to agree exactly how the trains will be operated.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
The 4-car 777 sets are almost identical in length (within 1 metre?) to the 3-car 507/508s, aren't they? Aside from accounting for different door placements, there aren't any wild differences I could see.
A 3 car 507/508 is 60m but a 4 car 777 is (as it says at the cab end) 65m. Therefore an 8 car 777 is 10m longer than a 6 car 507/508 which is a significant enough difference to require some variation of platform lengthening at most stations.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,391
Location
"Marston Vale mafia"
A 3 car 507/508 is 60m but a 4 car 777 is (as it says at the cab end) 65m. Therefore an 8 car 777 is 10m longer than a 6 car 507/508 which is a significant enough difference to require some variation of platform lengthening at most stations.

No, it's not. It's only an issue at terminal platforms due to not being able to hang off past the signal. At through stations, the door positioning handles it.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
No, it's not. It's only an issue at terminal platforms due to not being able to hang off past the signal. At through stations, the door positioning handles it.
So why have platforms at stations including Freshfield and Birkenhead Park been lengthened slightly? The extensions aren’t vast but they are needed.
 
Status
Not open for further replies.

Top