Does it mean that if electric mode becomes unavailable at some point early in the day, it won't have enough fuel to finish its diagram on diesel?
There should be a 769 on Newton Heath every night, comes in empty from. Stockport via Denton and goes the reverse in the morning. This is the case until the May timetable change.That said, being electric depots, how much refuelling infrastructure exists at Allerton and Springs Branch and how often do 769s reach Newton Heath, where there of course is.
The Alderley Edge diagrams are more than half under the wires. Also see this example upthread of a low fuel cancellation:Does it mean that if electric mode becomes unavailable at some point early in the day, it won't have enough fuel to finish its diagram on diesel?
...hoped to ride 448. I was waiting for it at Parbold but it got cancelled.
It's back out today, it was just low on fuel yesterday.
Or to put this another way, an operator cannot just drop 769s into existing DMU diagrams that are partly under the wires. It may be necessary to plan in additional ECS workings to/from a fuelling point. These incur additional mileage and driver hours and so increase operating costs.Well the simple answer is that operators must 'cut their coat according to their cloth'. Diagrams must recognise the reality of the situation.
The actual increase will depend on how well it is planned so yes at least try it.Or to put this another way, an operator cannot just drop 769s into existing DMU diagrams that are partly under the wires. It may be necessary to plan in additional ECS workings to/from a fuelling point. These incur additional mileage and driver hours and so increase operating costs.
This is how they’ve run out before but it doesn’t mean it will happen every time.Does it mean that if electric mode becomes unavailable at some point early in the day, it won't have enough fuel to finish its diagram on diesel?
So they have to switch power at Stockport and run that way. What will be the case after the timetable change?There should be a 769 on Newton Heath every night, comes in empty from. Stockport via Denton and goes the reverse in the morning. This is the case until the May timetable change.
Southport - Alderley Edge diagrams are 53.6% under the wires, but 769s only run 47.75% of the distance in electric mode, running the 3 miles from Lostock Junction to Bolton on Diesel. They really should stop and do the changeover there.The Alderley Edge diagrams are more than half under the wires. Also see this example upthread of a low fuel cancellation:
They are of course not DMUs and there are additional requirements specific to bi-mode operation. This increase in operating costs needs to be offset by savings in Diesel for them to be viable.Or to put this another way, an operator cannot just drop 769s into existing DMU diagrams that are partly under the wires. It may be necessary to plan in additional ECS workings to/from a fuelling point. These incur additional mileage and driver hours and so increase operating costs.
2W00 which currently starts at Alderley, will revert back to starting from Victoria from May. This was the case last year. It should be a 769... Should....So they have to switch power at Stockport and run that way. What will be the case after the timetable change?
...but has actually been a 2-car DMU every day this week....2W00 which currently starts at Alderley, will revert back to starting from Victoria from May. This was the case last year. It should be a 769... Should....
In the up direction the wires don't start until the junction itself, and stopping to do power changeover would incur a time penalty, when it's only 3 miles to Bolton.running the 3 miles from Lostock Junction to Bolton on Diesel. They really should stop and do the changeover there.
Eventually there were 4 units out on Friday 29th. 458 appeared mid morning, joining 442, 450 and 456. RTT attributed the preceding cancellations to traincrew issues.Am surprised the 3 that started off this morning are still going strong, the warm weather not affecting them today, was thinking as day got warm there would be issues with the cooling system e
156496 also appeared at Southport, an unusual ex-ScotRail example with the new ironing boards instead of the usual Chapman seats, not usually found on the west side. It then went ECS to Allerton depot, which presumably means it was on a booked 769 diagram.Eventually there were 4 units out on Friday 29th. 458 appeared mid morning, joining 442, 450 and 456. RTT attributed the preceding cancellations to traincrew issues.
On Saturday 30th 434, 442, 450 and 456 were out first thing. 442 was later replaced by 156460, but from RTT it is unclear why. It was caught up in the chaos caused by a signalling failure at Oxford Road.
It must be a long time since 769s worked all six of their booked diagrams on the same day.
The chaos was a mess, complete lack of announcements at Oxford Road, 6-car ECS in platform 4 "not for public use" which blocked platform 3, another train in platform 2, in the end I walked over to P3 so that I could see the Alderley Edge train in Deansgate (769434 on the 12:16 from Southport) which started moving in our direction so I worked out it was going to use platform 1, still no announcements, but I had time to walk over the bridge (again) and get on it there. I think the ECS eventually went to Stockport but at least the train I wanted managed to circumvent the signalling problem by using platform 1, it actually lost almost no time having been 21 minutes late at Bolton and was 23 minutes late into Wilmslow.On Saturday 30th 434, 442, 450 and 456 were out first thing. 442 was later replaced by 156460, but from RTT it is unclear why. It was caught up in the chaos caused by a signalling failure at Oxford Road.
So, that wasn't anything to do with a 769 failing?The chaos was a mess, complete lack of announcements at Oxford Road, 6-car ECS in platform 4 "not for public use" which blocked platform 3, another train in platform 2, in the end I walked over to P3 so that I could see the Alderley Edge train in Deansgate (769434 on the 12:16 from Southport) which started moving in our direction so I worked out it was going to use platform 1, still no announcements, but I had time to walk over the bridge (again) and get on it there. I think the ECS eventually went to Stockport but at least the train I wanted managed to circumvent the signalling problem by using platform 1, it actually lost almost no time having been 21 minutes late at Bolton and was 23 minutes late into Wilmslow.
No, indeed, nothing at all to do with a 769.So, that wasn't anything to do with a 769 failing?
No, track circuit fault on the corridorSo, that wasn't anything to do with a 769 failing?
So, that wasn't anything to do with a 769 failing?
To try to clarify the chaos a little:No, track circuit fault on the corridor
Ah, thanks - I had assumed you had eyeballed the number.Thanks, a word of warning, I was on 2K87 12:16 Southport-Alderley Edge from Oxford Road but I didn't correlate the unit number with RTT (IE I didn't look at the actual number on the train I was on), the latter had 769434 yesterday (see attached PDF) but it now shows on RTT as 769442, so it's been changed for some reason. So my statement that I was on 769434 yesterday only came from RTT at the time ..... so the more recent update could well be correct and it was in fact 769442.
Yes, thank you, that makes sense.Ah, thanks - I had assumed you had eyeballed the number.
In which case a less convoluted explanation of events is that the 1053 Oxford Road to Southport was worked by 769442 solo, which had remained in P1 since 0952. It then took over the remainder of 434's diagram as now shown in RTT.
Last time I went it was a 156, though most times I've had a 7692W00 which currently starts at Alderley, will revert back to starting from Victoria from May. This was the case last year. It should be a 769... Should....
And in the event a 769 has issues in electric mode, they actually have the advantage over 319s and other EMUs of being able to use the Diesel as a backup, but that appears not to have happened in this case.Edit: This being so, it seems possible that the track circuit fault only affected Oxford Road P3 and so did not become critical until 769434 sat down in P4.
Even if the 769 did fail, it occurred under the wires and so likely involved the original 319 equipment rather than the new systems.
Source?769 movements are now to run in diesel mode throughout and must not be used in AC mode until further notice apparently.
A massive notice on the booking on desk at our signing on point.Source?