Yes. When I lived in Oxfordshire and regularly travelled on Chiltern's Class 165s it was normal to use the middle seats. Of course there are some people who are wider than most who may find that difficult, but the majority will sit in a centre seat in preference to standing unless their journey is very short. The trains that preceded the 165s mostly had 2 + 3 seating and nobody made a fuss about it; similarly with 4 SUBs, 4EPBs and 4VEPs.
In any case I see no way the Treasury would authorise a replacement order of new stock. SWR would simply have to life extend its 455s and potentially source other suitable stock coming off lease, eg the Southern 455s.
There was a recent inspection/visit from SWR.and union people. Horrendous was the opinion of the "finished" train. Still riddled with faults, mostly software but many physical issues too.
In any case I see no way the Treasury would authorise a replacement order of new stock. SWR would simply have to life extend its 455s and potentially source other suitable stock coming off lease, eg the Southern 455s.
"If" SWR took on the Southern 455's, wouldn't this cause issues with yet another micro-fleet in terms of diagramming/maintenance etc? I know it's only a few but surely it would make sense to get their own stored 455's back into use
"If" SWR took on the Southern 455's, wouldn't this cause issues with yet another micro-fleet in terms of diagramming/maintenance etc? I know it's only a few but surely it would make sense to get their own stored 455's back into use
It would - it has to be remembered that, not only are the Southern 455s still traditional DC tractioned units (and more expensive to maintain and operate) but also incompatible with the SWR 455s due to different PA and Passcom systems. Any units transferring over from Selhurst to Wimbledon would need the same modifications that the 456s had when they transferred across in 2014.
Can someone explain in simple terms why at this very late stage new build 707s would be preferable over 701s which are for the most part already built? Granted there are still fixes needed in h/w and s/w but...still.
"If" SWR took on the Southern 455's, wouldn't this cause issues with yet another micro-fleet in terms of diagramming/maintenance etc? I know it's only a few but surely it would make sense to get their own stored 455's back into use
Yes, it would, but will SWR have enough rolling stock to cope with future demand? Having lost 30 707s and 24 456s surely not, even if the Class 458 programme is cancelled.
== Doublepost prevention - post automatically merged: ==
Can someone explain in simple terms why at this very late stage new build 707s would be preferable over 701s which are for the most part already built? Granted there are still fixes needed in h/w and s/w but...still.
One thing I would say about the claims that 707s are being ordered, I haven't seen the PIN (Prior Information Notice), ITT (Invitation to Tender) or the tender award announcement for this very large rolling stock order.
The whole story has to be complete nonsense. Companies and government organisations can't just go to a supplier and place an order without a competitive tendering exercise.
Yes, it would, but will SWR have enough rolling stock to cope with future demand? Having lost 30 707s and 24 456s surely not, even if the Class 458 programme is cancelled.
== Doublepost prevention - post automatically merged: ==
One thing I would say about the claims that 707s are being ordered, I haven't seen the PIN (Prior Information Notice), ITT (Invitation to Tender) or the tender award announcement for this very large rolling stock order.
The whole story has to be complete nonsense. Companies and government organisations can't just go to a supplier and place an order without a competitive tendering exercise.
Is there a way to go to the second place runner up without going through another tender?
Surely it makes sense to have that clause. Especially if something happens meaning the winner pulls out.
The whole story has to be complete nonsense. Companies and government organisations can't just go to a supplier and place an order without a competitive tendering exercise.
SWR as a private company can directly award an order without any tendering exercise - indeed I seem to recall that South West Trains did exactly that when it came to getting the 707s. The only TOCs subject to competitive tendering rules are LNER, Northern, Southeastern, TFW and ScotRail.
SWR as a private company can directly award an order without any tendering exercise - indeed I seem to recall that South West Trains did exactly that when it came to getting the 707s. The only TOCs subject to competitive tendering rules are LNER, Northern, Southeastern, TFW and ScotRail.
It's the Treasury's money. SWR is barely a private company (and is actually classified as public sector by the ONS). It merely get a management fee for doing what it's told. There is absolutely no way it can just go and buy what it wants without tendering.
The whole story has to be complete nonsense. Companies and government organisations can't just go to a supplier and place an order without a competitive tendering exercise.
Yes they can if there are extenuating circumstances. During the pandemic there were plenty of contracts placed without going through the tendering process. Likewise, what is a direct award contract to a TOC?
In rolling stock, the Dutch placed a contract with Bombardier for TRAXX locos after the Fyra fiasco and I think ÖBB have ordered without tender from Siemens after they cancelled the Talent3 order with Alstom. That’s not dissimilar to the situation SWR are in.
Can someone explain in simple terms why at this very late stage new build 707s would be preferable over 701s which are for the most part already built? Granted there are still fixes needed in h/w and s/w but...still.
Yes they can if there are extenuating circumstances. During the pandemic there were plenty of contracts placed without going through the tendering process. Likewise, what is a direct award contract to a TOC?
In rolling stock, the Dutch placed a contract with Bombardier for TRAXX locos after the Fyra fiasco and I think ÖBB have ordered without tender from Siemens after they cancelled the Talent3 order with Alstom. That’s not dissimilar to the situation SWR are in.
Right, so the Treasury will let SWR spend public money on new rolling stock because the rolling stock still currently in build can't be introduced due to industrial relations problems specific to SWR.
Of course they won't. And who's going to pay the bill to Alstom for the 701s?
Right, so the Treasury will let SWR spend public money on new rolling stock because the rolling stock still currently in build can't be introduced due to industrial relations problems specific to SWR.
Of course they won't. And who's going to pay the bill to Alstom for the 701s?
You are assuming that the 701s are fit for service other than just the industrial relation issues. We don’t know what the contract terms are - there may be a termination clause for non-delivery. In which case no one is paying Alstom.
In any case, nowhere did I say it would happen; I pointed out that your statement about competitive tendering was incorrect. Perhaps read what was written and get off your high horse?
Yes they can if there are extenuating circumstances. During the pandemic there were plenty of contracts placed without going through the tendering process. Likewise, what is a direct award contract to a TOC?
In rolling stock, the Dutch placed a contract with Bombardier for TRAXX locos after the Fyra fiasco and I think ÖBB have ordered without tender from Siemens after they cancelled the Talent3 order with Alstom. That’s not dissimilar to the situation SWR are in.
Is there a way to go to the second place runner up without going through another tender?
Surely it makes sense to have that clause. Especially if something happens meaning the winner pulls out.
Personally myself yes I can see the 458 programme being cancelled and 458530 to 458536 being kept rather than scrapped to keep more units, However the 701s, most likely will come into service but very very extremely slow process with the 455 staying on a lot longer most likely at least until December 2023 timetable change.
However makes you wonder at times if swr cannot admit to a error in getting rid of the 456s earlier than expected ?
Like other tocs swr has been caught out passengers are returning quicker than expected, especially the leisure and off peak commuters.
The thing is, of all the South East commuter networks, it is probably the SW where commuters are most likely to be able to work from home (hence the huge collapse in passenger numbers into Waterloo) and therefore least likely to have any significant bounce back of commuting. It may be that DfT/Treasury have already written off any attempt to woo commuters into Waterloo back into the office and focus on cuts instead. If the claims are true that it is industrial relations that are preventing the 701s entering service I simply cannot see the DfT/Treasury being in any way sympathetic to further investment in SWR, preferring to let the network rot instead and blaming incompetent management and intransigent unions for it all.
Has any train ever entered service completely fault-free? There surely comes a point where you just have to bite the bullet. Think of the 458s for example.
Has any train ever entered service completely fault-free? There surely comes a point where you just have to bite the bullet. Think of the 458s for example.
And hastily brought back when SWT decided they were brilliant trains after all (nothing to do with the ultra-cheap lease offered to take them back of course...).
And hastily brought back when SWT decided they were brilliant trains after all (nothing to do with the ultra-cheap lease offered to take them back of course...).
I think a lot of work had been done to them to improve the reliability, a cheap lease is probably what incentivised SWT over just ordering more 450s (not difficult or too expensive, the 350/2s were ordered at a similar time).
I think a lot of work had been done to them to improve the reliability, a cheap lease is probably what incentivised SWT over just ordering more 450s (not difficult or too expensive, the 350/2s were ordered at a similar time).
It was because Porterbrook made it worth SWT's while in its franchise bid to dump the 442s and bring the 458s back on an ultra-cheap lease because the units had nowhere else to go. I can assure you that were initially very poor when they returned - we had over six months of hellish service on the Reading line with failed trains, cancellations and short formations. It was only subsequently that the very successful efforts were made to get the the units up to scratch - because something had to be done.
I suppose they can, but if SWR formally accept the trains they will have to start paying for them.
Of course Alstom and Rock Rail will want just that, but that's not in SWRs interest. A train which can't be used to carry bums on seats is a useless train.
It all seems a far cry from the upbeat articles in Modern Railways and Today's Railways a couple of months ago. Taking those articles at face value the first batch of units would have been accepted by SWR by now and training in would be in full progress. These were to be a mix of units built from new with SWR-spec cab layouts and earlier units built with Aventra standard cab layouts, subsequently rebuilt to SWR specification.