I agree with you that longer notice would be highly desirable. Unfortunately most operators cannot even get planning organised for twelve weeks ahead, or in some cases even a couple of weeks ahead, let alone a whole year.
Network Rail could publish what access they've asked for much further in advance, but would that help the general public? In particular, it might change significantly, and there is very little useful information there for the general public, because nobody will be able to answer the first question about what the overall effect on the train service will be.
Interestingly NR would like to reduce the 12 week window to eight. Where as I'd agree with you why not give guidance further out, Above it was mentioned that some people will finish this Easter and plan Easter 2023. I am aware of friends who were looking at the concert scene for Summer 2022 in September last year but would have had little idea of how to get there or home in terms of timetables etc for most rail operators. That said I believe East Coast have been pushing the booking horizons out to 12 months
Its a bit more nuanced than that. Version 3 of the 2023 Engineering Access Statement has gone out which is the proposal document for the May 23 timetable period. Much of the disruption is agreed but until V4 comes out you don't actually have a documented decision. There is a lot of 2024 agreed as well, but that is still subject to a lot of change. 2023 will alter to an extent as well. As a TOC you might not want to cry wolf too far away and its recognised that the further out you tell people the less they take notice of it. Look at this Easter and the FA, they ignored the advice NR gave over two years ago!
Perhaps engineering work should be publically advised once a quarter in line with Versions 1 to 4. It is a risk that people ignore it and also that it changes but at least if its advertised then people cannot claim that it wasn't known about, the fact they chose to ignore it is their own responsibility.
Tell that to the rail freight operators! Remember that the WCML is the world's busiest long-distance mixed traffic railway with regular freight flows using parts of just about the entire route. Little wonder then that major works/blockades on that route have to be done over bank holiday weekends especially Christmas and Easter. Reality is that, unlike the road network, there are few viable diversionary rail routes able to accommodate the full level of traffic from other lines. This is why so much work is in fact performed overnight but also why bigger jobs inevitably cause disruption.
Note that another thread is discussing whether weekend rail fares should be increased given the strain the current boom in leisure traffic is placing on the network as a whole. But on the other hand peak weekday fares are unlikely to be going down any time soon. So which set of passengers would you rather inconvenience, those paying discounted fares or those paying premium rates? In short there are no easy answers but with Network Rail planning works up to 2 years ahead of time any change that might be agreed is not going to happen quickly. There is also the possibility that the current level of leisure travel demand may not last given the general cost of living squeeze.
Whilst the railway is still generally busier in the week compared to weekends the gap has narrowed post covid. I don't think the 'missing' workers will return full time if ever so pursuit of the leisure user is even more essential.
That is a really valid point and something that the industry needs to get a grip of. Strategically, W10 gauge cleared routes are at a premium and you still have to consider the implications of the diversions to the FOCs themselves.
And I agree with this as well though I feel it should be noted that the FOCs tend to have more flexibility on their traction / route cards than sadly TOCs do and said TOCs could learn from this.
Incorrect, all line block at Watford, all line block at Kings Langley for M25 viaduct works as well as other bits for East West and junction tamps. Its the first time in decades or longer that the FA decided to put them at Easter.
I agree with you that the FA are a pain, however I do wonder how much much slack the FA have got in the football caledendar to accommodate matches. Season 2021/22 seems almost certainly to have been affected by the late finish of 2019/20 season and consequential late start of 2020/21 season (September 2020) and a need to fit in the Euros, delayed from Summer 2020 to Summer 2021 and the need to finish this season (2021/22) such that the players get a break this summer and that next season 2022/23 starts on time in late July / early August due to the World Cup being in December 2022 rather than Summer 2022. It should be noted there were no replays for FA Cup nor the League Cup this season - all matches decided on the night but also the FA Cup 5th Round was held midweek rather than at the weekend, which in my view is not great for the going to the match type fans.
In terms of the railway one could argue its not been flexible enough using the rails left at its disposal to run services to get passengers to the game in question despite the actions of the FA. There are no 'Blockade busters' from Marylebone or Paddington via the Chilterns to Birmingham New Street on Voyagers with Pendolinos from New Street to Liverpool / Manchester. Secondly how about EMR perhaps running some trains from Liverpool / Manchester via the Hope Valley to St Pancras, they managed a train last week in connection with the Grand National.