East Kilbride/Barrhead electrification updates

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GLC

Member
Joined
21 Nov 2018
Messages
397
What traffic(if any) uses the Larkfield curve? I’m assuming not even any passenger ECS workings go that way?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
It’s a pretty stiff, continuous climb (six miles or so?) from Thornliebank to Hairmyres. Note that the trial a few months ago went to Barrhead rather than EK. Could a battery unit handle it?

easily.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
Info I had was "Barrhead only": EK and Larkfield were no longer planned for electrification at this time based on the document I saw.
In which case operating BEMUs to EK would be the only realistic alternative.
 

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,497
Location
Moorpark, CA
What traffic(if any) uses the Larkfield curve? I’m assuming not even any passenger ECS workings go that way?
I've been diverted that way many years ago coming from EK - Central. I think it was originally included on the basis of "useful diversion and easy infill". I can't think of any "regular" traffic offhand.
 
Joined
14 Mar 2021
Messages
211
Location
Glasgow
I've been diverted that way many years ago coming from EK - Central. I think it was originally included on the basis of "useful diversion and easy infill". I can't think of any "regular" traffic offhand.
Occasionally petroleum trains to/from Grangemouth use the Larkfield curve. The next one is booked for 23 April.
 
Joined
14 Mar 2021
Messages
211
Location
Glasgow
7 months of closure seems a long time
This bridge GBK/013 Nithsdale Road is adjacent to another bridge, CTC/035 Nithsdale Road which is over the Cathcart Circle line between Muirhead Central Junction and Pollokshields West station. The latter bridge was rebuilt in 1959-60 when the Cathcart Circle was electrified. Perhaps this makes it more difficult to replace GBK/013.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,100
This reference to the East Kilbride scheme would suggest that whilst electrification to Barrhead is going ahead, the wording "preferred option to be progressed to final business case stage" means that as yet there is no firm commitment to wire to East Kilbride.

Further down, it says: "It is important to note that the East Kilbride Final Business Case is anticipated to be published this year and will contain detailed information on the works proposed to progress to construction."
 

Attachments

  • Screenshot 2022-04-05 111704.png
    Screenshot 2022-04-05 111704.png
    170 KB · Views: 40

sannox

Member
Joined
1 Mar 2016
Messages
649
This reference to the East Kilbride scheme would suggest that whilst electrification to Barrhead is going ahead, the wording "preferred option to be progressed to final business case stage" means that as yet there is no firm commitment to wire to East Kilbride.

Further down, it says: "It is important to note that the East Kilbride Final Business Case is anticipated to be published this year and will contain detailed information on the works proposed to progress to construction."

I think the comments about BEMUs for Kilmarnock maybe makes them think they can do the same for EK.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I haven't read it all yet but according to page 12 the (then-?) preferred option includes double tracking EK station. Presumably this would extend as far west as the existing loop near Hairmyres.
 

Yindee8191

Member
Joined
16 Mar 2019
Messages
181
You’d think the greater integration between infrastructure and operator in Scotland would stop these kinds of pointless descopings. Pushing the costs onto the rolling stock so you can cheap out on the infrastructure shouldn’t seem like a good option when the government owns the TOC as well as the infrastructure.
 

mcmad

Member
Joined
11 Mar 2015
Messages
1,074
I haven't read it all yet but according to page 12 the (then-?) preferred option includes double tracking EK station. Presumably this would extend as far west as the existing loop near Hairmyres.
Nope, literally just adding a second platform albeit in a way that wouldn't preclude future doubling.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
The announcement that it's going to be electrified. Lots of hot air over the last few posts...
It’s been 6 months since it was announced. After the u-turn on double tracking I wouldn’t rule out another change of plan, especially when there’s great pressure to cut costs.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Are the appendices to the business case likely to be online?

Maybe in the same directory if their filenames could be guessed????
 
Last edited:

Christmas

Member
Joined
10 Mar 2018
Messages
441
What traffic(if any) uses the Larkfield curve? I’m assuming not even any passenger ECS workings go that way?
Empty coaching stock to and from Corkerhill and East Kilbride use it Monday to Friday, reversing at Polmadie. Essential for Glasgow Central guards' and Corkerhill drivers' route retention.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
I noticed this in the OBC/FBC:-

“If double tracking was to be introduced on the East Kilbride corridor at a future date it would cost [REDACTED TEXT] more due to the need to shift and reinstall the OLE in order to introduce the double tracking.”

Might there be some logic in deferring electrification of the East Kilbride branch until such time as the long term impact of Covid is better understood and the issue of the all important double tracking can be revisited? Operate BEMUs in the meantime. BEMUs will probably be operating to Kilmarnock anyway.

I worry that full wiring of the branch now will lock in the single track arrangement for a very long time.
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,497
Location
Preston Lancs
I am conflicted on this. On the one hand I love every kilometre of electrification and just want to get it done. On the other hand I don’t like waste and jobs done twice and inferior infrastructure locked in for a long time.
 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
One possibility might be to electrify the already-double-tracked western half of the EK branch, where any decisions about positioning the OLE supports cannot get in the way of any future doubling.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
One possibility might be to electrify the already-double-tracked western half of the EK branch, where any decisions about positioning the OLE supports cannot get in the way of any future doubling.
Good shout. Wiring the steep 4-mile section up to Busby would remove any BEMU performance concerns.

Politically it would be sensible to explain that future demand is uncertain, say that double tracking will be reconsidered in future and that it wouldn’t be prudent to wire the single track section as it would have to be redone at significant cost if double tracking was to go ahead. In the meantime you’ll still get shiny new electric trains.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,556
Location
Neilston, East Renfrewshire
Might there be some logic in deferring electrification of the East Kilbride branch until such time as the long term impact of Covid is better understood and the issue of the all important double tracking can be revisited?

Personally I remain to be convinced that doubling Busby/East Kilbride, while nice to have, is essential; The current infrastructure supports a half-hourly service, is there ever likely to be the traffic to justify an increased frequency ? Not to mention how such an increase would be accommodated between Busby Junction and Glasgow Central, and at Central itself.
 

92002

Established Member
Joined
27 Mar 2014
Messages
1,253
Location
Clydebank
Personally I remain to be convinced that doubling Busby/East Kilbride, while nice to have, is essential; The current infrastructure supports a half-hourly service, is there ever likely to be the traffic to justify an increased frequency ? Not to mention how such an increase would be accommodated between Busby Junction and Glasgow Central, and at Central itself.
Given that platforms are getting extended, trains can be longer. In the peak it can take a larger service. So probably should be fine the way it is.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,100
I don’t know the line but on the single track section could you not install twin track cantilevers such that they wouldn’t need moving, and just position the equipment on them accordingly in the interim (presumably around the mid point)?
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
The current infrastructure supports a half-hourly service, is there ever likely to be the traffic to justify an increased frequency ?
It depends on Covid’s long term impact on travel patterns. It’s not that long ago that an increased frequency was the publicly stated plan so the potential must be there.

Why not hold off wiring the single track section for a few years until we have a clearer picture of future demand? Wire the double track section if required and operate BEMUs in the meantime. If it transpires that an increased frequency isn’t justified then we can forget about double tracking and wire the remaining section for EMU operation.
 
Last edited: