Ah yes, off Cassington Road.Have a look at the industrial estate next to the "Banbury" line next to the A44 Woodstock Road bridge![]()
Ah yes, off Cassington Road.Have a look at the industrial estate next to the "Banbury" line next to the A44 Woodstock Road bridge![]()
Indeed - with the amount of egg already on the North's face with the scaling back of HS2's eastern leg to Leeds, it would've been very embarrassing for Bojo et al, on top of all else they've had going on lately!Nothing mentioned today, but then it wouldn't make sense politically, as it would look like money had been taken from the north to spend on electrification in the south!
Plus - you never know, Didcot - Oxford may be announced soon too...
It could have been any combination of those three. The steelwork is fairly standardised, so depending on individual x-section designs for a structure (or pair of structures), they could've gone anywhere.Was it ever unannounced ?
There was the story that a load of Furrer & Frey as sold for scrap, but was that for Chippenham - Bristol, or Filton - Bristol, or was it actually Didcot - Oxford.
There should be in information request into what happened, particularly if it was tax payers money, or more importantly if there was any truth in it.
Hanging on to the steelwork with no firm date for it's use could well have cost the taxpayer more in having to store and secure it than it does to sell for scrap to recover a little bit and then buy new when you need it again.Was it ever unannounced ?
There was the story that a load of Furrer & Frey as sold for scrap, but was that for Chippenham - Bristol, or Filton - Bristol, or was it actually Didcot - Oxford.
There should be in information request into what happened, particularly if it was tax payers money, or more importantly if there was any truth in it.
Theres two seperate cables at Kennington- one runs along the fence line and the other along the path of the old goods loop ( which should be reinstated in 8 years) Think there will be a programme of works which will go something like this - Upgrade the THA- OLE didcot to Oxford north- Upgrade oxford station north- OLE East WestThere happens to be a Nat Grid feeder ("East Claydon") is helpfully located adjacent to the former Met. Granborough Road station that will feed HS2 and has spare capacity after that. Just 3/4 of mile along the old railway alignment to the former Verney Jn if you were looking to feed EWR...
(The HS2 feed is along the other direction of the former Met line alignment towards Quainton then straight lining the last bit to HS2)
400 kV substation at Cowley and the 400kV line runs along side the railway in Kennington - Hinksey and goes into tunneled cables next to Hinksey Yard (with isolators...)
132 kV substation at Yarnton Just North of Wolvercote Jn which is why there is interest in electrifying to Hanborough as it provides the feed and electrifies
THA? Is that the Thames Valley??Theres two seperate cables at Kennington- one runs along the fence line and the other along the path of the old goods loop ( which should be reinstated in 8 years) Think there will be a programme of works which will go something like this - Upgrade the THA- OLE didcot to Oxford north- Upgrade oxford station north- OLE East West
Kennington to Cowley. Its the ELR.THA? Is that the Thames Valley??
Electrification of the route to offer better rolling stock performance, align with the Traction Decarbonisation Network Strategy (TDNS) and contribute to the decarbonisatoin of the rail network
It sets out Network Rail’s EWML principle aims, which are:
Passenger services covering a wider geographic area than currently remitted
Ensuring that EWR’s infrastructure changes do not preclude the potential of future service to additional locations
An appropriate service frequency and pattern to best reduce journey times
Ensuring the EWR’s infrastructure changes do not preclude exploration of new national routing options for freight
Electrification of the route to offer better rolling stock performance, align with the Traction Decarbonisation Network Strategy (TDNS) and contribute to the decarbonisatoin of the rail network
Integration of the European Traffic Control System digital signalling to enhance future capacity
I dont think electrification could be called much more than a vague aspiration at this time. I doubt there's any serious timescale thst has been put on it.In answer to the question, quite probably.
From a longer list:
I dont think electrification could be called much more than a vague aspiration at this time. I doubt there's any serious timescale thst has been put on it.
The gullible idiots at DfT and/or treasury were worried something would come along in the meantime to make electrification redundant/unnecessary. But it’s just one of the many ways EWR has been continually reduced in scope over the last few years.Late to the party, but why wasn't this electrified from the get go...? Is it the Treasury again?
I think it was also a realisation by some of the clever heads at DfT/Treasury that electrifying Oxford not long before you rebuild it wasn't massively sensible. If EWR is then a single ended connection I wouldn't be surprised if it changed the power supply design quite substantially.The gullible idiots at DfT and/or treasury were worried something would come along in the meantime to make electrification redundant/unnecessary. But it’s just one of the many ways EWR has been continually reduced in scope over the last few years.
Also, Bedford to Bletchley would still be running diesels
1. Any rebuild would require changes over the single line sections.Just do that now as well. It's a short line with few bridges or other obstructions. Bonus: you could lose the unreliable 230s and use 350s.
2. Few bridges but many level crossings which are arguably worse.
Is there a ban on new electrification over level crossings? If not, what changes must be made?
Just do that now as well. It's a short line with few bridges or other obstructions. Bonus: you could lose the unreliable 230s and use 350s.
BIB - April the 1st was last week.
Basically too many lillies who are trying to build a very expensive railway by trying to get other agencies to fund it.Late to the party, but why wasn't this electrified from the get go...? Is it the Treasury again?
Because ultimately electrification has not been at all popular with railway management for decades.Late to the party, but why wasn't this electrified from the get go...? Is it the Treasury again?
Height of vehicle against height of wire. Potential point of conflict and defilement if a tall vehicle struck the wire.Is there a ban on new electrification over level crossings? If not, what changes must be made?
Height of vehicle against height of wire. Potential point of conflict and defilement if a tall vehicle struck the wire.
Needs to be risk assessed. A bridge is a static obstacle, a level crossing has a dynamic risk. Its not anything that can't be solved, but for instance wire gradient from an adjacent obstruction to the level crossings, as was the case at Challow or nearby I believeAgain, what changes must be made? The issues are, with respect, obvious.
You may be thinking of the notorious bridge at Steventon where a major part of the problem was its proximity to a level crossing.Needs to be risk assessed. A bridge is a static obstacle, a level crossing has a dynamic risk. Its not anything that can't be solved, but for instance wire gradient from an adjacent obstruction to the level crossings, as was the case at Challow or nearby I believe
That somewhat depends on what one considers ‘electrification ready’ to mean.AFAIK EWR is not currently planned to be electrification ready
They are not because there are no powers in place so to do at the moment.Happy to be corrected if EWR contractors actually are piling and concreting the bases, whilst working on the trackbed.
That's the one, thanks. There was also a level crossing near York (Joan Croft) where the replacement with a bridge enabled the wire height to be lowered, which obviously benefitted something as it was touted as a benefit of the scheme on publicity.You may be thinking of the notorious bridge at Steventon where a major part of the problem was its proximity to a level crossing.