Apparently they're keeping 415, 416 and 417. The rest are going. 412 has already disappeared.
I'm fairly sure 5 sets are used Monday-Friday. 1 obviously on the St. Albans branch, and there are two peak hour diagrams for a pair of units, and I'm fairly sure one of these diagrams does an out and back Tring service during the day if I remember correctly. I'm open to be corrected of course, but I'm fairly sure that's the utilisation. What I don't understand is why don't they just order another 3 (if that's how many 321's they plan to keep) 350/2's and release the last 3, instead of whittling it down to 3 they need. Then they could be deployed out of Liverpool Street or Kings Cross. Or maybe even Northern would be interested in them. It just doesn't make sense having a tiny fleet. But then I suppose money and common sense are the obstacles preventing this from happening...There are currently 4 (or is it 3 - St Albans + 2/3??) SX diagrams for LM's 321s, so that would suggest 7 are not needed, but 3 wouldn't be enough.
I'm just thinking about your 317/321 comment. (This won't happen I highly doubt), But if LM do obtain the extra 350's to have a uniform fleet, the 7 321's could go to NXEA. Also, move the 13 321's from FCC to NXEA. This means that they would be receiving 20 units. The new NXEA 379's are supposedly going to release 21 317's. Send 20 of these to FCC so they have a complete fleet of 32 317's instead of a mixed fleet of 317/321's. The additional 317 left over could be an eight hundred numbered set, in which case just renumber it in the five hundred series. These exchanged 20 321's could be used on the Cambridge services as I'm pretty sure they have a higher gearing than 317's and would be better suited to faster/longer services. The displaced Cambridge operating 317's which would probably be 317/6's could be reseated in a 3+2 seating formation, and these can be used on inner surburban services alongside the 315's and 317/5's greatly improving capacity on the Chingford/Hertford East lines and other stopping services. I know this is extremely unlikely to happen, but do you reckon it will work? As for the 322's, I've read that NXEA are getting them this year/2012 to help out during the olympics. I don't know if the plan to renumber them as 321/5's is still going ahead. After they've served during the Olympic period they could go to Northern... Or NXEA could keep them.Aye- if money and common sense were available, LM would have that bigger fleet of 350s, Northern would have a few more 333s and FCC would have just 321s (add in the 322s, which are 322s in not-really-disguise) or 317s (depending upon what would be more use to NXEA).
Aye- if money and common sense were available, LM would have that bigger fleet of 350s, Northern would have a few more 333s and FCC would have just 321s (add in the 322s, which are 322s in not-really-disguise) or 317s (depending upon what would be more use to NXEA).
Can't see 3 from 3 working given LMs inability to maintain anything.
Thanks for the information.There are currently 3 SX 321 diagrams requiring 5 of the 7 units.
This is going down to 1 diagram on the Abbey Branch and 1 diagram SSuX doing Watford - Euston peak hour shuttle jobs.
Just out of interest, how have they managed to stand down the other 4 sets? More efficient maintenance which releases extra 350's or have they shortened some peak hour 350 workings which releases these 4 sets?Double set? This would be a bit tight maintenance wise wouldn't it?ah good quote from thejunction Also from December, the number of London Midland Class 321 diagrams has been cut to just three - the St Albans branch shuttle and a double set at peak times only which suggests there may be further fleet reductions in the coming months. The new diagrams are available on the 'Diagrams' page'
Thanks for the information.Just out of interest, how have they managed to stand down the other 4 sets? More efficient maintenance which releases extra 350's or have they shortened some peak hour 350 workings which releases these 4 sets?
There are currently 3 SX 321 diagrams requiring 5 of the 7 units.
By that do you mean 2 diagrams are for double units, ie a single one on the St Albans, and two 8 car diagrams? Wouldn't that normally be described as 5 diagrams?
I think its worth pointing out that LM have been after a 'growth build' of 350's for some time - the DfT are due to decide on this in the near future, along with similar units for Manchester-Glasgow. This would presumably both lengthen existing services and eliminate the remaining 321's.
Chris
I believe that there is a diagram for it now. I'm sure it's the 1720 off the Street, and either the 2100 or 2130 return from Norwich (Mon-Fri only).