• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Where could class 350/2s units go?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,186
I often wondered if York built EMUs using the same sprinter body shell could be interlinked, ie a 317/150 hybrid, so it could run of diesel or AC, or if the trailers could be extracted to lengthen 150’s.
The closest you'd get with the technology of the time was a Class 210.
 

Scotrail314209

Established Member
Joined
1 Feb 2017
Messages
2,475
Location
Edinburgh
I suggest that the 350 could replace the Northern's 323 which in turn would replace the ScotRail's 320.
Wouldn’t work at all. The 323s are 23m I believe, which means significant lengthening of platforms would need to be happen in order to run them as 6 car. Said lengthening is too expensive to do. (Subject for another thread though)
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
I know it’s been shot down time and time again, but seeing as it’s speculative I’ll throw it out there.

350/2S to be converted to 2+2 and fitted with 3rd rail collection equipment, cab redesign and bought up to the same standard as 450s/444s including fitting and testing of ASDO. This way they can operate in the same pool as the rest of the Desiro stock, but would primarily be used on Portsmouth services. I know Northam are full with limited diagrams arriving and departing, but the fitters that worked on 442s, and would work on the 458s would just be converted to 450/2 fitters, based out of Bournemouth. This would enable the 458s to be scrapped, or transferred to SE to see off stock that was no longer wanted. I would imagine the refurbishment for the 450/2s would be around the same sort of cost involved in the 458 work and training that’s about to be undertaken.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
I know it’s been shot down time and time again, but seeing as it’s speculative I’ll throw it out there.

350/2S to be converted to 2+2 and fitted with 3rd rail collection equipment, cab redesign and bought up to the same standard as 450s/444s including fitting and testing of ASDO. This way they can operate in the same pool as the rest of the Desiro stock, but would primarily be used on Portsmouth services. I know Northam are full with limited diagrams arriving and departing, but the fitters that worked on 442s, and would work on the 458s would just be converted to 450/2 fitters, based out of Bournemouth. This would enable the 458s to be scrapped, or transferred to SE to see off stock that was no longer wanted. I would imagine the refurbishment for the 450/2s would be around the same sort of cost involved in the 458 work and training that’s about to be undertaken.

Whilst I don't disagree with the idea of converting them to 3rd rail - why do you think South Eastern would want the 458s ? They are a 'one off' and only SWR has any experience of operating them.

Not sure South Eastern should become the dumping ground of any odd-ball 3rd rail stock which might become surplus.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,450
Location
"Marston Vale mafia"
350/2s converted to third rail and reseated to a Class 350/1 style 2+2 interior would be perfect for the Pompey Direct, I agree. 458s should just go in the bin, they're old, not particularly good and there's a glut of EMUs.
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
They are a 'one off' and only SWR has any experience of operating them.
350/2s converted to third rail and reseated to a Class 350/1 style 2+2 interior would be perfect for the Pompey Direct, I agree. 458s should just go in the bin, they're old, not particularly good and there's a glut of EMUs.
The 458s already have a 2+2 interior and are about to be refurbished for use on the PDL, so it seems like a waste of money and effort to bin them and start over on the 350s. I can't imagine that Porterbrook are being particularly precious about the 458 lease charges either, so surely they'd be better off trying to keep both the 350/2s and 458s in use rather than swapping one for the other.
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
The 458s already have a 2+2 interior and are about to be refurbished for use on the PDL, so it seems like a waste of money and effort to bin them and start over on the 350s. I can't imagine that Porterbrook are being particularly precious about the 458 lease charges either, so surely they'd be better off trying to keep both the 350/2s and 458s in use rather than swapping one for the other.

The current interior on the 458s would not be suitable for the 2 hour journey, of many passengers travel end to end, and so they’ll need a major interior re-work, re-gearing and having an intermediate coach removed. you’ve also got the training costs involved which will be more substantial than on Desiro based. In regards to the leasing costs, you’re probably correct.

The reason I suggested potentially SE wasn’t to suggest it’s the 3rd rail dumping ground, but because they’re still newer and possibly better than many of the networkers, although they’d need to be returned to 4 car units.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,831
I know it’s been shot down time and time again, but seeing as it’s speculative I’ll throw it out there.

350/2S to be converted to 2+2 and fitted with 3rd rail collection equipment, cab redesign and bought up to the same standard as 450s/444s including fitting and testing of ASDO. This way they can operate in the same pool as the rest of the Desiro stock, but would primarily be used on Portsmouth services. I know Northam are full with limited diagrams arriving and departing, but the fitters that worked on 442s, and would work on the 458s would just be converted to 450/2 fitters, based out of Bournemouth. This would enable the 458s to be scrapped, or transferred to SE to see off stock that was no longer wanted. I would imagine the refurbishment for the 450/2s would be around the same sort of cost involved in the 458 work and training that’s about to be undertaken.

350/2s converted to third rail and reseated to a Class 350/1 style 2+2 interior would be perfect for the Pompey Direct, I agree. 458s should just go in the bin, they're old, not particularly good and there's a glut of EMUs.
Ah the usual forum fantasy trains that ignores the realities of the world like commercial contracts. It further ignores that the 350/2s and 458s have the same owner, so there’s no real benefit for them.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
If it wasn't for the HeX 387s then GWR may have not been a bad fit, with the displaced 387s going to c2c, SE, Southern etc.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,794
Location
West of Andover
They could even be reduced to (or reformed as) 3-car 350s and replace 318s as well as 320s with ScotRail.
You will also need to do something with the doors being slower to open compared to the 318/320s.

--------

Had Northern not gone for the 323s then they might have made a reasonable replacement for the 323s & 319s (although the doors are slow). Breaking out my crayons
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
If it wasn't for the HeX 387s then GWR may have not been a bad fit, with the displaced 387s going to c2c, SE, Southern etc.

Not enough - there are only 37 x 350/2, whereas GWR has 42 x 387.

== Doublepost prevention - post automatically merged: ==

Had Northern not gone for the 323s then they might have made a reasonable replacement for the 323s & 319s (although the doors are slow). Breaking out my crayons

Possibly on the 319s, but the 323s are 23m (350s are 20m), so there may be signal / platform issues which allow for 2 x 323 but not 2 x 350.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,794
Location
West of Andover
Not enough - there are only 37 x 350/2, whereas GWR has 42 x 387.

== Doublepost prevention - post automatically merged: ==



Possibly on the 319s, but the 323s are 23m (350s are 20m), so there may be signal / platform issues which allow for 2 x 323 but not 2 x 350.

Other than the odd Manchester - Stoke service on busy weekends, is there any routine pairs of 323s in Northern?
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
GWR has 48 387s (387130-387174/301/302/306) with 12 allocated to HEX (387130-387141) - ie 36 operational units.

Fair enough - I took the numbers from Wikipedia.

== Doublepost prevention - post automatically merged: ==

Other than the odd Manchester - Stoke service on busy weekends, is there any routine pairs of 323s in Northern?

The Stoke - Manchester usually uses the bay at Stoke, and that can only take 1 unit........ So 2 x 323 on that is going to be rare, because otherwise it means blocking a platform at Stoke.

On the other part, no idea.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,186
Ah the usual forum fantasy trains that ignores the realities of the world like commercial contracts. It further ignores that the 350/2s and 458s have the same owner, so there’s no real benefit for them.
Bingo. Porterbrook has to spend the money if they want to keep the 458s in revenue service.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
It's a shame there isn't spare capacity on the WCML. Otherwise you could get an Open Access Operator to refurbish them and run a cheap service from London to Glasgow/Edinburgh with maybe one stop in Manchester. Sort of like the WCMLs version of Lumo.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,450
Location
"Marston Vale mafia"
It's a shame there isn't spare capacity on the WCML. Otherwise you could get an Open Access Operator to refurbish them and run a cheap service from London to Glasgow/Edinburgh with maybe one stop in Manchester. Sort of like the WCMLs version of Lumo.

That almost did happen with Mk4s then COVID killed it.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
It's a shame there isn't spare capacity on the WCML. Otherwise you could get an Open Access Operator to refurbish them and run a cheap service from London to Glasgow/Edinburgh with maybe one stop in Manchester. Sort of like the WCMLs version of Lumo.

Even with the paths it would be a deeply unattractive journey, not comparable to Lumo.

Euston - Manchester (current timings, so 125mph stock) is ~2h 15m, Manchester - Glasgow is ~3h 20m, so a combination of those would be over 5h 30m - and 110mph Desiros on an OAR with random stopping patterns would be slower than that, compared to Euston - Glasgow ~4h 30m.

Not comparable to Lumo who's timings are comparable to LNER's (quicker than some, slower than others depending on LNER stopping patterns).

That's before HS2 shaves another chunk off Euston - Glasgow times.

== Doublepost prevention - post automatically merged: ==

That almost did happen with Mk4s then COVID killed it.

No - Grand Central only applied for Euston - Blackpool so not Glasgow / Edinburgh and not via Manchester.

They are an OAR, but that's about the only similarity with Lumo....
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
Even with the paths it would be a deeply unattractive journey, not comparable to Lumo.

Euston - Manchester (current timings, so 125mph stock) is ~2h 15m, Manchester - Glasgow is ~3h 20m, so a combination of those would be over 5h 30m - and 110mph Desiros on an OAR with random stopping patterns would be slower than that, compared to Euston - Glasgow ~4h 30m.

Not comparable to Lumo who's timings are comparable to LNER's (quicker than some, slower than others depending on LNER stopping patterns).

That's before HS2 shaves another chunk off Euston - Glasgow times.
Does Lumo have random stopping patterns? I thought it was London - Newcastle - Edinburgh. What I was talking about was similar, London - Manchester - Glasgow/Edinburgh. Again, no randomn stopping patterns as far as I can tell. Yes, it's 110, but factor in Lumo plus travel between Edinburgh and Glasgow, and Glasgow at least starts to look attractive, IMO.

Oh, and HS2 isn't here yet, not for another 15 - 20 years.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,340
Otherwise you could get an Open Access Operator to refurbish them and run a cheap service from London to Glasgow/Edinburgh with maybe one stop in Manchester. Sort of like the WCMLs version of Lumo.
Why is it going to be cheap? An understanding really must get reached that you can't just put an open access operator on to run a 'cheap' service.
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
Does Lumo have random stopping patterns? I thought it was London - Newcastle - Edinburgh. What I was talking about was similar, London - Manchester - Glasgow/Edinburgh. Again, no randomn stopping patterns as far as I can tell. Yes, it's 110, but factor in Lumo plus travel between Edinburgh and Glasgow, and Glasgow at least starts to look attractive, IMO.

Oh, and HS2 isn't here yet, not for another 15 - 20 years.
That would create massive pathing issues.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Does Lumo have random stopping patterns? I thought it was London - Newcastle - Edinburgh. What I was talking about was similar, London - Manchester - Glasgow/Edinburgh. Again, no randomn stopping patterns as far as I can tell. Yes, it's 110, but factor in Lumo plus travel between Edinburgh and Glasgow, and Glasgow at least starts to look attractive, IMO.

Oh, and HS2 isn't here yet, not for another 15 - 20 years.

Lumo doesn't, but an OAR on the WCML with 110mph stock, even if paths were there, would not get a London, Manchester Glasgow service with just those stops.

The existing WCML operators have never been able / allowed to run London - Manchester or Manchester - Glasgow non stop.

And why would London - Manchester - Glasgow which would be over an hour slower end to end be attractive? The current London Glasgow's biggest competitor is Easyjet - a slower service on suburban stock isn't going to be attractive.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
Lumo doesn't, but an OAR on the WCML with 110mph stock, even if paths were there, would not get a London, Manchester Glasgow service with just those stops.

The existing WCML operators have never been able / allowed to run London - Manchester or Manchester - Glasgow non stop.

And why would London - Manchester - Glasgow which would be over an hour slower end to end be attractive? The current London Glasgow's biggest competitor is Easyjet - a slower service on suburban stock isn't going to be attractive.
Ok add beuraucracy to the list of it's a shame that exists so we can't do this.

If the stars aligned and the preferred route was possible though, the lack of stops would be how it gets there quicker. Just like Lumo. Maybe I need to charter a Deltic with some 110 capable coaches to prove my point (and here comes the argument of whether or not a Deltic can do a sustained 110).....
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,340
Lumo can do cheap, why can't someone else?
Lumo got its access rights by putting a case that it was competing with airlines on time and adding passengers to the railway. To some extent, that is a little dubious as it will be taking market from LNER as well. It is looking to use its trains intensively and concentrate traincrew at a single Newcastle base.

Running London to Glasgow via Manchester in six, maybe seven hours is neither intensive or good competition against other flows. The demand from London to Glasgow is less than Edinburgh in any case.

Maybe I need to charter a Deltic with some 110 capable coaches to prove my point (and here comes the argument of whether or not a Deltic can do a sustained 110).....
Or, perhaps a class 90 that can actually do 110mph. Going via Manchester adds time to the journey even if paths were available.

What journey time could sensibly be achieved with a 350 in your view?
 
Last edited:

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Ok add beuraucracy to the list of it's a shame that exists so we can't do this.
Tinfoil hat nonsense.

The simple facts are via Manchester is longer, slower (because the linespeeds are slower) and you're suggesting the use of 110mph stock compared to 125mph which is used which is also slower.

You'll be adding over an hour to the current journey time and limited stopping which in turn will limit its usefuleness.

This feels more like a crayonista desire to cover certain routes on certain stock than a sensible proposal.
 
Status
Not open for further replies.

Top