Shame the plan has been cut back in terms of planforms (what's the betting we'll be back in 10 years to add an extension?) but let's just get on and get the thing built.
So how many platforms will Euston have in total once the work is completed?
The BBC and many other media reports in more or less detail are all based on this press release from HS2: https://mediacentre.hs2.org.uk/news/first-look-at-new-designs-for-hs2-london-euston-station
Another UK station (like London Bridge) that looks like it's in Switzerland. We need more of this.
Though unlike at the new London Bridge, I've never had the slightest problem finding my way round at any Swiss station. I like places which [I think!] look "nice" - but that has to come second to functionality and ease of way-finding for a public transport interchange.
That's just a matter of good signage, and I'd agree that the signage is a bit lacking at London Bridge.
25 I believe - 10 HS2 and 15 regular (1-3, 4-7, 8-11 and 12-15).
But presumably the cutting of HS2 from 11 to 10 results in an increase in the number of non-HS2 platforms remaining?i thought it was 13 regular and originally 11 hs2 now cut to 10
But presumably the cutting of HS2 from 11 to 10 results in an increase in the number of non-HS2 platforms remaining?
I've only used Birmingham New Street a couple of times since the redevelopment, and it's one where I genuinely get lost. Both leaving via the exit I wish, and also trying to get to the right platform. I've completely lost my orientation there. Have to say the signage isn't very good there.That's just a matter of good signage, and I'd agree that the signage is a bit lacking at London Bridge.
Does the design allow for any pedestrian access from Eversholt St? Preferably near Phoenix Rd to allow direct access to St Pancras....
Though unlike at the new London Bridge, I've never had the slightest problem finding my way round at any Swiss station. I like places which [I think!] look "nice" - but that has to come second to functionality and ease of way-finding for a public transport interchange.
I think that the number of NR platforms is not affected by the change from 11 to 10 HS2 platforms. Rather, there may be less land take required on the western edge of the site.I do seem to recall that the benefit of only doing 10 was that you don't need to do it in two phases as less of the existing building is affected. So that would make some sense, i.e. that the 11th HS2 platform would go where 14 and 15 are now.
Unless you arrive at the low level platforms concourse, and go through through the gate line as you do when you want platforms 1-9 and think where the heck are they?!I've never had a problem at the new London Bridge. Platforms are all in numerical order, and the access to them is through one large concourse. I don’t know how it could be any more simple.
the good news is that the guy in charge of building this station also built Blackfriars and London Bridge (in the latter case, he left mid build for this job).
I think that idea was ruled out in discussions on previous pages of this thread. For example, my view was expressed in #59 and #101, and confirmed by others in #60, #102 and #104.I think that the number of NR platforms is not affected by the change from 11 to 10 HS2 platforms. Rather, there may be less land take required on the western edge of the site.
I've only used Birmingham New Street a couple of times since the redevelopment, and it's one where I genuinely get lost. Both leaving via the exit I wish, and also trying to get to the right platform. I've completely lost my orientation there. Have to say the signage isn't very good there.
I think that the number of NR platforms is not affected by the change from 11 to 10 HS2 platforms. Rather, there may be less land take required on the western edge of the site.
Until HS2 full service, it would be extremely difficult to operate the full Avanti and LNR service using 11 platforms
"The pub is c**p, the loos cost cash and the signage is appalling", said MJ Hibbett of the original. But the new one does indeed have terrible signage. The one it really lacks is a big, simple "Bullring this way" sign, as everyone who has been there before knows where that is. The signs actually say something like the names of roads I can never remember.
== Doublepost prevention - post automatically merged: ==
I don't believe that is correct. The reason for the descoping was specifically that it meant it could be built in one phase because it has less of an effect on the existing layout. It might be that they fill in 14-15 and put shops there or something, but I am pretty certain the whole point was that they would only need to take 16 to finish the job.
Until HS2 full service, it would be extremely difficult to operate the full Avanti and LNR service using 11 platforms (LO appear to now use both 9 and 10). Wasn't the original plan that they would bulld the first few, launch WCML HS2 service on some routes, then build the other ones which would then be feasible as the classic service would then be less frequent?
Wait until its down to 14 for a bit!its a hell of a job getting it to operate off 15 platforms.
Wait until its down to 14 for a bit!
Shame the plan has been cut back in terms of planforms (what's the betting we'll be back in 10 years to add an extension?) but let's just get on and get the thing built.
I believe the plan is for the HS2 trains to be 200m sets, so if there aren't enough passengers for 3 x 400m train per hour then one or more of the three departures could run as a 200m train instead. Frequency of service is every bit as important as journey time, so it is unlikely HS2 would want to run less frequently to Birmingham and Manchester in particular.I admire your optimism that the combined passenger numbers on both HS2 and the classic routes will require this.
HS2 trains are proposed to be 400m 1000+ seat capacity. Will 3000 per hour want to travel by HS2 to/from Birmingham / Birmingham Interchange and another 3000 per hour to Manchester most hours ? If not 2 trains per hour will suffice. Any peaks ought to be able to be platformed if they can be pathed throughout.
The infrastructure is designed for 400m long trains, but the trains will be 200m units. So any individual train might be 200m or 400m long.I'm pretty sure Birmingham/Manchester trains are supposed to be 400m long, once their respective new stations are built. If not, I don't see how they can justify the infrastructure.
You might be getting mixed up with the rolling stock itself, which will all be "classic compatible", I believe, rather than the wider GC gauge. Unless that's changed again since I last looked.
Well, quite. All I was saying was that the plan is for 3tph 400m services on London-Birmingham/Manchester. I make that about double the existing capacity, along with fewer intermediate connections along the way, but the government nonetheless believes it will be necessary.