Also I will profess not be knowledgeable of this area but what is the benefit from all this work other than providing fast lines to separate the stopping service can't see it provides that much benefit when it goes back to 2 track at Dewsbury. I see the fast lines will be 100mph where possible but given the geometry of the rest of the route it will give 1-2mins for 1.5B. Would have been better to have kept the works inside the existing railway boundaries and saved two to three hundred million on the heavy civil works.
Nit everything goes to Dewsbury.
You still have the trains that don‘t go through Dewsbury. Grand Central and Hudds - Wakefield services. Plus most Huddersfield and Calder Valley freight goes to/from Wakefield.