Looking back at your comment, I was reminded of something that just isn't around now. Much of the GEML still had jointed track in the '70s, and when the 309s were running in the 90mph plus sections, the clatter of the track joints certainly made the speed feel even faster. Sections I do remember was leaving Shenfield from P3, the CWR started just after the 6.25/25Kv changeover at Mountnessing. Then there was the stretch from Marks Tey station to the A12 Halstead Road junction, about two miles long. Here the trains would pass through the station, hit the Sudbury Line junction and the pointwork leading to the aggregate sidings. Then the jointed track would start, probably some of the fasted clickety clacks that I've ever travelled over.I love this sort of stuff. Not for the trains (which don’t interest me), but seeing the state of the infrastructure and how it was operated. Thank you for posting, @AM9
Another interesting fact was that the 309s had an experimental wheel profile that reduced/eliminated hunting at speed. I imagine that it was later adopted elsewhere on the higher speed trains at the time.