Didcot stoppers will surely go.Exactly. Running a few services to get a share of the revenue isn't part of the thinking in the new order.
Didcot stoppers will surely go.Exactly. Running a few services to get a share of the revenue isn't part of the thinking in the new order.
I highly doubt it, as many people in the Thames Valley will miss out on a local service to London. That being said, wouldn’t be surprised if GWR withdrew stops from Hayes, Ealing and West Drayton as a result…Didcot stoppers will surely go.
So they’ll turn into Reading-Didcot shuttles? What happens when Oxford eventually gets its wires? (As the expectation was that the Didcot stoppers would return to being Oxford stoppers as they used to be)Didcot stoppers will surely go.
Errr nope!Didcot stoppers will surely go.
Hayes & H., Ealing and West Drayton - Those stops are somewhat there for both historical and revenue grab reasons.I highly doubt it, as many people in the Thames Valley will miss out on a local service to London. That being said, wouldn’t be surprised if GWR withdrew stops from Hayes, Ealing and West Drayton as a result…
Some of the passengers will transfer to Crossrail services when they are operating at higher service levels and I'd expect them to run fast on the mains from Twyford off-peak too.Errr nope!
These are 12 car units in the peak and packed! Off peak are 8 cars and very busy. Where exactly do you expect the passengers to go?
GWR will not want to suffer major passenger losses from Cholsey, Goring, Pangbourne & Tilehurst who travel through to Maidenhead, Slough, Hayes, Ealing and London you know!
They cannot cut intermediate stops of they catch up with purple trains either and at peaks already run fast on the mains from Twyford.
Maybe in timeSome of the passengers will transfer to Crossrail services when they are operating at higher service levels and I'd expect them to run fast on the mains from Twyford off-peak too.
Errr nope!
These are 12 car units in the peak and packed! Off peak are 8 cars and very busy. Where exactly do you expect the passengers to go?
GWR will not want to suffer major passenger losses from Cholsey, Goring, Pangbourne & Tilehurst who travel through to Maidenhead, Slough, Hayes, Ealing and London you know!
They cannot cut intermediate stops of they catch up with purple trains either and at peaks already run fast on the mains from Twyford.
OK lets explain if for you then!What is wrong with these passengers changing trains? I don't understand why it's such an issue for them not to just change at Reading onto a fast non-stop service to Paddington.
OK lets explain if for you then!
You are on a comfortable class 387, with a seat, your laptop on the table and a cup of tea / coffee beside you arriving at Reading and your train arrives in London when you need it. You arrive earlier at the station to ensure a parking space and to give extra time for delays. Why get off?
Why would you pack up all that and cross over the mountainous bridge to fight over a fast train seat that's less comfortable and will save you a matter of a few minutes?
How would Reading cope if a packed 8 car unit emptied out for all to aim for the fasts? They wouldn't!
If you are going to Maidenhead, the most common peak destination or Slough etc more popular off peak with bags / kids / mobility issues why get off a comfy train & board a tube train with neck cranking transverse seats?
If it ain't broke, don't fix it!
I am not saying service patterns / stops will not change but passenger habits / preference will not.
We’ll see.
I don't think they will withdraw stopping at Hayes and Ealing Broadway as it would create significant interchange penalties for passengers.I highly doubt it, as many people in the Thames Valley will miss out on a local service to London. That being said, wouldn’t be surprised if GWR withdrew stops from Hayes, Ealing and West Drayton as a result…
That would probably be overall the best end solution, maybe even picking up the Slough stop from the Oxford services too.In the peak, when the trains are busy (or used to be, they’re not now) all the Didcot starters run Main line from Dolphin Jn or further west though (And don’t stop at Hayes or Ealing B) There’s no suggestion this won’t continue.
Off peak, when the trains are much less busy, it is less of an issue. However if there is space for them on the Main Lines in the peak, it’s not beyond the realms of possibility that there is off peak as well. Which would leave the Relief lines clear east of Airport Jn for EL trains and freight.
That isn't ideal as that would be extra paths taken up for the stop and then the crossing move. I guess one idea would be to see if the crossover could be made at Dolphin Junction to allow the Slough stop on the relief line rather than Slough West or the slow crossover at Maidenhead.That would probably be overall the best end solution, maybe even picking up the Slough stop from the Oxford services too.
I guess one idea would be to see if the crossover could be made at Dolphin Junction to allow the Slough stop on the relief line rather than Slough West or the slow crossover at Maidenhead.
Ah right, thanks, I guess the difference with Slough West is that a train having called at Slough is already going slowly at that point. None are ideal clearly.As a point of pedantry - Dolphin, Slough West and Maidenhead East are all 40mph, with Flashing Aspects on approach; none of the three crossing points are any slower than the others.
Ah, so that explains why so many units have gone into the depot via signal berth 6083 rather than the usual 0140 / 0142 routes. How long before restoration of the usual routes?Following the lineside fire Monday morning, the only access to/from the Crossrail depot is via either the Down Relief, Carriage Line and “Back Road”; or via the E&C flyover. As those trains from the COS are almost certainly going to the depot, unscheduled - they just get tipped out onto the Down Relief as and when the signaller sees fit.
Ah, so that explains why so many units have gone into the depot via signal berth 6083 rather than the usual 0140 / 0142 routes. How long before restoration of the usual routes?
Ah right, thanks, I guess the difference with Slough West is that a train having called at Slough is already going slowly at that point. None are ideal clearly.
Ah, so that explains why so many units have gone into the depot via signal berth 6083 rather than the usual 0140 / 0142 routes. How long before restoration of the usual routes?
Despite months of reassurances that Bond Street station is "catching up fast" with the rest of the Crossrail project, it has now officially been confirmed that the problem-hit station will not open with the rest of the Elizabeth line.
NCE only 4 days after the Guardian and Standard on this occasion.Crossrail to open before Bond Street
![]()
Bond Street: The story behind Crossrail's problem station | New Civil Engineer
At a London Transport Committee meeting this week, Transport for London (TfL) commissioner Andy Byford said he didn't "want to hold up line opening forwww.newcivilengineer.com
One does wonder how this is going to work on the GWML. Two pairs of tracks, paired by use (always more difficult for crossing movements) with six different speed bands of trains.there will still be services on the reliefs in 2023 the didcot stoppers and freight
Won't it just work the same way as it does at the moment? If all the relief line movements in the Paddington area run into the tunnel, the first conflict is with trains at Acton for which a dive under was put in. The only extra services relative to today might be an extra pair of Crossrail trains to Heathrow.One does wonder how this is going to work on the GWML. Two pairs of tracks, paired by use (always more difficult for crossing movements) with six different speed bands of trains.
Crossrail only run 2tph (4tph peak) to Reading and that doesn't appear to change with the start of through running. How much do the stone trains delay the existing TfL Rail service?In particular there are eastbound heavy stone trains, slowing to stop at Acton Yard, being followed all the way from Reading by Crossrail, who to interleave as planned at Paddington have to present there at better than to-the-minute accuracy.
They have the advantage of being daily.NCE only 4 days after the Guardian and Standard on this occasion.
One does wonder how this is going to work on the GWML. Two pairs of tracks, paired by use (always more difficult for crossing movements) with six different speed bands of trains.
- 125mph expresses
- 110mph emus running fast intermediate services (never part of the original plan)
- 100mph Heathrow Express
- GW outer suburban semi-fast services
- Crossrail, all/most stations stopping
- Heavy freight (probably the greatest tonnage of any line into London). Stone trains, Freightliners, etc
In particular there are eastbound heavy stone trains, slowing to stop at Acton Yard, being followed all the way from Reading by Crossrail, who to interleave as planned at Paddington have to present there at better than to-the-minute accuracy.
Isn't the first conflict westbourne park with the Didcot stoppers in the relief lines.Won't it just work the same way as it does at the moment? If all the relief line movements in the Paddington area run into the tunnel, the first conflict is with trains at Acton for which a dive under was put in. The only extra services relative to today might be an extra pair of Crossrail trains to Heathrow.
Isn't the first conflict westbourne park with the Didcot stoppers in the relief lines.
That's the Down direction, which is the easier one because you are not meshing a series of services from disparate starting points.But Heathrow Express clear the path before the next fast IET service.
Complete timetable rewrite will be required. But Heathrow Express clear the path before the next fast IET service. Whether it is a productive use of a path is a different question. I'd say 3tph on HeX is more than adequate and the future of HeX will be interesting to see once the Elizabeth line is full operational.
I don’t see it needing a complete rewrite, unless Crossrail are (again) flexing up their aspirations from the service spec that was agreed years ago.
Aren’t HEx also using 110 mph 387s now?One does wonder how this is going to work on the GWML. Two pairs of tracks, paired by use (always more difficult for crossing movements) with six different speed bands of trains.
- 125mph expresses
- 110mph emus running fast intermediate services (never part of the original plan)
- 100mph Heathrow Express