• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Potential weather disruption Tuesday 7th onwards - Storm Barra

Status
Not open for further replies.

plymothian

Member
Joined
26 Sep 2010
Messages
757
Location
Plymouth
Depends if the TMS is playing ball to reopen the doors, else they'll have to in the extereme egress every door.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

43172

Member
Joined
7 Oct 2020
Messages
161
Location
South west England
One door open at very front of the train,. Will give you a wave when i can get off (will use my umbrella to stick out) for those watching the dawlish feed
 

Requeststop

Member
Joined
21 Jan 2012
Messages
1,001
Location
Carbis Bay, St Ives, Cornwall
Earlier, (about 9:30) I saw both the up and down lines being used for services between Exeter and Newton Abbott. Given that the tide is now going out, couldn't GWR run a couple of services to Exeter and then a couple back to Newton Abbott and have used one of those services to pick up the stranded passengers on the waiting service at Dawlish? Seems simple to me. Surely not too difficult to arrange for GWR?
 

Peterthegreat

Established Member
Joined
22 Feb 2021
Messages
1,808
Location
South Yorkshire
Earlier, (about 9:30) I saw both the up and down lines being used for services between Exeter and Newton Abbott. Given that the tide is now going out, couldn't GWR run a couple of services to Exeter and then a couple back to Newton Abbott and have used one of those services to pick up the stranded passengers on the waiting service at Dawlish? Seems simple to me. Surely not too difficult to arrange for GWR?
Both up and down lines are blocked by failed trains.
 

AlexNL

Established Member
Joined
19 Dec 2014
Messages
1,721
When I look at Traksy I see that 1C70, the 07:04 Paddington to Paignton, has been at a stand somewhere between Teignmouth and Newton Abbott for quite some time now. Has this one failed as well?
 

irish_rail

On Moderation
Joined
30 Oct 2013
Messages
4,531
Location
Plymouth
IF special mode has been used then I suspect we are going to see the end of the 80xs in this neck of the woods in the next few years.
Question is what will we get instead? Just hopefully nothing stadler esq.
Of course the other way round it is the diversionary route, but I can't see the money for that ever being found whilst the country has to find the money somewhere down the back of the sofa for hs2 etc....
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,852
Location
"Marston Vale mafia"
IF special mode has been used then I suspect we are going to see the end of the 80xs in this neck of the woods in the next few years.
Question is what will we get instead? Just hopefully nothing stadler esq.
Of course the other way round it is the diversionary route, but I can't see the money for that ever being found whilst the country has to find the money somewhere down the back of the sofa for hs2 etc....

No EMU or DEMU can really deal with having a load of conductive salt water chucked over it. The real answer is the inland route, though costly.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,481
Location
Somerset
So the WR’s decision to go for hydraulics all those years ago had a point after all!
 

daveswest

Member
Joined
10 Jan 2013
Messages
21
Wonder if anyone will dare use the much touted " Resilience" word in the coming days !! Farcical goings on as we speak , nothing unusual with todays storm , thousands of man hours making the 800's sea-spray proof by design.....for nothing, same old same old , weather still wins :)
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,403
Wonder if anyone will dare use the much touted " Resilience" word in the coming days !! Farcical goings on as we speak , nothing unusual with todays storm , thousands of man hours making the 800's sea-spray proof by design.....for nothing, same old same old , weather still wins :)
How many times since they were introduced have the 80X fleet gone along Dawlish when waves have been coming over on to the top of the trains and they have Continued ok? Just curious
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,664
Location
Hampshire
No EMU or DEMU can really deal with having a load of conductive salt water chucked over it. The real answer is the inland route, though costly.
And perhaps the other real answer would not have been to have sold or marketed these as “Dawlish Proof”. It’s a pretty poor state of affairs that the issue, which is related to salt water coming into contact with the roof mounted electrical systems, has been known about for a while with the only fixes so far being to the TMS. I do wonder who made the decision after the first set had been disabled by the sea, to consider sending a second (and since failed) set to rescue it!
 

plymothian

Member
Joined
26 Sep 2010
Messages
757
Location
Plymouth
1C70 (down failed train) now moved to Newton Abbot.

2 out of 3 engines needed to move 1A77 have now been restarted.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,050
Location
Surrey
Wonder if anyone will dare use the much touted " Resilience" word in the coming days !! Farcical goings on as we speak , nothing unusual with todays storm , thousands of man hours making the 800's sea-spray proof by design.....for nothing, same old same old , weather still wins :)
The weather wins because they were either poorly specified in the first place or weren't adequately designed for this situation and ultimately the testing of them was inadequate to demonstrate compliance. Of course GWR just hide behind the automated announcements "due to todays wet weather conditions". These are the most expensive trains in the UK to lease yet they aren't fit for purpose but no politician will ever call the real issue out so its just allowed to perpetuate and they will hide behind the fact its Storm Barra.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,892
So the WR’s decision to go for hydraulics all those years ago had a point after all!
Not really. Diesel-electrics up to and including the HST haven’t had a problem. I suspect the answer might be to terminate at Exeter and Plymouth with a 15x/16x/HST shuttle between them.
 

CHAPS2034

Member
Joined
13 Mar 2018
Messages
651
1A77 just moved off a few minutes ago as I fired up the webcam

At 1355 passing Starcross
 

sonic2009

Established Member
Joined
19 Jan 2010
Messages
5,049
Location
Crewe
GWR website states ticket acceptance on local buses, @gwrhelp twitter and bus drivers say no acceptance.

Can take sometime to filter through, and do Stageocach SW have radios in the cab? Or the ability to receive messages through the ticket machine?
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,136
Location
Redcar
The weather wins because they were either poorly specified in the first place or weren't adequately designed for this situation and ultimately the testing of them was inadequate to demonstrate compliance.
Depends on how Hitachi interpreted this line in the Train Technical Specification I suspect:

TS1983 Full Functionality of the IEP Trains must be maintained during and after exposure to salt water spray and such exposure must not cause excessive cosmetic degradation of exposed surfaces, components and equipment.

So the specification drawn up by the DfT clearly had Dawlish in mind but what is "spray" and does what we've seen today (and on the other occasions this has been an issue) count as "spray" or not? Plenty of blame to go around I suspect but at least someone had the thought that best specify something to include provision for salt water exposure I guess.

Of course GWR just hide behind the automated announcements "due to todays wet weather conditions". These are the most expensive trains in the UK to lease yet they aren't fit for purpose but no politician will ever call the real issue out so its just allowed to perpetuate and they will hide behind the fact its Storm Barra.
Why would a politician ever call out the real issues? If they did that then it might raise uncomfortable questions about who specified these trains, who agreed the operational contracts with Agility Trains, who decided on the funding arrangements, etc etc. The answers to those questions could be very embarrassing for those same politicians. Far easier to keep shtum and let GWR take the flak.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,050
Location
Surrey
Depends on how Hitachi interpreted this line in the Train Technical Specification I suspect:



So the specification drawn up by the DfT clearly had Dawlish in mind but what is "spray" and does what we've seen today (and on the other occasions this has been an issue) count as "spray" or not? Plenty of blame to go around I suspect but at least someone had the thought that best specify something to include provision for salt water exposure I guess.
OK so it was specified so as you say how did Hitachi design a solution to it and it how was the engineering design validated, and by whom, how did they prove it in testing. Questions that will never get answered I know.
Why would a politician ever call out the real issues? If they did that then it might raise uncomfortable questions about who specified these trains, who agreed the operational contracts with Agility Trains, who decided on the funding arrangements, etc etc. The answers to those questions could be very embarrassing for those same politicians. Far easier to keep shtum and let GWR take the flak.
You are correct of course but we now have a culture of denial and lack of accountability for many facets of our lives today, not just the railways, which allows mediocrity to be perpetuated. At best we will get the stuck record of lessons will be learnt but they never are.
 
Status
Not open for further replies.

Top