Replacement LED signals have started appearing between York and Church Fenton over the past week. None have been fully erected or installed as of yet however a few are laid down in front of the signal they'll replace. A few on the Up & Down Leeds Lines between Church Fenton & Ulleskelf and at least 1 near Copmanthorpe on the Down Leeds
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
There's been a slight change in the page that's supposed to track progress on piling between Manchester and Stalybridge. The overall progress figure, last seen saying 10% complete, now says 40%. Given that we're in November on a project that was supposed to run from April to December, they would appear to be well behind schedule. There's also a bit saying they worked through the summer. The map is still without any red, yellow or green lines, though it did have some several months ago.


July is mentioned for unclear reasons, so perhaps the 40% is from then rather than now!!
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,514
Location
Preston Lancs
This is worrying. If they are way behind on this smallish project how the hell is that going to give the DfT and Treasury any confidence? Quite the opposite I would have thought.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,117
This is worrying. If they are way behind on this smallish project how the hell is that going to give the DfT and Treasury any confidence? Quite the opposite I would have thought.
And more to the point, if they can't even monitor/report on progress well enough to keep updated a website supposed to be reporting on progress, it would suggest that a) either they are well behind, so don't want to embarrass themselves by setting out truthfully the current position, or b) the project woefully underestimates the credibility that comes with keeping people informed having committed to doing so.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,668
There's been a slight change in the page that's supposed to track progress on piling between Manchester and Stalybridge. The overall progress figure, last seen saying 10% complete, now says 40%. Given that we're in November on a project that was supposed to run from April to December, they would appear to be well behind schedule. There's also a bit saying they worked through the summer. The map is still without any red, yellow or green lines, though it did have some several months ago.


July is mentioned for unclear reasons, so perhaps the 40% is from then rather than now!!

Having travelled the route again this morning I am not convinced piling is only 40% complete, it looks much more than that considering the plan wasn't ever for getting the piles as far as stalybridge station I don't believe.

I am not sure if there are any OLE amendments to make east of Victoria but the compound that has recently been built on the north side of the line just east of Miles Platting is definitely stockpiling OLE structure parts.
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Piles are in place up to the vicinity of Ashton Moss North Jn, can't verify ALL are there, but definitely appear to be.

Plus piles are now in place from Guide Bridge West Jn towards Stalybridge, as far as the start of the viaducts.

A substantial amount of land clearance taking place adjacent to the Up Huddersfield just after Stalybridge Junction, either for a work compound or other lineside facility.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The Manchester-Stalybridge "dashboard" page has been updated again. Red line (current work) shown around Ashton. Completion date not shown (previously given as December). Future dates in 2022 to be confirmed.

 

Viscount702

Member
Joined
7 Sep 2011
Messages
336
I noticed this evening that the pages on the NR website relating to TRU show just a black screen. I am hoping the pages are being updated in light of the IRP. The exception is the dashboard for Victoria- Stalybridge piling. I noted the addition of the red line yesterday but that was all. The FAQs page does give some additional information but that has not been upated. It says piling to end of year and before the end of the year steelwork will start going up. In light of the IRP it is my hope that the various pages will be updated to reflect what has now been announced and with a better idea of timing.

I would also like to know what they intend doing at Stalybridge if anything as this will clearly affect progress on wiring
 

twin turbo

Member
Joined
12 Oct 2019
Messages
33
Location
Leeds
The integrated rail plan still leaves it unclear as to exactly what they intend to do, a lot of talk about pinch points and reducing time from York to Manchester so will be interesting to see how they get those speeds up at Church Fenton with the curve south of the station. Many in Church Fenton are still wondering if they will still go ahead with the intended HS2 route to bypass the curve as the current electrification work stops right where the new line would integrate with the current track.

3.100 The rail corridor between Leeds and York is a constraint to boosting capacity and reliability from Leeds to Manchester as well as Leeds to Newcastle (because it is difficult to terminate more trains at Leeds). Previous plans have looked at using the HS2 Eastern Leg Church Fenton link to the East Coast Main Line. However, given the Government’s intended approach to the Eastern Leg set 112 Integrated Rail Plan for the North and Midlands out at paragraph 3.28, it intends to instead seek a scheme capable of being implemented earlier than previous plans, which will improve reliability and resilience, as well as future proofing for NPR.

3.28 Under previous plans for the HS2 Y-network, the Eastern Leg was planned to run from the West Midlands to an East Midlands Hub station at Toton, one of three regeneration sites in the region. Trains would then continue north, serving Chesterfield and Sheffield via a spur to the Midland Main Line (MML), or continue on new high speed line to a new station at Leeds, with a spur to the East Coast Main Line (ECML) to serve York, Darlington, Durham and Newcastle. However, in the light of cost increases, concerns about intermediate markets, development of plans for other schemes and analysis indicating a longer delivery timeframe since the route was confirmed in summer 2017,54 the Government has considered whether similar or better benefits could be obtained in a more affordable way, earlier and allow for an iterative approach to delivery.
 
Last edited:

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
I personally don't see how finishing NPR at Marsden will help increase capacity to Huddersfield as it will still be a two track railway between those points with all the constraints that imposes. Leeds to Church Fenton the same.

Also how many trains can be formed of solely EMUs? all the branches east of Leeds to Hull, York and beyond today served by TPE still seem to have no plans for wires? So again BMUs will needed with all the heavier track forces applied that electrification seemed to be trying to avoid / get rid of.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,691
Location
Nottingham
I personally don't see how finishing NPR at Marsden will help increase capacity to Huddersfield as it will still be a two track railway between those points with all the constraints that imposes. Leeds to Church Fenton the same.

Also how many trains can be formed of solely EMUs? all the branches east of Leeds to Hull, York and beyond today served by TPE still seem to have no plans for wires? So again BMUs will needed with all the heavier track forces applied that electrification seemed to be trying to avoid / get rid of.
The two track section shared by fast and slow trains is shorter and the number of stations along it is reduced. Currently a slow train has to get from Stalybridge to Huddersfield before it can be overtaken (discounting a wait of several minutes at Diggle Junction). If built as planned it would only have to get from Marsdent to Huddersfield.

There are no details of where trains would continue northward/eastward from Leeds, but electrification to York is mentioned and I think it's likely they would continue to Newcastle. Other destinations might be electrified in the meantime, or might get bi-modes that would probably stay on the existing route west of Marsden.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,854
I personally don't see how finishing NPR at Marsden will help increase capacity to Huddersfield as it will still be a two track railway between those points with all the constraints that imposes. Leeds to Church Fenton the same.

the IRP (and this thread) explains that there will be 3/4 tracks between the new line merging with the existing line at Marsden and Huddersfield, and a 4 track section fir some of the way from Leeds to Church Fenton.


Also how many trains can be formed of solely EMUs? all the branches east of Leeds to Hull, York and beyond today served by TPE still seem to have no plans for wires? So again BMUs will needed with all the heavier track forces applied that electrification seemed to be trying to avoid / get rid of.

heavier track forces are a relatively minor issue in the scheme of things. But I’d expect Hull to be electrified.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
the IRP (and this thread) explains that there will be 3/4 tracks between the new line merging with the existing line at Marsden and Huddersfield, and a 4 track section fir some of the way from Leeds to Church Fenton.
But some of these costs must be as yet unquantifiable (subject to further work) specifically around Marsden because, as I understand it, there wasn't planned to be a link here between NPR and TRU?
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,320
heavier track forces are a relatively minor issue in the scheme of things. But I’d expect Hull to be electrified.
I don't have the schedule in the IRP to hand, but presumably this wold follow the MML and TRU work as part of Network Rail's schedule?
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
I don't have the schedule in the IRP to hand, but presumably this wold follow the MML and TRU work as part of Network Rail's schedule?
Knowing that Hull's 3 constituencies are fairly solidly red, that seems unlikely with Alexander Boris de Pfeffel in No. 10.
 

WiredUp

Member
Joined
17 May 2021
Messages
97
Location
Bedford
Knowing that Hull's 3 constituencies are fairly solidly red, that seems unlikely with Alexander Boris de Pfeffel in No. 10.
Where did they get to before on the Selby - Hull electrification? I think it was discounted after getting to GRIP 3 (option selection), but was the BCR for it that bad? Or was it a victim of bi-modes?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,854
But some of these costs must be as yet unquantifiable (subject to further work) specifically around Marsden because, as I understand it, there wasn't planned to be a link here between NPR and TRU?

Let’s say that it has been quantified, but does need more work.
 

matacaster

On Moderation
Joined
19 Jan 2013
Messages
1,646
Location
Huddersfield
When hudds to ravensthorpe line is 4-tracked, how will the hudds to Bradford locals be accommodated without eating up paths on main line?
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,770
When hudds to ravensthorpe line is 4-tracked, how will the hudds to Bradford locals be accommodated without eating up paths on main line?
They will be on the slow lines, they are paired by use - the slow lines are on the west/North side
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,263
heavier track forces are a relatively minor issue in the scheme of things. But I’d expect Hull to be electrified.
And TPE have enough 802s for Hull (in the interim) and Scarborough once the main TP electrification works happen.
Getting everything else done or funded helps minimise the scope of works and costs associated with Hull electrification which means it is more likely to get the nod from Treasury at some point in the future.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
When hudds to ravensthorpe line is 4-tracked, how will the hudds to Bradford locals be accommodated without eating up paths on main line?

They will be on the slow lines, they are paired by use - the slow lines are on the west/North side
Indeed any train which joins or leaves the main Manchester-Leeds route, or calls at a station, between Hudds and Dewsbury, will not be able to use the fast lines. The points for such movements will not exist.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,716
Location
Leeds
Indeed any train which joins or leaves the main Manchester-Leeds route, or calls at a station, between Hudds and Dewsbury, will not be able to use the fast lines. The points for such movements will not exist.
I bet they will. If there's an issue with the fast lines, how will you get the fast trains past the problem without using the slow lines? Using the unaffected line in one direction would be possible, but using the slow lines would be better.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I bet they will. If there's an issue with the fast lines, how will you get the fast trains past the problem without using the slow lines? Using the unaffected line in one direction would be possible, but using the slow lines would be better.
If there's an issue with the fast lines, trains will use the slow lines all the way between Huddersfield and Dewsbury.

There are no connections in the plans except at Huddersfield station throat, and at the end of the 4-track section between Ravensthorpe and Dewsbury. Remember the whole stretch is only about 8 miles. I imagine there are several stretches of 4 tracks around the country with no fast-slow crossovers in 8 miles.
 
Last edited:

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,668
If you want to find lost drainage or cables, electrify. The piles are unbelievably good at finding em.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,088
Location
West Yorkshire/Tuscany
There are no connections in the plans except at Huddersfield station throat, and at the end of the 4-track section between Ravensthorpe and Dewsbury. Remember the whole stretch is only about 8 miles. I imagine there are several stretches of 4 tracks around the country with no fast-slow crossovers in 8 miles.
So, would I be correct in assuming that the grade-seperated junctions at Thornhill and Heaton Lodge will only connect the Calder Valley line to the slow lines? If so, how would engineering work or obstruction diversions from the upgraded TP route be organised?
 