The integrated rail plan still leaves it unclear as to exactly what they intend to do, a lot of talk about pinch points and reducing time from York to Manchester so will be interesting to see how they get those speeds up at Church Fenton with the curve south of the station. Many in Church Fenton are still wondering if they will still go ahead with the intended HS2 route to bypass the curve as the current electrification work stops right where the new line would integrate with the current track.
3.100 The rail corridor between Leeds and York is a constraint to boosting capacity and reliability from Leeds to Manchester as well as Leeds to Newcastle (because it is difficult to terminate more trains at Leeds). Previous plans have looked at using the HS2 Eastern Leg Church Fenton link to the East Coast Main Line. However, given the Government’s intended approach to the Eastern Leg set 112 Integrated Rail Plan for the North and Midlands out at paragraph 3.28, it intends to instead seek a scheme capable of being implemented earlier than previous plans, which will improve reliability and resilience, as well as future proofing for NPR.
3.28 Under previous plans for the HS2 Y-network, the Eastern Leg was planned to run from the West Midlands to an East Midlands Hub station at Toton, one of three regeneration sites in the region. Trains would then continue north, serving Chesterfield and Sheffield via a spur to the Midland Main Line (MML), or continue on new high speed line to a new station at Leeds, with a spur to the East Coast Main Line (ECML) to serve York, Darlington, Durham and Newcastle. However, in the light of cost increases, concerns about intermediate markets, development of plans for other schemes and analysis indicating a longer delivery timeframe since the route was confirmed in summer 2017,54 the Government has considered whether similar or better benefits could be obtained in a more affordable way, earlier and allow for an iterative approach to delivery.