Thats an incredibly petty comment to make about NR, the WAG are far from squeaky clean in this one. Look it at this way, as you know, all of this scheme is built on the fact the WAG want their glorified taxi to run via Wrexham and not the great un-washed of Crewe. If Gezza wasnt running the scheme wouldnt have even been dreamt up. The situation has been the same for decades so why hasnt someone done something about it before ??. If Gezza goes to the great train path in the sky, whats the point of doing it ?? The next problem is that if it does get built and Gezza is no longer there, who pays for it ?? will the WAG be chucking NR a few bob to maintain it ??
Good Evening planner.
Of course the WAG are not squeaky clean, they are Politicians, so we mortals play them at their own game, we have a written endorsement from the WAG Govt that funding ending 2011 unused for this project, will be carried over, it was no mean feat to get this in writing.
As far as Gerald is concerned,a few months ago he was doomed, but given an extension of life for another year as a sop, so £1.6M a year for four years can be spent on the light aircraft to fly him to Cardiff.
Anyhow grip 3 for double tracks is ten months behind by Net Rail when we expected the costings to be finalised, ATW also want the double track as the single is a pinch point for timings.
Ieuan The Minister will be gone in four months, as will Gerald in eleven
months,If the double track goes ahead, no doubt NR will as usual be paid by someone as all North/South services will remain via Wrexham.
However, in real life industry, if a costing quote was ten months late,that firm would go bankrupt.
see you