• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Merseyrail Class 777 introduction updates

Status
Not open for further replies.

stuart100100

Member
Joined
13 Dec 2009
Messages
186
Location
Liverpool
I'm talking about Merseytravel having pretty much said that 777s will not generally operate doubled up other than for special events and the likes. Which means in the peak (as Merseyrail commuting is likely to recover more than London commuting, with much of it being blue collar or otherwise requiring physical presence) you'll be playing "cram 'em in" much more than you do now, particularly if they head off on new conquests at the expense of the core network without ordering more units.

The platforms are all 6-car (120m ish), but the Stadler units have been designed specifically to accommodate all doors on those platforms despite the longer train, with the back hanging off, though the starter signals at Southport will need moving and a few other similar tweaks.
One of the Merseytravel staff at Birkenhead North yesterday said to me the ones that currently run as 6 car would be doubled up to 8 cars when I asked
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,593
I just read on Wikipedia that the power output will be 2,800 hp, compared to 880hp for the class 507s (and weight going down as well!). No source is given and that seems like a huge increase, is that correct?
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
I just read on Wikipedia that the power output will be 2,800 hp, compared to 880hp for the class 507s (and weight going down as well!). No source is given and that seems like a huge increase, is that correct?
The Merseytravel website rates in at 2.1MW. I don't know what that is in horsepower though.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,917
Location
Mold, Clwyd
The problem with UK rail, and particularly Merseyrail, is the lack of standardisation dating from how the system was built/managed over 150+ years.
Leasing is fine when stock (like B737s or A320s) are standard issue across hundreds of airlines, so they can flex their fleet sizes and deployment as the business changes.
UK rail is still stuck in a time-warp where a multitude of different standards apply, making many fleets tied to the routes they operate for decades at a time.
So there is much less scope for efficient leasing business models.
But "GBR" is still a long way short of the B737/A320 go-anywhere-almost-at-the-drop-of-a-hat standardisation model.

Merseytravel has bought its new fleet for a 40-year stint, like the 50x being retired (now approaching 45 years).
If they have too many/too few trains, nobody is going to help out.
Last time, BR sent a portion of its Southern fleet to Merseyside to save money - that won't be happening again.
Regional and intercity fleets have rather more standardisation, so can benefit more from efficient leasing deals.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,261
The problem with UK rail, and particularly Merseyrail, is the lack of standardisation dating from how the system was built/managed over 150+ years.
Leasing is fine when stock (like B737s or A320s) are standard issue across hundreds of airlines, so they can flex their fleet sizes and deployment as the business changes.
UK rail is still stuck in a time-warp where a multitude of different standards apply, making many fleets tied to the routes they operate for decades at a time.
So there is much less scope for efficient leasing business models.
But "GBR" is still a long way short of the B737/A320 go-anywhere-almost-at-the-drop-of-a-hat standardisation model.

Merseytravel has bought its new fleet for a 40-year stint, like the 50x being retired (now approaching 45 years).
If they have too many/too few trains, nobody is going to help out.
Last time, BR sent a portion of its Southern fleet to Merseyside to save money - that won't be happening again.
Regional and intercity fleets have rather more standardisation, so can benefit more from efficient leasing deals.
Which shows the pros and cons of bespoke stock versus buying off the shelf

In 30 years time, there won't be a common pool of spares for Merseytravel to dip into either, as the trains start to age
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,238
Which shows the pros and cons of bespoke stock versus buying off the shelf

In 30 years time, there won't be a common pool of spares for Merseytravel to dip into either, as the trains start to age
They best had, as they have a 35 year design life!
 
Joined
10 Jan 2018
Messages
376
Just saw that on the Railway Centre website's POD, the destination mentioned IPEMU.
Is that really true that Class 777 are IPEMU, allowing an ability to run off juice?
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,238
Just saw that on the Railway Centre website's POD, the destination mentioned IPEMU.
Is that really true that Class 777 are IPEMU, allowing an ability to run off juice?
Yep, some of the units will be fitted with batteries to enable them to run to the planned Headbolt Lane extension (which will be built without 3rd rail) with further aspirations to fit more units with batteries to enable similar short extensions.
 

dgl

Established Member
Joined
5 Oct 2014
Messages
3,058
The bits that make it go and the internal fixtures and fittings will be standard stuff used in other Stadler products, I would guess, with only the bodyshell and interior layout being non-standard, which won't matter one bit.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,379
Location
"Marston Vale mafia"
The bits that make it go and the internal fixtures and fittings will be standard stuff used in other Stadler products, I would guess, with only the bodyshell and interior layout being non-standard, which won't matter one bit.

Indeed. Short production runs of very custom units using modular components are how Stadler started out - their initial niche was Swiss narrow gauge lines.
 

Gareth

Established Member
Joined
10 Mar 2011
Messages
1,505
I still think some people on here are sad Merseyrail didn't just go for clapped out 331s.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,174
Location
Huyton
The bits that make it go and the internal fixtures and fittings will be standard stuff used in other Stadler products, I would guess, with only the bodyshell and interior layout being non-standard, which won't matter one bit.

Are the bits that make it go even manufactured by Stadler, or are they from a third party such as Traktionssysteme Austria?
 

D821

Member
Joined
1 Sep 2021
Messages
628
Location
The Wirral
Just saw that on the Railway Centre website's POD, the destination mentioned IPEMU.
Is that really true that Class 777 are IPEMU, allowing an ability to run off juice?
All of the units will be capable of moving short distances under their own battery power. I think it is to allow them to move around depots and sidings without the risks to staff from third rails:

 

Phillipimo

Member
Joined
5 Jan 2013
Messages
237
Location
Portsmouth
One of the Merseytravel staff at Birkenhead North yesterday said to me the ones that currently run as 6 car would be doubled up to 8 cars when I asked
Wikipedia states that 53 class 777s will replace 57 507/508s currently working. With better utilisation I don't think any shortened services would be expected.
I'm sure someone knows how many units are needed for the service, it's probably been discussed in this thread before!
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
Wikipedia states that 53 class 777s will replace 57 507/508s currently working. With better utilisation I don't think any shortened services would be expected.
I'm sure someone knows how many units are needed for the service, it's probably been discussed in this thread before!
Wikipedia has always been slightly off on this. In reality, 52 Class 777s will replace 59 Class 507/508s. Of these, 508110 and 508134 have been scrapped and 507006 has been written off, leaving a current fleet size of 56. The 777s, once fully introduced, should reduce the number of diagrams with improved acceleration and braking reducing the layover at termini and improved availability reduces the number of spare units required. There are now 53 units, because the unelectrified Headbolt Lane extension increases the number of Kirkby diagrams from 3 to 4. David Powell has decided that 7 of these will be IPEMUs equipped with traction batteries.
 

adrock1976

Established Member
Joined
10 Dec 2013
Messages
4,450
Location
What's it called? It's called Cumbernauld
Wikipedia has always been slightly off on this. In reality, 52 Class 777s will replace 59 Class 507/508s. Of these, 508110 and 508134 have been scrapped and 507006 has been written off, leaving a current fleet size of 56. The 777s, once fully introduced, should reduce the number of diagrams with improved acceleration and braking reducing the layover at termini and improved availability reduces the number of spare units required. There are now 53 units, because the unelectrified Headbolt Lane extension increases the number of Kirkby diagrams from 3 to 4. David Powell has decided that 7 of these will be IPEMUs equipped with traction batteries.

I did work out the maths a long time ago and for the standard 15 minute frequency pattern services both sides of the Mersey, I got it to 18 each assuming single formations.

My workings out were:

5 x West Kirby
4 x New Brighton
3 x Ellesmere Port (every 30 minutes. Additional 3 for morning and evening when every 15 minutes)
6 x Chester

10 x Southport - Hunts Cross
3 x Kirkby - Liverpool Central
5 x Ormskirk - Liverpool Central

Have the above remained broadly the same since?

This would still leave 16 777s to play with (assuming no doubled workings). As 7 will be battery, this could mean that Merseyrail could run beyond Kirkby to Wigan Wallgate every 30 minutes, which would mean 5 of the 7 battery 777s, with 2 spare for maintenance/breakdown cover.
 

K.o.R

Member
Joined
6 Dec 2017
Messages
673
The batteries can be fitted to any of the 53 units, so in effect any of the units can carry batteries.

An exercise to remove batteries from a 777 and refit them has already been conducted at Kirkdale depot.

Headbolt Lane is scheduled to open in 2023, so I would imagine things hopefully will have moved on by then.

Are the batteries fitted to the main train somewhere, or are they in a central pod like the diesels on the GA units?
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,835
Location
Nowhere Heath
I know how wide they are as I've sat on them in the mock-up :) They aren't wide enough for two average males to sit together without one sticking out into the aisle.

It is shoulder width that is the issue, not squab width. Just as the seat bases in 350/1s and 350/2s are identical, but the extra shoulder space by spacing them out is important.

Just curious, what size is an average male? The majority of the men I know are all fairly slim.
 

Ribbleman

Member
Joined
12 Jun 2019
Messages
328
Are the batteries fitted to the main train somewhere, or are they in a central pod like the diesels on the GA units?
The batteries are fitted to the underfloor of the driving cars.

== Doublepost prevention - post automatically merged: ==

I did work out the maths a long time ago and for the standard 15 minute frequency pattern services both sides of the Mersey, I got it to 18 each assuming single formations.

My workings out were:

5 x West Kirby
4 x New Brighton
3 x Ellesmere Port (every 30 minutes. Additional 3 for morning and evening when every 15 minutes)
6 x Chester

10 x Southport - Hunts Cross
3 x Kirkby - Liverpool Central
5 x Ormskirk - Liverpool Central

Have the above remained broadly the same since?

This would still leave 16 777s to play with (assuming no doubled workings). As 7 will be battery, this could mean that Merseyrail could run beyond Kirkby to Wigan Wallgate every 30 minutes, which would mean 5 of the 7 battery 777s, with 2 spare for maintenance/breakdown cover.
I think that your maths on unit utilisation is about right. It’s unlikely that the first extension after Headbolt Lane will be to Wigan. The design of the new station would require modification to allow through running. Short sighted, I know, but presumably all that could be afforded at present, given that Network Rail have said that any further extension towards Wigan will require track alterations and total resignalling, no doubt at eye watering cost, though that work would be incorporated in the scheme to build a branch to Skelmersdale, should that ever be authorised.

Local whispers and media talk suggests that the Wrexham line may well be the next to benefit from battery operation with the WAG very keen on through trains to Liverpool. Shorter block sections are badly needed on this line to provide the resilience required for reliable operation of the planned 2 trains per hour from December, whether it be Class 230 or still with Class 150. Some form of recharging will be needed en route for 777s to eventually take over but as previously discussed, that is seen as a readily solvable issue.
 
Last edited:

wobman

Established Member
Joined
2 Jan 2011
Messages
1,233
The batteries are fitted to the underfloor of the driving cars.

== Doublepost prevention - post automatically merged: ==


I think that your maths on unit utilisation is about right. It’s unlikely that the first extension after Headbolt Lane will be to Wigan. The design of the new station would require modification to allow through running. Short sighted, I know, but presumably all that could be afforded at present, given that Network Rail have said that any further extension towards Wigan will require track alterations and total resignalling, no doubt at eye watering cost, though that work would be incorporated in the scheme to build a branch to Skelmersdale, should that ever be authorised.

Local whispers and media talk suggests that the Wrexham line may well be the next to benefit from battery operation with the WAG very keen on through trains to Liverpool. Shorter block sections are badly needed on this line to provide the resilience required for reliable operation of the planned 2 trains per hour from December, whether it be Class 230 or still with Class 150. Some form of recharging will be needed en route for 777s to eventually take over but as previously discussed, that is seen as a readily solvable issue.
It's politicians trying to get votes and good press in the media with all of these stories, merseyrail haven't even got the 777's in service yet and will still require a legacy fleet running in parts of their network once the 777's do get into service.

Stadler ran 1 battery 777 in a short trial and everyone goes crazy, a lot more testing will be required before we see them on any routes. The Wrexham to Bidston line needs big investment there's still big sections of jointed track and the signalling is inadequate. Never mind the stations that need extending and need investment to bring up to standard. Then there's all the barrow crossings that the line......
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,238
Local whispers and media talk suggests that the Wrexham line may well be the next to benefit from battery operation with the WAG very keen on through trains to Liverpool. Shorter block sections are badly needed on this line to provide the resilience required for reliable operation of the planned 2 trains per hour from December, whether it be Class 230 or still with Class 150. Some form of recharging will be needed en route for 777s to eventually take over but as previously discussed, that is seen as a readily solvable issue.

I agree, it's most likely the Wrexham line will be next. It has a good business case as it requires little work to get some form of service running. Though running directly into Liverpool for a non Merseyrail toc would be a challenge, not least given TFW dont have anything capable of running on 3rd rail. Not an insurmountable problem though. Which makes me wonder if Merseytravel could purchase more battery 777s and then lease them to TFW to run, or run it on their behalf.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
All this talk of service extensions makes me wonder: How many of these new routes would have OHLE on them?
 

Fawkes Cat

Established Member
Joined
8 May 2017
Messages
5,283
All this talk of service extensions makes me wonder: How many of these new routes would have OHLE on them?
In significant quantity, or at all?

I think that neither Wrexham or Wigan Wallgate have any OHLE. Neither would going to Burscough (whether from Ormskirk or Southport) but an extension to Preston would presumably have some on the way into Preston station: Warrington Central wouldn’t but there would be some if running through to Oxford Road.

I am of course happy to be corrected if this is garbage.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
In significant quantity, or at all?

I think that neither Wrexham or Wigan Wallgate have any OHLE. Neither would going to Burscough (whether from Ormskirk or Southport) but an extension to Preston would presumably have some on the way into Preston station: Warrington Central wouldn’t but there would be some if running through to Oxford Road.

I am of course happy to be corrected if this is garbage.
Well I was just hoping maybe for the longer routes they could expand any existing OHLE as the 777s can operate that way, giving them much greater range than the batteries. Preston for example sounds like a good candidate for that.
 
Status
Not open for further replies.

Top