Hertford East platform extension work finally starting? (needs old signal box removal)I notice that there is an 8 day blockade between Broxbourne and Hertford East due to "demolition work" but couldn't find any further details. Does anyone know more about this?
That was my initial thought, makes me think perhaps there is something else being demolished. A road bridge somewhere?Would they be doing the other stations en route also? Otherwise surely could terminate at Ware instead
I live not far from that line can’t think of a bridge apart from the main road into Ware which is over the station and I guess preventing lengthening the platform at the eastern end of station. I’ll see if I can find outThat was my initial thought, makes me think perhaps there is something else being demolished. A road bridge somewhere?
Moving one of the signals at Ware would also make sense?I live not far from that line can’t think of a bridge apart from the main road into Ware which is over the station and I guess preventing lengthening the platform at the eastern end of station. I’ll see if I can find out
edit. does seem its for signal box, but now want permission to work 24 hours a day. Still can’t see why trains can’t terminate at Ware. Surely they can turn off the juice just in Hertford area.
Would they be doing the other stations en route also? Otherwise surely could terminate at Ware instead
Why move a great Eastern signal box all the way up to Yorkshire? Surely one of the heritage lines in East Anglia could at least store it on their site until such time a decent place could be found for it?
Would there be a need for loads of RRBs if the line was just closed between Ware and Hertford? Not sure how many people commute from Hertford East but they do have North as an alternative. Whereas Ware, St Margaret's and Rye House don't have alternatives.I wonder if the fact Ware is only a single platform station is the reason - so the decision has been made to prevent overcrowding ? It's also not great for a load of RRBs. Whereas Broxbourne has 4 platforms so is more spacious and has space for RRBs.
I suspect there are more than enough redundant boxes in East Anglia enough to keep them happy already - but relatively few in the NE.If one of the lines in East Anglia had been interested, I suspect it would have moved to them.
if I recall, this is the one getting rid of the signal box but the platform extensions will happen laterjust re-upping this one. anyone know what work will be done next week, and when all the work needed for 10car 720s to go to Hert East will be completed?

I live nearby as well,It will be interesting to see how they do this . Access to the site is a bit restricted there are trees and undergrowth behind the box that my need to be cleared first so that a lorry mounted crane can get near enough to lift the lever frame out along with the heavy timbers on to a flat back lorry or may be an artic but the road behind the box is fairly wide. On the other side the road and streets are narrow and lifting stuff over the overhead wires would require a big crane . I live about 7 miles away so I will be there watching it all as it happens I hope.