Why is high speed rail in the UK so expensive to construct?

Status
Not open for further replies.

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,374
Why would Londoners do that when, for a fraction if the fare and time they can visit multitude of nearer seaside resorts?
Because they consider the nearer seaside resorts to be inferior?

There is a reason Londoners go places other than Southend after all.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
There is a reason Londoners go places other than Southend after all.

And indeed they do that already. It doesn't need a high speed line to Cornwall.

(Incidentally, HS2 will bring "nice" seaside resorts like Southport or Scarborough much closer to London than they are today)
 

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,058
Location
UK
Maybe high speed rail is expensive because of demands for a one size fits all solution. The Channel Tunnel to London to Birmingham and towards Scotland have far greater demands for both speed and capacity. London to Cardiff has some demand, and that was the main target of the electrification (and the speed upgrades? I don't know how much they were tied together). I can see the good in electrifying and raising speeds from Bristol to Exeter. Can what happened between Reading and Bristol Parkway be repeated from there to Exeter?
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,044
Assume a terminus in the vicinity of Camborne [reasonably central for many of the popular destinations], and routing via Bristol - I make it roughly ~401km or so to OOC.

With non stop operation average speeds of around 300km/h are probably achievable.

Which would be about ~80 minutes.

A train stopping every ~30km or so could probably achieve about 170km/h average, for about 2hr20

Not wanting to go too far off thread, but I've suggested elsewhere that an Eastern HS line (serving Cambridge and northwards) starting at it's own London terminus which is then linked to Stratford and OOC and onwards to the west country via another HS line would give us a good base network.

The line to the west country could go to Salisbury with a spur to Southampton and westwards with services towards Bristol/South Wales and to Devon and Cornwall.

Although how far west of Exeter or Plymouth any new line reaches would be open for debate as the population of Cornwall is not quite 600,000 and spread over quite a large area (the top 5 towns don't even total 150,000).
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
Although how far west of Exeter or Plymouth any new line reaches would be open for debate as the population of Cornwall is not quite 600,000 and spread over quite a large area (the top 5 towns don't even total 150,000).

HS rail into Cornwall seems like something to be saved for when the nation has nothing much else to spend it on - just the equivalent to the north half of the current WCML ( to pick something else that refuses to go in straight lines ) would be a significant upgrade west of Exeter. I am genuinely wondering how much a new route of 200kmh ( or slightly quicker ) would cost to build & maintain relative to HSR spec; we don't *have* to build everything to run at 400kmh, & you gain in modern station design too.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,044
HS rail into Cornwall seems like something to be saved for when the nation has nothing much else to spend it on - just the equivalent to the north half of the current WCML ( to pick something else that refuses to go in straight lines ) would be a significant upgrade west of Exeter. I am genuinely wondering how much a new route of 200kmh ( or slightly quicker ) would cost to build & maintain relative to HSR spec; we don't *have* to build everything to run at 400kmh, & you gain in modern station design too.

I'd like to see improvements, however I would expect that the Dawlish Avoiding Line (DAL) at a cost of over £1bn would likely be all we could expect any time "soon", however that really only comes into its own if there's capacity to run more services from London, otherwise it would be fairly lightly used.

It's why I've suggested in the past that if we're going to spend that kind of money we'd probably be better off using the extra paths from Waterloo created by Crossrail 2 and upgrading the WofE line through Salisbury and reopening the Okehampron route as it would likely have a better BCR.

As whilst few would travel from London to Plymouth (although depending on the departure time it could be "faster" than waiting for the next service from Paddington depending on where you are starting from, it also has the potential to be more frequent and cheaper, which could also see some opt for it over the express services by GWR) it would likely reduce the need to travel via Reading for many in the SWR area, freeing up some capacity on the GWR services.

If there was an equally easy way to increase capacity in the GWR route that would likely be a better option, however as things stand there's not and so (regardless of what went before) I think that's the better option.

On the speed costs, generally once you go above 115mph the cost difference between 125mph and anything beyond 140mph is fairly limited, as I understand it. In the same way that the cost difference between a 60mph road and a 30mph road is mostly due to the (typical) extra lorry content of the higher speed road and so the overall cost increases are limited.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,965
There’s not going to be a Dawlish avoiding line, and any paths freed up by Crossrail 2 - if it ever happens - will go to find the best benefit, which will be Guildford / Portsmouth / Southampton / Basingstoke / Alton / Salisbury.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,044
There’s not going to be a Dawlish avoiding line, and any paths freed up by Crossrail 2 - if it ever happens - will go to find the best benefit, which will be Guildford / Portsmouth / Southampton / Basingstoke / Alton / Salisbury.

Indeed, the point I was making was that with an extension of the Salisbury services to Plymouth would likely be a better use of resources if we wished to improve connections to the West Country.
 

Brush 4

Member
Joined
25 Nov 2018
Messages
717
Only those in the European rail industry will know why there projects are done for less cost and, faster than the UK. I'd like to see their methodology though.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Only those in the European rail industry will know why there projects are done for less cost and, faster than the UK. I'd like to see their methodology though.
Are the German and Alpine projects much cheaper and quicker?
have read a few things about them going over budget, being late, and the planning troubles they have because they go through populated areas with noise concerns.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Are the German and Alpine projects much cheaper and quicker?
have read a few things about them going over budget, being late, and the planning troubles they have because they go through populated areas with noise concerns.

Example: In Germany the Efurt-Leipzig/Halle took 24 years from initial planning starting (1991) to opening (2015). Pretty comparable to HS2's timescales.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,965
Only those in the European rail industry will know why there projects are done for less cost and, faster than the UK. I'd like to see their methodology though.

Example: In Germany the Efurt-Leipzig/Halle took 24 years from initial planning starting (1991) to opening (2015). Pretty comparable to HS2's timescales.

Example 2: LGV SEA (Tours to Bordeaux). Initial studies 1992. ‘Public Debate’ (equivalent to our Parliamentary / TWAO process) 1995-1998. Opened 2017. This is for a line that is entirely in open country, no stations, no tunnels, and practically no neighbours.

Example 3: LGV Bordeaux - Toulouse. Initial studies late 90s. Public inquiry concluded 2005. Compulsory Purchase powers granted 2008. Construction might start in 3 years time, and it could be open in 2030. Again this is largely through open country, albeit a couple of (simple) stations will be built on this one.
 
Last edited:

gallafent

Member
Joined
23 Dec 2010
Messages
551
Example 3: LGV Bordeaux Tours.
Bordeaux Toulouse?

I thought I remembered reading that that one had really been kicked into the long grass now (unfortunately!), with a line to Irun (or maybe somewhere else, but anyway, essentially to the Spanish border) being preferred, to link with the Spanish high speed network (and in particular Barcelona) … but I might be misremembering! Wikipedia seems to think that Toulouse and Spanish Border lines both still in prospect, late this decade or early next. … but yes, quite slow indeed …
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
Indeed, the point I was making was that with an extension of the Salisbury services to Plymouth would likely be a better use of resources if we wished to improve connections to the West Country.

Perhaps - with Plymouth aiming to grow by 50% ( and Exeter double in size, although it's at least better connected ) then it might get a bit difficult. I'm nowhere near Plymouth so I'm not in any better position to find out how they're going to move all these people around than anyone else is, but I'll at least try & see what their transport plan is... hopefully a bit more than just some optimism.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,965
Bordeaux Toulouse?

Yes, my mega-typo, corrected.

== Doublepost prevention - post automatically merged: ==

I thought I remembered reading that that one had really been kicked into the long grass now (unfortunately!), with a line to Irun (or maybe somewhere else, but anyway, essentially to the Spanish border) being preferred, to link with the Spanish high speed network (and in particular Barcelona) … but I might be misremembering! Wikipedia seems to think that Toulouse and Spanish Border lines both still in prospect, late this decade or early next. … but yes, quite slow indeed …

There was much local angst - I drove between the two 11 years ago and there were “LGV - NON!” signs everywhere. It took another round of ‘local discussion’ (after the decisions had been taken), and various arguments about funding before it got the nod.

The branch to Dax was approved in 2016. But no funding agreement yet, so unlikely to be in service before the mid 2030s. And as high speed lines go, it’s just about as easy as they get.

Beyond Dax is a separate project; this section is proposed to be 220km/h and mixed use with freight. That’s further behind still.
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,946
Location
Mold, Clwyd
Bordeaux Toulouse?

I thought I remembered reading that that one had really been kicked into the long grass now (unfortunately!), with a line to Irun (or maybe somewhere else, but anyway, essentially to the Spanish border) being preferred, to link with the Spanish high speed network (and in particular Barcelona) … but I might be misremembering! Wikipedia seems to think that Toulouse and Spanish Border lines both still in prospect, late this decade or early next. … but yes, quite slow indeed …
Montpellier-Perpignan is now back on the agenda after being put out to grass for years.
There is of course already a cross-border HSL from Perpignan through the Pyrenees, which joins up with the Spanish HSL to Barcelona/Madrid at Figueres.

The Hendaye LGV if/when built will split off the Bordeaux-Toulouse LGV, with a Spanish HSL (or upgraded dual-gauge classic line) also reaching the border at Irun.
One day Paris-Madrid with be high-speed either way, with the western route being probably faster by then.
 

Brush 4

Member
Joined
25 Nov 2018
Messages
717
LineSpeedLengthConstruction beganConstruction completed or
expected start of revenue services
LGV Sud-Est270 km/h, then 300 km/h409 km19761983
LGV Atlantique300 km/h279 km19851990
LGV Rhone-Alpes300 km/h115 km19891994
LGV Nord300 km/h333 km19891996
LGV Interconnexion Est270 km/h57 km19901996
LGV Méditerrannée320 km/h250 km19962001
LGV Est Européen320 km/h406 km20022016
LGV Perpignan-Barcelona300 km/h45 km20042012
LGV Rhin-Rhone320 km/h138 km20062011
LGV Sud Europe Atlantique320 km/h302 km20122017
LGV Bretagne-Pays de la Loire320 km/h182 km20122017
LGV Nîmes-Montpellier220 km/h80 km20132018
LGV Bordeaux-Toulouse320 km/h222 kmUnknown~ 2025
LGV Bordeaux-Espagne320 km/h251 kmUnknown~ 2032
LGV Montpellier-PerpignanUnknown150 kmUnknownUnknown
Lyon-Turin300 km/h272 km20072030

This chart outlines the Euro network development. Generally 5-6 years construction phase, with a few a bit longer.​

 

miami

Established Member
Joined
3 Oct 2015
Messages
3,305
So Lyon-Turin, 272km, has an estimated cost of £21b - £77m per km. Excluding the tunnel it's £14b for 215km, or £65m per km.

At 65m per km That would put HS2's estimated cost at £35b.

However the HS2 estimated price includes major new stations and remodelling (including city centre), extensive tunnelling in cities, and rolling stock. How much would HS2 be without that?
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,774
Phase 2a is open countryside with no major city centre works, its still well north of £120m per mile
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,965
LineSpeedLengthConstruction beganConstruction completed or
expected start of revenue services
LGV Sud-Est270 km/h, then 300 km/h409 km19761983
LGV Atlantique300 km/h279 km19851990
LGV Rhone-Alpes300 km/h115 km19891994
LGV Nord300 km/h333 km19891996
LGV Interconnexion Est270 km/h57 km19901996
LGV Méditerrannée320 km/h250 km19962001
LGV Est Européen320 km/h406 km20022016
LGV Perpignan-Barcelona300 km/h45 km20042012
LGV Rhin-Rhone320 km/h138 km20062011
LGV Sud Europe Atlantique320 km/h302 km20122017
LGV Bretagne-Pays de la Loire320 km/h182 km20122017
LGV Nîmes-Montpellier220 km/h80 km20132018
LGV Bordeaux-Toulouse320 km/h222 kmUnknown~ 2025
LGV Bordeaux-Espagne320 km/h251 kmUnknown~ 2032
LGV Montpellier-PerpignanUnknown150 kmUnknownUnknown
Lyon-Turin300 km/h272 km20072030

This chart outlines the Euro network development. Generally 5-6 years construction phase, with a few a bit longer.​


Bordeaux - Toulouse is slated to start construction in 2024, in service 2030.

How much would HS2 be without that?

Very much cheaper. Euston alone is something like £8bn.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,739
Phase 2a is open countryside with no major city centre works, its still well north of £120m per mile
Crewe South is a serious bit of remodeling. Is it £120m per mile? Phase 2a is 36 miles or 58km. The costs are in the £4 - 4.5 billion range according to Construction News. That equates to £69m per Km at 4 billion or £77m per Km at 4.5 billion, not a lot of difference between Lyon to Turin if my maths is correct.
 

miami

Established Member
Joined
3 Oct 2015
Messages
3,305
Phase 2a is open countryside with no major city centre works, its still well north of £120m per mile

So £75m per km. Sure that's more than the non-Mont d'Ambin part, but not an extreme amount more. Does that include Crewe remodelling too?

It's also designed for 220kph operation, not even 250, let alone 330/360 of HS2. On the other hand it includes a parallel freight line for much of the length.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,965

== Doublepost prevention - post automatically merged: ==

Phase 2a is open countryside with no major city centre works, its still well north of £120m per mile

The last few km into Crewe will be in the region of £1bn alone.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,470
Location
Somerset
Example: In Germany the Efurt-Leipzig/Halle took 24 years from initial planning starting (1991) to opening (2015). Pretty comparable to HS2's timescales.
And that was with a political impetus behind “ reunification projects” that puts the “ levelling up agenda” ( if there is such a thing) in the shade.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,739
So £75m per km. Sure that's more than the non-Mont d'Ambin part, but not an extreme amount more. Does that include Crewe remodelling too?

It's also designed for 220kph operation, not even 250, let alone 330/360 of HS2. On the other hand it includes a parallel freight line for much of the length.
Crewe itself is technically nothing to do with HS2, that is a NR scheme. 2A ends where it dumps itself at Basford Hall.
 

camflyer

Member
Joined
13 Feb 2018
Messages
1,171
Skegness is one town. Like Brighton, or Bournemouth, or Blackpool.

Cornwall is a county, with dozens of holiday towns. Bude, Padstow, Newquay, Perranporth, St Ives, Porthleven, Falmouth, St Austell, Mevagissey, Looe, and more. Which part of Cornwall would your line serve for these day trippers?

and Hove actually.
 

miami

Established Member
Joined
3 Oct 2015
Messages
3,305

HS2 chief executive Mark Thurston said the Department of Transport has ordered him to halt work on the Leeds leg.

"At the moment, we are only working on Phase 2b West (Crewe to Manchester)," he said. "We are only focused on that."

There was also an admission from West Midlands Mayor Andy Street that the Leeds leg could be hit by "a serious delay".

The revelations in the House of Commons inquiry come after previous reassurances from government that Leeds will see the benefits of HS2.


I guess the cost is a concern
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Skegness is one town. Like Brighton, or Bournemouth, or Blackpool.
Not really Skegness has a population of 19k, the Brighton/Worthing/Littlehampton conurbation is the 12th largest in the UK with a population of 485k..
 