I see what you did there.a boring journey
I see what you did there.a boring journey
No. For example, heading east from St Pancras the first HS1 intervention shaft is where the Canonbury curve meets the NLL.The number of full scale fire fighting/evacuation chambers would be interesting. Does HS1 go from Stratford to Dagenham without one?
Also HS2 is intended to allow for speeds of up to 400km/h, despite literally nobody else designing for speeds greater than 350km/h due to the significant increase in costs (both for construction and maintenance) that comes with the increased speed.
Another difference between the UK and other countries is how costs are accounted for. Other countries conveniently hide costs elsewhere on the balance sheet.
I'm more than willing to eat my hat in twenty years time!
It would be one hell of a boring journey for passengers!
Improves access to the North through Birmingham New St - this will also make it easier for tourists to visit by rail, so may help reduce congestion on roads or increase visitor numbers.I'd love to know - how does HS2 benefit the people of Devon & Cornwall?![]()
I don't know how much of a difference 300 vs 360kph makes in regards to that. I have done some work with standing waves, so I'm aware they have specific frequencies, but this seems like something that could be overcome by using different types of sleepers. I'd assume whatever is going on would likely be to do with ground conditions in general, rather than a 60kph increase in speed. Unless you have an article for this, in which I probably won't eat my hat, but maybe chew one of the corners a bitTunnels in the 'country' sections are having to built with larger diameters due to the specified speed.
The project has also had to consider some pretty extraordinary measures for the earthworks to avoid the train speed approaching the ground surface wave velocity - which would create a kind a sonic boom effect in the soil. This particularly affects the route through the south Midlands where it passes over high plasticity clays. I don't know how this has been overcome but there was talk about excavating several metres of ground and replacing with a stiffer granular material, which would be a huge expense. Running at 300kph could eliminate the problem.
Then there are the tunnel approaches, where the excavation of large cuttings produces long term upward movement of the ground under the tracks. Over time this would cause problems with the vertical alignment as the track along the approach moves upwards but the tunnel doesn't move. Coupled with HS2's desire to minimise maintenance issues, this means doing some major ground improvement works to address the issue.
All these issues mean we end up doing lots of specialist civil engineering which costs a lot more.
I can't say whether these issues exceed the additional costs of silly contract strategies and failing to give confidence to the supply chain.
The speed of a surface wave (known as a Rayleigh wave) along the ground is simply a property of the ground and nothing to do with the track. Once the train exceeds around 70% of Rayleigh wave velocity the vibrations experienced by the trains and track will increase, and by several-fold if the train speed equals the Rayleigh wave velocity. This could have serious effects on the track components and could be a safety issue. The solutions are:I don't know how much of a difference 300 vs 360kph makes in regards to that. I have done some work with standing waves, so I'm aware they have specific frequencies, but this seems like something that could be overcome by using different types of sleepers. I'd assume whatever is going on would likely be to do with ground conditions in general, rather than a 60kph increase in speed. Unless you have an article for this, in which I probably won't eat my hat, but maybe chew one of the corners a bit
I think looking to minimise long term maintainence costs with some extra upfront capital cost is a good idea. It's much cheaper and less disruptive to do things before a line is in operation, especially as it will be so intensively used. Higher speeds may make it more susceptible to ground movement, but again, the difference between 300 and 360kph seems relatively small for increasing capital expense.
TLDR - I'm sure 360kph does increase capital costs somewhat, but planners looked at the best balance between cost/top speed before settling on this figure, so I'd assume the gains below that are marginal.
I don't personally think it will. It serves the Wilmslow & Airport market, but is just closer to the Airport this time.Manchester Airport HS2 station might be in the same category.
I feel like Stockport will still do a better job at that than Manchester Interchange.Wouldn't have thought so - it'll supplant the "M60 Parkway" role that Stockport currently provides.
Last time I looked, HS2 was going to use slab track in tunnels, and ballasted track in the open.I was under the impression that the issues with running a high speed were mostly around the resultant movement with ballasted track. Which is why HS2 has chosen to use slab track instead which doesn't have those issues.
Oxford will have reasonable connections via XC to HS2 northbound at Birmingham Interchange, too, though how easy the transfer is from International rather depends on the mooted "Automated People Mover".There's a logic to a north Oxfordshire parkway type station, but the impact is massive for relatively small benefit. Especially as Oxford and Bicester both have good connections to London and Birmingham, and will have good connections to the WCML Classic once EWR opens.
Others have mentioned the connections from Old Oak (and Birmingham) that will speed up some journeys, and add an awful lot of capacity to others, and the increased capacity in Birmingham New Street some of which may well be used for links to the South West. I think its also reasonable to say that no-one in Devon or Cornwall would think that we would have priority over the North for the next high speed line, but we do have a reasonable case for being the recipients of HS3 or HS4, so building HS2 moves us up the pecking order - if it is a massive success, then there will be a lot more push for building high speed connections to other corners of the land, including ours! Finally, whilst it might not be in the plans at present, I do think that eventually there will be a connection built from Curzon Street to the Cross Country line, which would most certainly benefit Devon and Cornwall, making a massive difference on journey times on Cross Country journeys.I'd love to know - how does HS2 benefit the people of Devon & Cornwall?![]()
Last time I looked, HS2 was going to use slab track in tunnels, and ballasted track in the open.
And traffic which currently uses Wilmslow (and possibly Macclesfield to a degree).Wouldn't have thought so - it'll supplant the "M60 Parkway" role that Stockport currently provides.
Speaking of which, here's the latest planOxford will have reasonable connections via XC to HS2 northbound at Birmingham Interchange, too, though how easy the transfer is from International rather depends on the mooted "Automated People Mover".
Something like only 20% of the journey time between Euston and Birmingham will have a ‘view’ from the window. Tunnels, cuttings, and sound barriers will be the other 80%.
.
I feel like Stockport will still do a better job at that than Manchester Interchange.
Seems surprisingly low. While I strongly support a tunnel under the Chilterns to protect the Chilterns AONB, most of the route north of Aylesbury AFAIK is through fairly flat and sparsely-populated country, and not in a notably scenic area (though pleasant enough). I'd have thought north of the Chilterns they could get away with an 'open' line of the sort common on TGV routes in France (for instance if you do Paris Lyon or Paris Marseille you can see the scenery most of the time, apart from tunnels).
On the other hand some German lines have notably low stretches of seeing scenery. Karlsruhe-Stuttgart is a good example. But the Cologne-Frankfurt seems to have good views for much of the way, despite being in hilly terrain (topographically equivalent to, but less wild than, the Peak or Dartmoor for instance).
Improves access to the North through Birmingham New St - this will also make it easier for tourists to visit by rail, so may help reduce congestion on roads or increase visitor numbers.
Weren't HS2 Ltd looking at ballasted track in open sections as one of the possible cost-reduction options prompted by the Okervee review?Phase 1 is all slab, and has been for as long as I can remember.
Weren't HS2 Ltd looking at ballasted track in open sections as one of the possible cost-reduction options prompted by the Okervee review?
Presumably they decided not to change the spec.
Paris - Marseille is around 410miles (660km) and that takes just over 3 hrs at 300kph max and seems to have cornered the market.
I would like to see what the cost projections are for 300, 350, and 400 kph. I personally dont think HS2 will ever strech far enough to make 400kph a necessity. To be honest 300kph would probably deliver what we need, Paris - Marseille is around 410miles (660km) and that takes just over 3 hrs at 300kph max and seems to have cornered the market. I cant see us ever having a 400 mile HS2+ route where 400kph would deliver some benefit, and in any case 300kph would be good enough even at this distance. China are looking at higher speeds, but their distances are much greater, their longest routes are currently well over 1000 miles.
It seems to me we have gone for a 'Rolls Royce' solution which has just added to costs in an already 'high cost' environment. Others have identified the causes of the high costs, but unless we can control them we will never get the infrastructure we need.
I have to say I was suprised at the route chosen, seemed to be less than optimal, but thats history now.
the LGV Méditerranée (2001) is a 320kph line.
When you say ‘cornered the market’, there are almost as many flights between Paris and Marseille as trains each day. Acknowledging that the trains have higher capacity.
Re the cost difference between 330/350/400 km/h - there’s little difference.
When we went down to the south by train in 2019 we didnt exceed 300kph at any point, we were on a double decker TGV from Lille, I know LGV Est trains reach 320kph in places, do any trains on LGV Mediterranee exceed 300kph in normal service?Pedantically, that's not entirely correct. Although the LGV Sud-Est (1981) and the LGV Rhône-Alpes (1994) are 300kph, the LGV Méditerranée (2001) is a 320kph line.
On the topic of LGV, does anyone know the recent (2018, 2019) frequency of TGVs on the Paris-Lyon stretch? Just wondering if that would be equivalent in terms of traffic to HS2.
I know there was an hourly to Lyon, but further-away destinations (of which there were many, as far afield as Milan and Barcelona) had less-frequent services.
An aside, but I'm surprised it's as little as 410 miles from Paris to Marseille, basically the same distance as London to Glasgow. I would have guessed over 500.
On the topic of LGV, does anyone know the recent (2018, 2019) frequency of TGVs on the Paris-Lyon stretch? Just wondering if that would be equivalent in terms of traffic to HS2.