Manchester Airport HS2 station might be in the same category.
Wouldn't have thought so - it'll supplant the "M60 Parkway" role that Stockport currently provides.
.
Manchester Airport HS2 station might be in the same category.
SNCF were bounced into building a number of new TGV stations, mostly very basic ones in the middle of nowhere, to satisfy the locals who were being by-passed.
They get say 2-3 services a day, are poor economic performers, eat up capacity and decrease the value of the new line to long-distance passengers.
Ebbsfleet and Ashford (Eurostar) aren't quite in that category, but they are not stellar performers on HS1.
Manchester Airport HS2 station might be in the same category.
Would a "Chiltern Parkway" have made any difference to the opposition to HS2?
The other interesting location would be where HS2 crosses EWR at Calvert.
The government might be persuaded to build a Milton Keynes-sized town at the junction, which would equally appall Bucks residents.
A Chiltern station would be similar to the French "Gares des Bettraves" in many ways, but on an even busier line than Paris-Lyon. Basically every train that stops will need a second empty path to accelerate back into, unless about every third train stops in which case the departing train can use the path vacated by the next arriving one (the solution they use in Japan I believe). It's highly likely that anyone at Oxford or MK would be better accessing HS2 northwards at Birmingham, so the connectional possibilities are rather limited. The main market would be a few highly privileged London commuters, most of whose seats would then be empty to/from further north.Could they have built a parkway station near Aylesbury Vale Parkway station which is very close to HS2? The existing Aylesbury Vale Parkway station could have been re sited to be a part of the HS2 station or connected to the HS2 station by some sort of people mover.
You are not alone in reaching this conclusion!A Chiltern station would be similar to the French "Gares des Bettraves" in many ways, but on an even busier line than Paris-Lyon. Basically every train that stops will need a second empty path to accelerate back into, unless about every third train stops in which case the departing train can use the path vacated by the next arriving one (the solution they use in Japan I believe). It's highly likely that anyone at Oxford or MK would be better accessing HS2 northwards at Birmingham, so the connectional possibilities are rather limited. The main market would be a few highly privileged London commuters, most of whose seats would then be empty to/from further north.
Whenever this topic comes up I feel obliged to make a suggestion, fairly much tongue in cheek, to put a Heathrow replacement airport here, midway between London and Birmingham and with the flightpath not overflying many urban areas. This would be a good reason to build a station but would no doubt appall the residents even more.
Not just the Chilterns - remember almost the entire "inner London" route from Old Oak Common to West Ruislip was to be on the surface originally. There it was realised that for the cost and disruption of rebuilding numerous bridges and road junctions (including Hangar Lane gyratory) then you may as well pay a little bit more to stick the whole thing in tunnel to avoid it (and a side benefit of keeping the locals much happier)
I thought it was actually decided it was cheaper to tunnel this section than build it on the surface with all the issues you describe.
Well, I'm 29 in October, so don't you think that once I'm past the age of say 60, HS2 will reach any further north? Not every member of these forums is mid-aged or higher.HS2 is unlikely to reach Manchester in my lifetime. I doubt it will reach further north in anybody on the forum's lifetime. What we're doing is building an overly elaborate London to Birmingham line with grandiose ambitions of going further which are being used to justify building it.
I would hope that eventually, once the desire for insane speed above all else is dealt with, that most trains would stop at Manchester AIrport station, it is potentially enormously useful.Manchester Airport HS2 station might be in the same category.
I've a feeling that "cheaper" is actually a bit of an urban myth in this case. More "for a tiny bit more cost, avoid alot of hassle and local impact".
A lot of potential freight traffic has disappeared because a lot of UK manufacturing industry has either closed, or been sold / moved to overseas companies, partly because of cheaper labour costs. For example, the steel industry is a pale shadow of what it was 50+ years ago.Wouldn't it be necessary to stand at those locations a number of years ago as well to understand whether it is 'booming'? A lot of container freight now contrasts with a lot of different flows (eg coal, steel, oil etc) in the past.
Is the overall number of operational freight locomotives and length of those trains increasing or decreasing at the moment?
It would be one hell of a boring journey for passengers!I keep getting the nagging feeling we would have been better off if the scheme had just proceeded in tunnel straight from OOC to Birmingham Airport, the amount of rancour and political capital that could have been saved would be very useful moving forward, and I'm no longer convinced it would be significantly more expensive.
The number of full scale fire fighting/evacuation chambers would be interesting. Does HS1 go from Stratford to Dagenham without one?
It would be one hell of a boring journey for passengers!
Yes, absolutely stupid attempts to save money!Our schemes all end up enormously complex with huge numbers of moving parts, attempts to "save money" that actually cost money, endless revised schedules and redesigns and god knows what else.
To the point that HS2 now costs a comparable amount per route kilometer to the Ceneri Base Tunnel.
The number of full scale fire fighting/evacuation chambers would be interesting. Does HS1 go from Stratford to Dagenham without one?
By stimulating economic growth so the treasury has more tax receipts to fund government spending. At least, that's the theory...I'd love to know - how does HS2 benefit the people of Devon & Cornwall?![]()
Part of the original plot for HS2 was the parallel investment in GW electrification (and elsewhere).I'd love to know - how does HS2 benefit the people of Devon & Cornwall?![]()
The M40 construction started in 1988; which was later than planned as some environmental protests caused delays.It's perhaps a bit ironic, but HS1 and HS2 have suffered the backlash from the controversy caused by the motorway construction programme and the environmental movement it generated
The likes of the M40 and M11 went through nice countryside just outside London in a way that wouldn't be acceptable now, hence whereas the M40 was built cheaply across the Chilterns in the 60s, HS2 will use really expensive tunnelling. And even then, the surface sections are causing massive controversy and local anger
Big gap between Phase 1 London - Oxford (construction 1967-74) and Phase 2 Oxford - Birmingham construction and upgrade of London - Oxford (1987-1991).The M40 construction started in 1988; which was later than planned as some environmental protests caused delays.
The M40 construction started in 1988; which was later than planned as some environmental protests caused delays.
HS2 includes a 15 kilometre tunnel through the Chiltern hills. The Chiltern hills aren't exactly a major mountain range even by UK standards and I always thought high speed railways could be built with steeper grades than railways built in the 19th century. How much of the construction of this tunnel is therefore there to appease local residents in the Chilterns rather than actual engineering needs?
Could they have built a parkway station near Aylesbury Vale Parkway station which is very close to HS2? The existing Aylesbury Vale Parkway station could have been re sited to be a part of the HS2 station or connected to the HS2 station by some sort of people mover.
No it would destroy capacity on the most time-sensitive part of the journey. The best option for Aylesbury is to introduce the MK service as originally proposed.That would potentially be a good idea, to provide links for onward travel from the dead-end Aylesbury branch, now the Milton Keynes extension has been binned. Aylesbury must be a good candidate for the largest town in the UK to be at the end of a dead-end branch - certainly southern England.
I'm more than willing to eat my hat in twenty years time!
It would be one hell of a boring journey for passengers!
That would potentially be a good idea, to provide links for onward travel from the dead-end Aylesbury branch, now the Milton Keynes extension has been binned. Aylesbury must be a good candidate for the largest town in the UK to be at the end of a dead-end branch - certainly southern England.
Extend the Aylesbury line along a second (lower) pair of tracks on the same alignment as HS2 (probably join at Quainton where the tracks are pretty much parallel), with the slow lines having platforms at Brackley, Southam, and joining the Kenilworth-Coventry line. Seems like a lot of money to satisfy very few people
MKC doesn't need an HS2 link because even with slightly more stops in the classic services it'll be faster to London, Birmingham and Manchester than it would via an interchange. There's a logic to a north Oxfordshire parkway type station, but the impact is massive for relatively small benefit. Especially as Oxford and Bicester both have good connections to London and Birmingham, and will have good connections to the WCML Classic once EWR opens.In fact seriously,siting it on the EWR link could make sense as it would then attract connectivity from Milton Keynes and Oxford, essentially serving as an MKC replacement on HS2. Such things are done on TGV lines in France - out of town stations apparently in the middle of nowhere but connected by bus or local rail to nearby large settlements.
Tunnelling still has an impact on the residents above, as you need regular access points. There are lots of work sites along the tunnelled section between Ruislip and Great Missenden for exampleI keep getting the nagging feeling we would have been better off if the scheme had just proceeded in tunnel straight from OOC to Birmingham Airport, the amount of rancour and political capital that could have been saved would be very useful moving forward, and I'm no longer convinced it would be significantly more expensive.
Tunnels in the 'country' sections are having to built with larger diameters due to the specified speed.Speed has very little to do with it, many of the most expensive parts - tunnels and stations in city centres will be running at much lower line speeds anyway. 360kph was chosen because it was the best balance of price to performance for out in the countryside anyway. Ultimately you still have to build the same length of track, the cost difference of a new build 125mph, vs 200mph line is marginal.
new stations at Totton, Birmingham (x2) and OOC.
MKC doesn't need an HS2 link because even with slightly more stops in the classic services it'll be faster to London, Birmingham and Manchester than it would via an interchange. There's a logic to a north Oxfordshire parkway type station, but the impact is massive for relatively small benefit. Especially as Oxford and Bicester both have good connections to London and Birmingham, and will have good connections to the WCML Classic once EWR opens.
Tunnelling still has an impact on the residents above, as you need regular access points. There are lots of work sites along the tunnelled section between Ruislip and Great Missenden for example
Isn't there also a maximum length of tunnel you're allowed without having a parallel service tunnel, like the Channel Tunnel has?