The Northern RUS process has been overseen and
directed by the Stakeholder Management Group
which comprises representatives from the Train
Operating Companies (TOCs), Freight Operating
Companies (FOCs), the Department for Transport
(DfT), Network Rail, the Association of Train
Operating Companies (ATOC), Passenger Focus,
the Passesnger Transport Executives (PTEs) and
the ORR (as observers).
It does kind of chime with rumours that the government is planning to cancel GWML electrification and instead reinstate MML electrification.
The RUS makes sorry reading for how much lengthening or extra services it says are required and the chance that we will actually get new stock in the short-mid term. It speculates that efficency savings could be had from including a order for the replacement of the Merseyrail DC units with a new AC units order to serve electrification/lengthening on top of the cascade and speculates a Pacer/Sprinter replacement may have better performance charachteristics. In fact perhaps due to ecomic climate theirs very little infrastructure works proposed in it for the next 30 years bar lancashire Trangle and later Transpennine electrification, Northern Hub and Leeds Station.
Worth pointing out that RUS documents are just 'talking shop' documents. They are commitments to nothing.
I wonder what the point of them is. They probably make the DfT and railway industry feel god that they have produced such nice documents.
As to their benefits, that's highly debatable. Still the railway industry likes to keep on spending lots of much but achieving very little.
How many man hours and how much money spent developing this RUS ? Lots, I fear. Benefits --> practically zero.
Worth pointing out that RUS documents are just 'talking shop' documents. They are commitments to nothing.
It does kind of chime with rumours that the government is planning to cancel GWML electrification and instead reinstate MML electrification.
I imagine the point is that it allows local "Stakeholders" to have a forum to campaign for their own "wishlists", regardless of the fact that they are unlikely to happen.
I never expect much of them to actually happen (in the short/ medium term), but it does give an indication into the kind of things that are on the table.
Trouble is though, if you come up with a scheme and it doesnt make it into the RUS, you are all but knackered.
If you go back and look at some older RUSs such as 'Cross London', you'll find that a fair proportion, probably a majority, of the proposed service and infrastructure changes have happened, or are happening soon.
The problem is, people are so used to things being talked about for years without anything happening that they are conditioned to be highly suspicious of these shopping lists. My suggestion is to wait a few years, as they deal with things 5 or 10 years before they happen...
That sounds like the kind of "health warning" that should come with these, to stop us getting excited about any short term improvements.
Worth pointing out that RUS documents are just 'talking shop' documents. They are commitments to nothing.