• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Should the major timetable change continue to be in December?

Status
Not open for further replies.

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
But then changing in October is only a few weeks into the academic year / term time.
Well the leaf fall timetables appear only a few weeks into the accdemic year.

Some train connections at Guildford are no longer possible as the stopping trains leave earlier and it breaks the connections off trains coming from the south

I'm not saying the leaf fall timetables aren't required, just that their already is a timetable change around this time.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,985
Location
Airedale
Well the leaf fall timetables appear only a few weeks into the accdemic year.

I'm not saying the leaf fall timetables aren't required, just that their already is a timetable change around this time.
True, but they are planned and published months ahead (and only apply on a subset of routes - much as the summer seasonal ones do) and never involve fundamental alterations to the service.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
True, but they are planned and published months ahead (and only apply on a subset of routes - much as the summer seasonal ones do) and never involve fundamental alterations to the service.
Having to get up earlier is a fundamental alternation to someone's life though
 

David Goddard

Established Member
Joined
8 Aug 2011
Messages
1,515
Location
Ely
I personally think that the best times to change would be when the clocks change.
Everyone would know about it from and early point and would be easy to remember. Is also the kinds of times which in the main are not affected by adverse weather to add challenges to bedding in a new timetable. Would still need a few high summer variations but that's fine. Better than December and May
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,664
Then you'd still need a December-ish change for end of leaf fall.

We seem to have worked out September is no good as impacts the end of the summer holidays, neither is December or January so leaves us maybe with October to coincide with leaf-fall?
On the basis you have a change for leaf fall in December so having a full change there might be good (as now). However I would go for October like @HamworthyGoods suggests and the start of leaf fall for a full change. People wouldn't be left behind in October either as the earlier start for leaf fall becomes a later start once leaffall timetable is withdrawn in December.
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
mid December to early March - winter season (not loads happening)
early March to mid May - semi leisure season
mid May to early September - peak summer season
early September to mid December - semi leisure season + leaf fall
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,985
Location
Airedale
Well then are summer timetable changes fundamental? It's only for a several months.

That isn't to dsminish the work involved.
We're confusing temporary changes (dated trains, reversed at the end, and reasonably predictable) with permanent ones (mostly minor, but sometimes very substantial). Both affect passengers, but the impact on the system as a whole is very different.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
We're confusing temporary changes (dated trains, reversed at the end, and reasonably predictable) with permanent ones (mostly minor, but sometimes very substantial). Both affect passengers, but the impact on the system as a whole is very different.
As I don't work in train planning, I would know what the effect is for the system. I'd just see changes.

There would I imagine be more leaf-all changes than summer timetable changes.
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,485
There would I imagine be more leaf-all changes than summer timetable changes.
That would depend by Region, in the South West there are no leaf-fall changes but a Summer Saturday timetable looks nothing like a Winter Saturday - for example in the Summer Paddington to Paignton is two hourly, in Winter it’s almost non existent as matches the demand profile.
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,453
That would depend by Region, in the South West there are no leaf-fall changes but a Summer Saturday timetable looks nothing like a Winter Saturday - for example in the Summer Paddington to Paignton is two hourly, in Winter it’s almost non existent as matches the demand profile.
Would they not input the summer timetable changes months in advance, like they do with the leaf-fall timetables?
 

mwmbwls

Member
Joined
14 Dec 2009
Messages
682
I think it is useful to remember how complex timetable planning is. Ray Cummings May2020 PWI Lecture is a masterclass in explaining the railway equivalent of the conjurer's trick of spinning plates on canes. Timetable Planning (thepwi.org) The fact that planning starts 16 months before the introduction of the timetable and has to allow multiple reconciliations of competing/changing interests would probably mean that to introduce a new timetable date - the existing "old timetable" would have to be extended to run for more than a six month period because I cannot see how it could be done on a shorter timescale.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,722
Location
Leeds
I think it is useful to remember how complex timetable planning is. Ray Cummings May2020 PWI Lecture is a masterclass in explaining the railway equivalent of the conjurer's trick of spinning plates on canes. Timetable Planning (thepwi.org) The fact that planning starts 16 months before the introduction of the timetable and has to allow multiple reconciliations of competing/changing interests would probably mean that to introduce a new timetable date - the existing "old timetable" would have to be extended to run for more than a six month period because I cannot see how it could be done on a shorter timescale.
If you moved the date back to October it would still be 16 months. You'd 'just' be starting two months earlier.

(Note: I do understand it's a complex issue!)
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,728
We managed with a 12 month one for the Olympics, you could arguably transition with a Dec - Oct offer.
 
Status
Not open for further replies.