www.railnews.co.uk
It never fails to amaze me why people think battery powered vehicles will struggle up hills. The electric motors don’t know - or care - where the electrons come from. The train will sail up the banks easily, just as Teslas sail up Stelvio.
As Roger Ford explains in this months Modern Railways, one Class 800 power pack weighs 8 tonnes of MTU engine, alternator, cooling system, fuel tank and exhaust after treatment. A battery pack weighing that much will have a capacity of around 1 MWh. That provides enough juice to power
the whole train at full power for about half an hour. That would get you up Drumochter, let alone Dainton. More realistically, it will get trains into and out of stations with the engines off, and boost the power when accelerating at higher speeds (or up the banks) to help reduce journey times.
I know some forum members like to make a little fun of me talking abut battery trains, but this is happening, and will be running on the main line in three years.
Why is this relevant here? Because it could dramatically alter the cost / benefit of decarbonising the line from Bristol / Newbury to Penzance, which I estimate would provide much better environmental benefit than reopening a line across Dartmoor.