Purple Orange
On Moderation
Are you intending to reroute the Bangor service via the Mid-Cheshire line then under this plan?
Yes, as per the suggestion in the DfT consultation.
Are you intending to reroute the Bangor service via the Mid-Cheshire line then under this plan?
You would be using too much of the capacity at Victoria that you need available to relieve Castlefield.If “everywhere-to-everywhere” is an issue, and there are a maximum 10 or 12 tph permitted through Castlefield, why couldn’t we utilise the chord to it’s maximum capability?
You would be using too much of the capacity at Victoria that you need available to relieve Castlefield.
I do like this Takt idea, simple 2tph pairs of services to the same/similar destinations. Makes operations easier and surely much easier for passengers
My ideas...
CASTLEFIELD [all calling at Deansgate, Oxford Road & Piccadilly]
2tph Blackpool North to Airport via Bolton - 6 car Class 331s
2tph Southport to Alderley Edge via Bolton - 3 car Class 195s
2tph Rochdale to Airport via Victoria - 3 car Class 195s
2tph Lime Street to Cleethorpes (1tph) / Nottingham (1tph) via Warrington Central - 6 car Class 185s
2tph Lime Street to Airport via Newton-le-Willows (all stops) - 3 car Class 331s
2tph Warrington Central to Oxford Road - 3 car Class 195s
All standardised as much as possible so can use @Bletchleyite idea for marking out door positions & all units have high performance
AIRPORT LINE
2tph Piccadilly to Crewe via Airport (all stops)
2tph Blackpool North to Airport via Bolton & Oxford Road (fast Piccadilly to MIA)
2tph Rochdale to Airport via Victoria & Oxford Road (fast Piccadilly to MIA)
2tph Lime Street to Airport via Newton-le-Willows & Oxford Road (all stops)
All stations on the Airport line can have 4 tph
VICTORIA
2tph Clitheroe/Blackburn to Stalybridge via Bolton
2tph Kirkby/Wigan to Leeds/Blackburn via Atherton
1tph Glasgow/Edinburgh to Victoria via Bolton (calls at Chorley & Bolton only after Preston)
1tph Barrow/Windermere to Victoria via Bolton (calls at Chorley & Bolton only after Preston)
2tph Lime Street to Newcastle (1tph) / Scarborough (1tph)
2tph Chester to Newcastle (1tph) / Redcar (1tph)
2tph Victoria to Leeds via Halifax
(1tph Peak only Wigan to Victoria via Atherton)
Trans Pennine services all run through Victoria, so the Calder Valley trains can terminate in the bays at Victoria - the TPE units are too long for the bays, saves shunting units around into sidings etc.
Passengers from the North East via Trans Pennine can change at Victoria for direct Airport services.
Passengers from the Calder Valley can change at Rochdale for direct Airport services.
Passengers from the North West via WCML can change at Preston or Bolton for direct Airport services
Passengers from stations between Chester & Earlestown can change at Newton-le-Willows for direct Airport services
The North Wales service would run via Mid-Cheshire line (calls at Northwich, Knutsford, Altrincham & Stockport) - as discussed in MRTF Consultation
Would it not make sense to have Southport services ending at a destination that is not electrified, such as Buxton? This would enable EMUs to run on a Piccadilly-Alderley Edge service, reducing the need for DMUs under wires.
Interesting you mention Southport-Buxton as I believe that's been done before. Southport-Chester via Altrincham was another common one in the 1990s.
Blackpool-Buxton was done hourly from 1993 to 2008.
Good shout on the Southport to Buxton, matching up the diesels would make more sense. Then 2tph Piccadilly to Alderley Edge via Stockport as a EMU service.Would it not make sense to have Southport services ending at a destination that is not electrified, such as Buxton? This would enable EMUs to run on a Piccadilly-Alderley Edge service, reducing the need for DMUs under wires.
Similarly should the 2 tph Chester TPE service not run to Middlesbrough & Scunthorpe, with the 2 tph Liverpool TPE services all going to Newcastle, making best use of the 802s.
Good shout on the Southport to Buxton, matching up the diesels would make more sense. Then 2tph Piccadilly to Alderley Edge via Stockport as a EMU service.
Although when Blackpool-Buxton ran, it was hardly a shining beacon of reliability.
I suppose that is always the risk of linking up services across Manchester, I would hope that the work done with MRTF and simplified services would improve overall reliability across all routes.Although when Blackpool-Buxton ran, it was hardly a shining beacon of reliability.
But then neither has the Southport service in recent years. Perhaps the latest proposals for Southport trains to go through Victoria is best.
I suppose the upside for Sandgrounders is that Vic tends to end up in a mess less than Castlefield does. Even if option C is chosen, it's still going to choke up half the North West if a unit breaks down or there's a medical emergency at Deansgate or Picc. While a blocked platform at Vic would still be a problem, it at least has another pair so the whole job isn't stopped.
One thing the proposals don't address (probably because it's not really Network Rail's job) is the other elephant in the room - crew changes in central Manchester - is that still going on? If so it needs to stop. Also, the unit and crew diagrams need to be kept fixed within a given route - this will be less efficient, but does mean that if the system does end up in a mess you can bring it back where it should be with a few judicious cancellations like Merseyrail does in such an event. If you have a unit and crew that are just going Southport-Rochdale and back all day (or whatever) on an hourly service and it ends up 45 minutes late (say), you can sort the mess out just by canning a round trip, or if it's not that late turning one short. You can't do that if the crew or unit is going Southport-Rochdale-Vic-Leeds-Vic-Kirkby, or whatever mess they've managed to come up with.
This was actually a key downfall of the now-dead-and-unlikely-to-be-back LNR through services across Birmingham - a problem on one of the branches knackered everything as the interworking was just too complex.
One thing the proposals don't address (probably because it's not really Network Rail's job) is the other elephant in the room - crew changes in central Manchester - is that still going on? If so it needs to stop.
Crew changes take place officially at Piccadilly 1-12, Oxford Rd (Northern only) and Victoria.
There are no official booked crew changes at Piccadilly 13/14 or Deansgate in normal operation.
The chord service or taxis are used to get drivers and conductors to Vic from Pic
It would be a mighty big task to end the crew changes at Oxford Road, Northern Piccadilly crew depot generally do not sign any routes north of Manchester & only the CLC line to Liverpool (except maybe a fifth of drivers that sign up to Preston, but not conductors) and the depots north of Manchester do not sign routes south out of Piccadilly (except the Airport line, which pretty much every depot signs, and some sign along to Stockport and Hazel Grove, some Victoria drivers also sign the mid-Cheshire line).OK, then they need (for a Thameslink like approach) to pack in doing them at Oxford Road and Vic, particularly the former. A busy city centre core with only 7 usable through platforms in total (3 at Oxford Road*, 4 at Vic) is not the place to do this.
Terminal platforms at Picc, fine.
* 1 is to all intents and purposes disused due to lack of lift
I absolutely agree the crew changes shouldn't take place at Oxford Road, it would be a big undertaking to get lots of train crew trained on all new routes. In terms of service resilience and reliability it's something that should be tackled.
So where do you propose that crew changes take place considering Victoria has a reasonably sized Northern train crew depot and you’ve previously stated that most TPE services shouldn’t use the chord? How would TPE Piccadilly drivers (who largely operate the western-side Nova 3) take over services?
Move the train crew depot to Manchester Airport.
Pairing by speed rather than by direction was suggested previously when the Ansaldo resignalling was done. Whilst superficially attractive it has problems: the cost of rebuilding Heaton Chapel and Levenshulme stations, the loss for passengers of one island per direction at Stockport and all it does is move the fast/slow up/down manoeuvre southwards. A grade separated junction in the Slade Lane Junction area is the proper solution.The way the slow and fast tracks on the Stockport - Longsight line get in each others way definitely needs to be resolved. Either with the southbound slow track flying over the two fast tracks or as suggested above pairing the slow and fast tracks together and rebuilding all of the stations to suit.
Not at all. Buxton to Manchester passengers would still have to cross the full alignment, solving less problems than double track grade separation south of Stockport. Spend a bit more money to solve the entire solution.A grade separated junction in the Slade Lane Junction area is the proper solution.
Eh? If you're going to go into single service groups, take the Liverpool-Nottingham service. Grade separation at Slade Lane would give it much easier passing from the Castlefield corridor to the Hazel Grove line without having to cross the fast lines on the flat.Not at all. Buxton to Manchester passengers would still have to cross the full alignment, solving less problems than double track grade separation south of Stockport. Spend a bit more money to solve the entire solution.
If you grade separate at Edgeley (No.1) then the Hazel Grove lines don’t touch the fasts, nor does anything on Castlefield.Eh? If you're going to go into single service groups, take the Liverpool-Nottingham service. Grade separation at Slade Lane would give it much easier passing from the Castlefield corridor to the Hazel Grove line without having to cross the fast lines on the flat.
Grade separated junctions are always a better fix than moving problems or fudging solutions.