Ok so, Covid has created a need to cut down operating costs. Currently, there’s an hourly service, with 3 trains on Barnstaple - St James - Barnstaple diagrams. In my view, the way to make meaningful economic change is to cut that down to 1 unit, however a 1tp3h service is too awkward and probably too much of a cut. Ideally, there’d be a 1tp2h service, but that isn’t possible with the existing line speeds and stops. With a brief look at the area around the Barnstaple route, it seems that the only large location en route is Barnstaple. Other than that, It’s pretty much just Lapford, Copplestone and Crediton. They can all get a few extra car park spaces for the minimal people A service stopping at these 3 places en route to Exeter St Davids (plus the bit to Central/St James) would take pretty much 1 hour on the dot. This ought to be cut down to about 54 or 55 minutes if at all possible. This would be done by increasing line speeds - hopefully that’s possible. A single train can operate this limited stop shuttle and there need be no more than a single track after the line has diverged from the mainline towards Taunton. Any Okehampton trains can take the line while the Barnstaple unit is up north of Yeoford or anywhere else beyond Cowley Bridge Jn (towards Exeter).
Any thoughts?
Any thoughts?