To the best of my knowledge, there are six or seven 508s in store at Telford International Railfreight Terminal. Their last user was Southeastern trains.

Does anyone know what will happen to these units, or will they be stored indefinitely?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Skimble19

Established Member
Joined
12 Dec 2009
Messages
1,508
Location
London
There's about 12 508's stored from SET isn't there? Seems very strange, they were only recently repainted before they were stored. Hopefully they'll find use down in 3rd rail land, or on Merseyrail if they'll take 'em!
 

Drsatan

Established Member
Joined
24 Aug 2009
Messages
1,887
Location
Land of the Sprinters
I assumed Southern would use them on West & East Coastway services but decided to use cascaded 313s from LOROL instead.

However, the 508s could be deployed on SWT services in multiple with 455s. They were used on South West Division surburban services in the late 1970s until being transferred to Merseyside. That way, Windsor line services could be extended to 11 cars, without Southern having to give up its 456s (which would have allowed Windsor line services to be lengthened to 10 cars)

It's a possibility assuming SWT would be prepared to accept a non-standard class.
 

O L Leigh

Established Member
Joined
20 Jan 2006
Messages
5,609
Location
In the cab with the paper
However, the 508s could be deployed on SWT services in multiple with 455s.

Nope.

Both classes have Tightlock couplers, but the Cl508's have the fully automatic version with the air and electrical connections on a connector block while the Cl455's make their air and electrical connections using old-school hoses and jumper cables.

And that's discounting the possibility that these classes are even compatible anyway. We can't run Cl315's with Cl317's in multiple except for ECS or assistance purposes because they are not fully compatible.

O L Leigh
 

First class

Established Member
Joined
9 Aug 2008
Messages
2,731
Doubt they'll becoming up to Merseyrail either. With timetable changes in December requiring even more unit availability, Merseyrail declined to accept these stored 508s, so obviously believe that they would be surplus to demands.

However, if Merseyrail were to lose units (fire, vandalism, crash etc) then they may get a bit more interested...
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,245
Location
Yorks
Sounds like someone should authorise a small extension of the third rail so that these could be made use of. Would there be enough to cover Southern's diesel diagrams if Hastings - Ashford and Uckfield were electrified? And since Southern wouldn't have any diesel routes they could just swap one non-standard class of train for another. (Perhaps they could be refurbished to longer distance standards).

Alternatively extend Merseyrail?
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Surely the logic thing is to replace the 158s at SWT that spend all day on the third rail routes (not the Exeter services, of course)
 

Templecombe

Member
Joined
4 Jun 2010
Messages
110
Location
see above
Surely the logic thing is to replace the 158s at SWT that spend all day on the third rail routes (not the Exeter services, of course)

it would be a help if they didn't use one of the 158's on the lymington branch,but these 508's will prob get the gas torch taken to them
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Sounds like someone should authorise a small extension of the third rail so that these could be made use of. Would there be enough to cover Southern's diesel diagrams if Hastings - Ashford and Uckfield were electrified? And since Southern wouldn't have any diesel routes they could just swap one non-standard class of train for another. (Perhaps they could be refurbished to longer distance standards).

Alternatively extend Merseyrail?

But 508s would be non-standard like if something went wrong
 

mickey

Member
Joined
11 Mar 2010
Messages
668
Doubt they'll becoming up to Merseyrail either. With timetable changes in December requiring even more unit availability, Merseyrail declined to accept these stored 508s, so obviously believe that they would be surplus to demands.

I don't think anyone should be encouraging anyone else to make a decision on them just yet...
What I mean, of course, is that Merseyrail's decision is a gamble (albeit a carefully considered and justified for now one), and come next year there's a chance they'll have to change their mind. In which case it would be disastrous if they'd gone to Hastings!
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
it would be a help if they didn't use one of the 158's on the lymington branch,but these 508's will prob get the gas torch taken to them

Yeah, that's the one, couldn't remember the name of the branch.

Using 508s on self contained diagrams there (plus, are there other 158 diagrams exclusively on the third rail?) would only free one or two 158s, but these additional carriages would be appreciated on routes like Cardiff - Portsmouth/ Liverpool - Nottingham etc where 158s are running at capacity

If we are cutting up EMUs whilst using DMUs on electrified routes at the same time that we have crowding problems on existing DMU routes then... I give up!
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Yeah, that's the one, couldn't remember the name of the branch.

Using 508s on self contained diagrams there (plus, are there other 158 diagrams exclusively on the third rail?) would only free one or two 158s, but these additional carriages would be appreciated on routes like Cardiff - Portsmouth/ Liverpool - Nottingham etc where 158s are running at capacity

If we are cutting up EMUs whilst using DMUs on electrified routes at the same time that we have crowding problems on existing DMU routes then... I give up!

I also don't see why they don't use 313/508s on the Lymington branch, and the non-standard fleet excuse doesn't really work
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
I also don't see why they don't use 313/508s on the Lymington branch, and the non-standard fleet excuse doesn't really work

They could use a different 508 each day of the week on the route (so there are plenty of spares), which would free up badly needed Sprinters
 

387star

On Moderation
Joined
16 Nov 2009
Messages
6,665
Talking of fleets moving around how about using the new ScotRail desiros (a small pool) on the Manchester-Glasgow services... or even the 334s if appropriately refurbished...
 

Scousefandan

Member
Joined
24 Aug 2010
Messages
38
Location
Wigan
It'd be nice to see them on the Northern Line beyond Kirkby, to Wigan Wallgate....if Merseyrail ever decide to get round to electrifiying that far...and if GMPTE don't drag their feet over it
 

Bastiaan

Member
Joined
7 Dec 2005
Messages
195
Location
Netherlands
Talking of fleets moving around how about using the new ScotRail desiros (a small pool) on the Manchester-Glasgow services... or even the 334s if appropriately refurbished...
Excellent idea! Just fit them with a diesel motor or electrify Manchester to Lowton Jn. and you're done! :P
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,245
Location
Yorks
But 508s would be non-standard like if something went wrong

This is quite true - My thinking is that as the diesels on Southern are already in effect non-standard to the rest of their trains, Southern would in effect be swapping one non-standard fleet for another so they wouldn’t end up any worse off.

these 508's will prob get the gas torch taken to them

That would be an appalling waste of resources if it were allowed to happen.

(plus, are there other 158 diagrams exclusively on the third rail?)

I’m not sure there are though. Someone could probably confirm this but I suspect most if not all of their diagrams include the unelectrified network north west of the Basingstoke - Weymouth line.

Let’s hope they’re put in warm storage somewhere and run around the block every now and again so that they don’t deteriorate.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
I’m not sure there are though. Someone could probably confirm this but I suspect most if not all of their diagrams include the unelectrified network north west of the Basingstoke - Weymouth line

You may well be right; I had a memory of someone discussing 158 trips on electrified lines, but this was probably either due to EMU shortages or on a duty that involved at least some unelectrified track at some stage in the day

Still, even if it only saves the one 158 on the branch, it'd be worth it
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,245
Location
Yorks
I can't disagree with you there. I was railing against the withdrawal of the Lymington CIG's a short while back for just that reason :lol:
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
This is quite true - My thinking is that as the diesels on Southern are already in effect non-standard to the rest of their trains, Southern would in effect be swapping one non-standard fleet for another so they wouldn’t end up any worse off.

Not really, 171s have dellner couplers (thats why they're 171s) so they aren't that non-standard, as a 171 can couple to a failed 377 and the other way around. If a 508 failed, that'd be it
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
Same with 313, if it fails its basically done for unless a shunter or another 313 can come and rescue it. It was so much simpler with a sem-standard fleet of 377s and 171s.
 
Joined
8 Dec 2006
Messages
961
Location
Costa Del Sheppey
Not really, 171s have dellner couplers (thats why they're 171s) so they aren't that non-standard, as a 171 can couple to a failed 377 and the other way around. If a 508 failed, that'd be it

There are 6 or more perfectly fine and useable SET 508s - if SN had 4, with 2 in service and 2 spare, if one broke down - send a spare to recover it!

That's what Southeastern do with the 466s - send another 466 or a 465 to bring it back to depot.
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
Well if a 377 fails it can be pushed by a 171 if it is behind, thus clearling the line quickish. The Marsh Link line would have to be electrified to make use of them.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,245
Location
Yorks
Not really, 171s have dellner couplers (thats why they're 171s) so they aren't that non-standard, as a 171 can couple to a failed 377 and the other way around. If a 508 failed, that'd be it
Perhaps to a point, but then again a 377 might have difficulty rescuing a 171 anyway if it failed at Rye for example :lol: On a serious note, would it be relatively easy to change the couplers on the units ? - I’ve heard of this sort of thing being done to loco’s but not on units before.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Perhaps to a point, but then again a 377 might have difficulty rescuing a 171 anyway if it failed at Rye for example :lol: On a serious note, would it be relatively easy to change the couplers on the units ? - I’ve heard of this sort of thing being done to loco’s but not on units before.

Not sure, because for example, the dellners on 57s are like 4inches to high to couple to a 377..
 

Dreadnought

Member
Joined
1 Oct 2007
Messages
586
There are 6 or more perfectly fine and useable SET 508s - if SN had 4, with 2 in service and 2 spare, if one broke down - send a spare to recover it!

Nice idea in theory but who pays for the additional lease costs and all the start up costs (driver, guard and maintenance staff training + spares for maintenance) that would be required?
 

mbonwick

Established Member
Joined
26 Oct 2006
Messages
6,310
Location
Kendal
On a serious note, would it be relatively easy to change the couplers on the units ? - I’ve heard of this sort of thing being done to loco’s but not on units before.

Can't be that hard, Southern did it to a fair few of their 171s, turning them from 170s..
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Can't be that hard, Southern did it to a fair few of their 171s, turning them from 170s..

Doesn't mean it would be that simple for an older unit. Bear in mind that 170s & 377s are both Bombardier and built at around the same time...
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
Can't be that hard, Southern did it to a fair few of their 171s, turning them from 170s..

Yes they did. The 313s could possibly be changed to Dellners as their current couplers are also fully automatic.
 

O L Leigh

Established Member
Joined
20 Jan 2006
Messages
5,609
Location
In the cab with the paper
It's not as simple as that. It depends on the train wires and lots of other issues besides.

The issue over couplers isn't necessarily as complicated as it seems. A train doesn't have to be compatible with the entire fleet but it does help if it can be coupled to the one behind (or in front) if it fails. This is why using Cl313's isn't so daft, because they will be limited on the routes they work and they won't be too far away from another Cl313 should they need a little help.