3rd rail is far cheaper to install than OHLE, it makes sence on routes where trains don't need to go over 100mph.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Joined
8 Dec 2006
Messages
961
Location
Costa Del Sheppey
Well, with a refurb, unreliability might be less of a problem but whilst there may not be a stock shortage on South Eastern, there is a stock shortage elsewhere.

Or is it back to square one - WE NEED MORE THIRD RAIL!!!!!

So an internal and possibly external refresh will somehow make the mechanical parts better and less probe to failure?

Don't think so somehow.

 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Well, with a refurb, unreliability might be less of a problem but whilst there may not be a stock shortage on South Eastern, there is a stock shortage elsewhere.

So, if we released one 466, who exactly would this help 'elsewhere'?
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
Yes but quite, the fact is there are at least two routes on the southern which are diesel islands (Hurst Green - Uckfield and Ore - Ashford) plus probably more if you count Redhill - Reading which would simply not make sense on OLE, not to mention Ormskirk - Preston which is self contained and which would make more sense stuck on to Merseyrail. So whilst I agree with efficiency (although not so much safety - I've never heard of the third rail arking!), I would have to catagorically answer my own rhetorical question YES, WE DO NEED MORE THIRD RAIL!!!!!

Agreed.

Instead of spending millions electrifying the MML and GWML we'd be better off electrifying those short gaps that exist on the railway that would allow a much higher number of DMUs to be replaced by EMUs (per mile of track converted).

Uckfield, Redhill, , Ormskirk and Ore all need converting to Third Rail, in the way that the the Manchester/ Liverpool/ Blackpool triangle needs the gaps filling in for overhead wires, similar to the lines around Walsall etc.

A 508 may not be everyone's cup of tea, but it is still a better option than a Pacer! EMUs don't wear out the way DMUs do, so lets add some more electrified miles to make the most of the old EMUs we have

(yeah, in an ideal world we'd be building hundreds of DMUs to replace the Pacers/ Sprinters, but that's not going to happen)
 
Joined
11 Apr 2008
Messages
780
Location
Wigan,United Kingdon and Kingswood Nsw, Australia
The idea of electrifying Kirkby-Wigan is foolish as there just isnt the demand going mersey bound from Wigan no one wants to go to merseyside when manchester preston and bolton are cheaper and easier to get to .

The idea of possibley Electrying a proposed Kirky-Skelmersdale branch would be ideal though as alot of skem people travel to liverpool/kirkby via bus or the M58 as there is a natural flow back to merseyside but that just doesnt really exist in wigan because the fares are so high to merseyside.

153's are banned from Wigan WG due to the curves on the platforms at Wigan 155's are also banned but can use Northwestern.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,228
3rd rail is far cheaper to install than OHLE, it makes sence on routes where trains don't need to go over 100mph.

No it isn't, and doesn't. There are huge costs associated with having transformers and rectifiers every few miles to produce the DC.

Where significant electrification extensions beyond the SR are being discussed (eg Basingstoke - Salisbury - Exeter), NR have already said it will probably be AC for cost reasons.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Would that mean Dual voltage trains (hopefully more desiros :D) would be needed if it went ahead?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,228
Would that mean Dual voltage trains (hopefully more desiros :D) would be needed if it went ahead?

Yes - but that doesn't really matter because all current and future EMUs are dual voltage under the skin, whether pantograph, shoe gear or both is present.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Yes - but that doesn't really matter because all current and future EMUs are dual voltage under the skin, whether pantograph, shoe gear or both is present.

Yes, but unfortunately it would mean you'd lose the flexibility you'd have if it was DC, but it would be better than it is now I suppose :D. That is only a really minor thing though
 

Drsatan

Established Member
Joined
24 Aug 2009
Messages
1,887
Location
Land of the Sprinters
No it isn't, and doesn't. There are huge costs associated with having transformers and rectifiers every few miles to produce the DC.

Where significant electrification extensions beyond the SR are being discussed (eg Basingstoke - Salisbury - Exeter), NR have already said it will probably be AC for cost reasons.

Not forgetting that AC OHL trains can operate at more than 100mph (the limit for 3rd rail stock to avoid damaging the shoe gear), consequently improving journey times and line capacity. 25kv AC electrification provides more current, which is apparently necessary to operate heavier trains (such as double deck trains) without bringing other trains to a halt due to the draw on current.

Ideally, all 3rd rail lines should be progressively converted to 25kv AC, starting with lines that are easiest to convert. This would allow journey times and capacity to be increased across the board, especially if double deck trains can be used due to the associated gauge enhancements necessary to install the OHL equipment.
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
The journey times would only be increased if the the speed limit was increased. Most modern EMUs have a top speed of 100mph. Track would also have to be improved for 125mph operation (etc). Plus the OHLe would ruin the Southern countryside :D
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,247
Location
Yorks
So an internal and possibly external refresh will somehow make the mechanical parts better and less probe to failure?

Don't think so somehow.


I'd find it quite surprising if mechanical systems weren't repaired or even improved during a major overhaul.
 

Drsatan

Established Member
Joined
24 Aug 2009
Messages
1,887
Location
Land of the Sprinters
The journey times would only be increased if the the speed limit was increased. Most modern EMUs have a top speed of 100mph. Track would also have to be improved for 125mph operation (etc). Plus the OHLe would ruin the Southern countryside :D

Thanks, forgot to mention that journey times would only be decreased if the speed limits of track and rolling stock were increased simultaneously.

As for the aesthetics of OHL, you'd get used to it. Koln station looks good regardless of the overhead knitting, as does Carlisle.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,247
Location
Yorks
Not forgetting that AC OHL trains can operate at more than 100mph (the limit for 3rd rail stock to avoid damaging the shoe gear), consequently improving journey times and line capacity. 25kv AC electrification provides more current, which is apparently necessary to operate heavier trains (such as double deck trains) without bringing other trains to a halt due to the draw on current.

Ideally, all 3rd rail lines should be progressively converted to 25kv AC, starting with lines that are easiest to convert. This would allow journey times and capacity to be increased across the board, especially if double deck trains can be used due to the associated gauge enhancements necessary to install the OHL equipment.

Still a pointless waste of money though. There are far more important things to be paid for than converting one type of electrification to another.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
Still a pointless waste of money though. There are far more important things to be paid for than converting one type of electrification to another.

True, but you can start the change to OHLE by doing that change on the niche diesel routes such as Uckfield and Reading routes as previously mentioned.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,247
Location
Yorks
True, but you can start the change to OHLE by doing that change on the niche diesel routes such as Uckfield and Reading routes as previously mentioned.

True - but then they'd be committing themselves to changing the rest in the future. I really can't see anyone stumping up to convert the 3rd rail network, even as a long term aspiration.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Yes - but that doesn't really matter because all current and future EMUs are dual voltage under the skin, whether pantograph, shoe gear or both is present.

Are they all dual voltage really? All AC capable, yes, but I'd find it hard to believe the 380s (for example) are 3rd-rail capable- I'd bet it would be a heck of a lot more work than just fitting shoe gear. Thought even the 350/2s are not DC capable (just the 350/1 - as they were going to be 450s until an advanced stage of build)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,228
Are they all dual voltage really? All AC capable, yes, but I'd find it hard to believe the 380s (for example) are 3rd-rail capable- I'd bet it would be a heck of a lot more work than just fitting shoe gear. Thought even the 350/2s are not DC capable (just the 350/1 - as they were going to be 450s until an advanced stage of build)

They all have a DC link between the AC input and the traction converters - the bit that produces the variable voltage variable frequency for the motors. Assuming there isn't a problem with mounting shoe gear on the relevant bogies, the DC goes in at the DC link. Fitting the necessary cabling and control gear is relatively straightforward AIUI, even if not original fit.

--- old post above --- --- new post below ---

...However, assuming Fratton drivers were signed on them, 508s working in multiple could be used on Portsmouth Harbour - Southampton Central diagrams; the end to end journey time is one hour five minutes, over the one hour maximum journey time for units without toilets.

I was a bit sceptical about the 'one hour maximum' for units without toilets when you posted it, but it seems according to the DfT there is no such rule. At least that's their response to the RMT's complaints about the SN 313 introduction on the coastway services.

The Department for Transport said there were no rules on whether or not toilets should be available on trains.

"We expect rail companies to provide a good service," he added.