To release 170s from Northern it'd be best to order some new bi-modes for the most obvious bi-mode routes (e.g. Barrow/Windermere) and swap the 195s in for 170s.
Another small non-standard fleet then!
To release 170s from Northern it'd be best to order some new bi-modes for the most obvious bi-mode routes (e.g. Barrow/Windermere) and swap the 195s in for 170s.
I'm not saying that wouldn't work - I just think that sending the 158s to Northern in exchange for 170s would be a bit more sensible because it consolidates all the relevant 170s with EMR and all of the relevant 158s with Northern, rather than splitting them between. They would still require a repaint and new seat covers and carpets regardless of who they are going to.Or why don't EMR just keep some/all of their curre t 158s? Perfectly decent trains - proper repaint and new seat covers, etc, and they'd be fine. Crews alreay work them, so no training needed...
Another small non-standard fleet then!
Another small non-standard fleet then!
<crayons>A non-standard fleet, but one dedicated to a set of routes that are absolutely textbook-perfectly suited to bi-mode (or even battery) operation.
If I'd been in charge of Northern's fleet orders, it would have been lots of 3-car end-gangwayed bi-modes, enough to allow for a healthy number of 6-car workings.
Are you including or not including the engine compartment in the number of sections?Agreed. Or I'd have considered 4-section FLIRTs.
Are you including or not including the engine compartment in the number of sections?
Fair enough.Sorry, that's 4 "coaches" plus the engine (the vehicles are short, so a 3-section one is really equivalent to a 2x24m conventional DMU).
I'm not sure what the issue is here, as you'd been replacing one small fleet (170s) with another.Another small non-standard fleet then!
Absolutely.I really don't think anyone's going to order a new DMU that can't easily be converted to a bi-mode or EMU.
If they'd ordered the 195s as "755s" and the 331s as a straight EMU version of the 755 (like a short 745) then you could have them work together if needed. As it is a 195 won't work with a 331.Sorry, that's 4 "coaches" plus the engine (the vehicles are short, so a 3-section one is really equivalent to a 2x24m conventional DMU).
The Welsh Govt likely wouldn't release 170s for Sprinters given that they plan to get rid of most of the latter. EMRs 156s and 158s aren't scrap either.So it’s ok to take TfW’s units so long as they are replaced with brand new units but Northern must have them replaced with 3rd hand scrap.
The subject of Northern’s 170’s keeps cropping up and again people seem to have decided that they too should be heading to EMR because they are all working on unsuitable routes (untrue, in reality only the Harrogate line is unsuitable for high speed low accelerating units, Sheffield - Hull/Scarborough and Halifax - Hull is fine for them).
The problem with Northern’s 170’s actually stems from the 195 order. 25 of the 195’s were ordered as 2 cars meaning the 3 car units are too thinly spread out across the network to work the Harrogate line diagrams that the 170’s work. The 195’s should have been ordered as 3 and 4 car units as per the 331’s which would have allowed 3 car 195’s to work the Harrogate line and release the 170’s to move on to Leeds - Nottingham/Lincoln services alongside 3 car 195’s thus focusing the 170’s on the Leeds/Sheffield/Hull triangle of services. Of course if 4 car units had been ordered too then it would have prevented the requirement to double up 2 car sets on the Calder Valley therefore actually creating extra units for service as very few if any 195 services would need to be doubled up
What about EMR Sprinters as replacements?
Northern could get twenty-six 158s and eight 156s in exchange for sixteen 170s, which would allow a modest capacity boost on Northern (single 3-car Turbostars replaced with pairs of 15x) whilst allieviating EMR's shortages and allowing them to have a homogeneous regional fleet. It's a win-win
Why? Yet again why is EMR’s problem of having a homogenous fleet of 170’s Northern’s problem. This suggestion means pushing Northern’s average age up just as it is finally coming down. Imagine the outrage (including on this forum) if Northern replaced 2005 built class 170’s for 1988 built 156’s and 1991 built 158’s. What is wrong with EMR retaining some of their current 158 fleet until the planned 170’s can be released from Southern which doesn’t look like anytime soon.
Ok shall we flip this? Instead why don’t Northern take on EMR’s 170’s in exchange for some 156’s & 158’s. It’s no different but would no doubt be rebuffed.
Or how about EMR taking on TfW’s even smaller fleet of 170’s (12 units) working on stopping services. How ridiculous that must be if it’s ridiculous Northern having 16 units.
What about EMR Sprinters as replacements?
Northern could get twenty-six 158s and eight 156s in exchange for sixteen 170s, which would allow a modest capacity boost on Northern (single 3-car Turbostars replaced with pairs of 15x) whilst allieviating EMR's shortages and allowing them to have a homogeneous regional fleet. It's a win-win.
It wouldn't take much work to get them to the same spec as the rest of Northern's 15x; they already have TrainFX and seating of equal or greater quality to what's already on the fleet, so all that would presumably be needed would be new seating covers, carpets and paintwork.
But the end-gangwayed units are not compatible with each other for multiple working purposes, so that doesn't make sense either.
TOPS numbers were created for operational purposes, and not to make things look neat to enthusiasts - something which I accept even as an enthusiast who has never worked on the railways.
The issue really seems to be that too many TOCs have small fleets of 170s and posters on here don't want their local TOC to release them. This is apparent across other threads also, which I suppose speaks volumes for the regard the class is held.
How about EMR get your 170s and the North finally gets some electrification? New diesel trains are very unlikely.Absolutely. There should be no pure diesel units ordered from here on in. However the suggestions on here as with other previous threads is with EMR taking on 15 year old units from Northern in return for 30 year old units which bemuses me. That suggestion I note is not being made for Wales.
How about EMR get your 170s and the North finally gets some electrification? New diesel trains are very unlikely.
The real issue is that there are too many TOCs, each with their own ideas about fleet content. What would have been best is a single national operator with a handful of standardised designs, one for locals, one for medium distance semi-fasts, and one for long distance / high speed services. (Or diesel & electric versions of each).The issue really seems to be that too many TOCs have small fleets of 170s and posters on here don't want their local TOC to release them. This is apparent across other threads also, which I suppose speaks volumes for the regard the class is held.
The real issue is that there are too many TOCs, each with their own ideas about fleet content. What would have been best is a single national operator with a handful of standardised designs, one for locals, one for medium distance semi-fasts, and one for long distance / high speed services. (Or diesel & electric versions of each).
And diesel and electric versions should have been compatible - not like Northern's CAF units which look very similar but are completely incompatible with each other.
Interestingly, they managed to achieve that with 80x - a bi-mode unit can and often does haul (or shove) an EMU off the wires, though the EMU does have one engine for the hotel power.
yet Wales didI really don't think anyone's going to order a new DMU that can't easily be converted to a bi-mode or EMU.
yet Wales did
Even British Rail had multiple sourcing of rolling stock - admittedly more of it could work together and there were some large fleets but we there has been some standardisation of fleets between different TOCs. The fact that 450s and 350s don't work together is no more an issue than Scotrail's 158s don't work with GWRs 158s.The real issue is that there are too many TOCs, each with their own ideas about fleet content. What would have been best is a single national operator with a handful of standardised designs, one for locals, one for medium distance semi-fasts, and one for long distance / high speed services. (Or diesel & electric versions of each).
But the decision not to perpetuate diesel operations by buying yet more new diesel-only stock, thereby commiting the railway to another 30-40 years of their use is not about Wales, (or anywhere else in the former BR network), because rolling stock will mostly be moved around the whole network according to it's suitability and availability.Wales has next to no electrification, so is different from most of the rest of the UK.
But the decision not to perpetuate diesel operations by buying yet more new diesel-only stock, thereby commiting the railway to another 30-40 years of their use is not about Wales, (or anywhere else in the former BR network), because rolling stock will mostly be moved around the whole network according to it's suitability and availability.
Wasn't that before the commitments to phase out diesel operation?yet Wales did
yet imo they still should have procured bi modes the point is is that nothing is garuanteedWales has next to no electrification, so is different from most of the rest of the UK.