I slightly disagree here.
If you go back a few years when there were four tph Manchester to Leeds, that's 12 carriages per hour. If you ran it with four-carriage stock that would take you to 16 carriages; but that would cost way more than squeezing in a fifth path and sweating the assets. So 15 carriages it is/was. Now we theoretically have five-carriage/coach units four times per hour plus the Hull service (three carriages). Take out one of the runs to York and send that unit to Hull, and you still have a 33% increase in seating per hour (20 carriages instead of 15). That's quite good and would still contribute to modal shift while not overtaxing the railway.
As for the Edinburgh via ECML runs: do we need them? Do they need to be TPE? As far as I can tell the only new opportunity they offer is to people travelling from Huddersfield; Leeds has a direct XC service, York and Newcastle have direct XC and LNER services. Is there more value (now that we have bi-mode sets) in pulling that TPE path and extending one of LNER's Leeds terminators, if we want Leeds to have 2tph to Newcastle & Edinburgh?
But just to counter my own argument: TRU is based on four fast, two semi-fast (plus stoppers). I guess that reducing services will reduce the BCR. So to get electrification, does that mean running more services than really necessary?
The Edinburgh service actually made perfect sense given that TPE trains did get serviced at Craigentinny and that there's going to be some severe disruption in the coming years with WCML blockades north of Lockerbie. It gives those travelling from the NW to Scotland a direct service from Manchester to Edinburgh without changing trains of using RRB. However, given the rationalisation that is likely to take place - there is no need for that service to extend north of Newcastle - although I'd like to add the caveat that places such as Morpeth welcomed the extension and deserve a better service - one for the appropriate bodies to arrange and do XC or LNER really offer a good enough proposition to those locations?
Onto the North route frequency, even though 5 cars were in operation early in 2020, there were still overcrowding issues on the peaks and when events were on, notably Friday's too. While the commuter market will decrease, there's still a want to have fast and frequent service on the core route and leisure will be a driving force in how the railway recovers. There's too much short-term thinking in the railway and on here, that's why I like TRU's ambition of 4 fasts and 2 semi-fasts on the core route - it provides a fast and frequent service and make rail the quickest way of getting city to city.
Stripping a TPE service between Leeds and York for a LNER service out is also barmy given passenger flows. Who does that really benefit? If you travelling north from south of Doncaster you'd get a service not going through Leeds. Wakefield and Leeds already have an XC service too - all it would be used for is diversionary routes. If you're going to strip a service out, I'd say the Blackpool service would go and terminate at Leeds, especially if Neville Hill to Church Fenton is wired - why run diesel services under wires when TPE can pick up one of the intermittent stops? Also, as I posted on the Castleford thread, there's a great opportunity with the restoration of platform 2 at Castleford to run an hourly service Manchester - Huddersfield - Wakefield - Castleford - York should one of the services be stripped out.
I can’t see any new fleet being ordered for a very long time. Look to how this whole route will evolve over the next 15-20 years. There is a big chance the intercity element of Manc-Leeds services won’t even include Liverpool. Think electrification & TRU and HS2 western branch with no connection to Liverpool.
Disagree, should TRU be signed off with full electrification, you don't want to be running diesel services under entire stretches of wires. It would be the perfect opportunity for TPE's North route to have a single fleet of trains (80x - be that electric or bi-mode) with bi-modes taking on the services to Hull/Scarborough. NPR isn't likely to be around until the 2040's and even so, the 802's can run at 140mph which is what I imagine that NPR will strive to be. Also an opportunity for local services to return to Northern with electric fleets.
Also, the 185's that are freed up could then go to Northern, potentially replacing the nigh 40 year old 15x's and given the depot locations at Ardwick and York this would make sense. I've always felt 185's would be great on the Settle/Carlisle route, along with the Blackpool - York services.