Graham Alexand
Member
Have anymore eVoRa's been delivered since Saturday?
You should try, people in Linlithgow kept asking for a Lothian Country service and they got it (all be it now its Withdrawn but still).Has there historically been any instances of customers requesting/suggesting route changes on social media and those changes actually being considered/implemented?
I wrote on LB's Facebook today suggesting a slight reroute of the N26 in order to better serve Wallyford and Prestonpans through the night as there are multiple housing developments in the area and a poor early morning/late evening service to compliment these developments.
Should I hold my breath hoping that these comments may be looked at or accept that there's not a snowball's chance in hell?
I have seen photos on Facebook of 3 heading north today.Have anymore eVoRa's been delivered since Saturday?
Saw bus 175 today, it has the normal Hanover dests now (same ones as 186-190)
Bus 9 was on the 36 today . I thought 171-175 would also serve the 36
It was not in service for a few days now, maybe it got its dest changed?Came here to post this myself as it just passed me on Niddrie mains. Could have sworn it had the other ones when I saw it last, ah well.
You should try, people in Linlithgow kept asking for a Lothian Country service and they got it (all be it now its Withdrawn but still).
Realistically you only have hope if what you’re suggesting costs little (or nothing) to implement. A small route change may sound easy to do... but if there’s not enough spare lag time or an extra bus/driver needs adding in it won’t happen. Unless of course there is proven demand ready and waiting or a housing developer is contributing.Has there historically been any instances of customers requesting/suggesting route changes on social media and those changes actually being considered/implemented?
I wrote on LB's Facebook today suggesting a slight reroute of the N26 in order to better serve Wallyford and Prestonpans through the night as there are multiple housing developments in the area and a poor early morning/late evening service to compliment these developments.
Should I hold my breath hoping that these comments may be looked at or accept that there's not a snowball's chance in hell?
Has there historically been any instances of customers requesting/suggesting route changes on social media and those changes actually being considered/implemented?
I wrote on LB's Facebook today suggesting a slight reroute of the N26 in order to better serve Wallyford and Prestonpans through the night as there are multiple housing developments in the area and a poor early morning/late evening service to compliment these developments.
Should I hold my breath hoping that these comments may be looked at or accept that there's not a snowball's chance in hell?
N26 used to do a loop around Port Seton so if that's what you suggested they bring back then I can see them considering it.
Strangely, they sighted the 20mph speed limit in town as the reason they stopped the loop...make of that what you will.
I think we'll see the 44 continue to use its current route with the 104 coming off the A1, going in as far as Fa'aside Avenue before turning round and using the new road (Futures Way?) to get over to the recycling plant.
I wouldn't like to be on any bus going round the new link road for the new houses. The speedbumps are full length ones, litter the full length of the road and are absolutely vicious!As more gets built around Wallyford then I think we'll see adjustments to the 44 and 113 to better serve the new housing towards the A1 junction to the west and south of Strawberry Corner on the east side.
I can see the 44 terminus changing and a loop into the west housing added and the 113 diverting through the housing near the new school
Ah cool. I thought something more like 124 route from Musselburgh then down either Shaw Road / Appin Drive to the normal 26 route.I had suggested a deviation from the current route at Levenhall Roundabout, following the 124 route into Prestonpans before turning down Prestongrange Road and rejoining the route on Prestonpans High Street.
Having since checked the timetable myself, I've noticed that there is indeed little slack so sadly it's doubtful that anything can come of this.
A shame, as it will be a while before the developments are completed/large enough to warrant dedicated bus links.
Also, Futures Way is complete however is not open and has been in this state for nearly 2 years. I'm unsure as to why it has not yet opened but what is a massive shame is that when the road does open, it's littered with speed bumps which is understandable outside the school, but not the whole way around.
And you’ll probably find that Lothian/East Coast actually refuse to send any buses around there until this issue is rectified. As per usual designers not taking buses into account in their plans.I wouldn't like to be on any bus going round the new link road for the new houses. The speedbumps are full length ones, litter the full length of the road and are absolutely vicious!
Saw bus 175 today, it has the normal Hanover dests now (same ones as 186-190)
I prefer these dests to the high density ones, personally look much smarter. I saw it earlier and took a picture from inside a bus but due to the window being wet it didn't come out very well. Thanks for the photo. It might've been you driving, it was around Half 3Got it for this evening - shame they've replaced the high density unit as I thought it looked quite good.
![]()
I wouldn't like to be on any bus going round the new link road for the new houses. The speedbumps are full length ones, litter the full length of the road and are absolutely vicious!
Ah cool. I thought something more like 124 route from Musselburgh then down either Shaw Road / Appin Drive to the normal 26 route.
Yeah cycled up both sides of Futures way during lockdown. Rather confused why its not been opened as it would remove traffic from passing through Wallyford. Lots of locals seemed to skirt the fencing when walking their dogs but didn't fancy it on the bike / couldn't see a way through.
I've been along once on the push bike, you can squeeze round the back of the sub stations at each of the two blockades but the combination of that and the fierce bumps meant it was the first and last time I'll go along that way!I had to get to the new school on several occaisions for the local resiliance team and those bumps are awful -even at a crawl the van bounced badly on them
I think folk are not sure whether it's actually an open public road or not (and it's been blocked on and off over the last months) - If people want to bypass Wallyford the A1 is still the better option (especially with those bloody speedbumps!)
Have anymore eVoRa's been delivered since Saturday?
I notice 81 and 82 both have live trackers and are showing at seafield. Can anyone from longstone confirm if they’ve heard anything or have any new buses there yet?
I wonder if these will be switched off soon? I believe bus 73 was turned on for a bit as when you type it up nothing comes up, however for bus 74 + it still comes up at the equator.I notice 81 and 82 both have live trackers and are showing at seafield. Can anyone from longstone confirm if they’ve heard anything or have any new buses there yet?
Apologies, may you reword this, I don't understand.
They are coming up in threes or fives and are being prepared as they arrive.The forthcoming single deck buses for Lothian was what I was referring to.
Why would we switch the trackers off? after a vehicle is demobilised, the trackers have a battery in them to keep them live for a few days.I wonder if these will be switched off soon? I believe bus 73 was turned on for a bit as when you type it up nothing comes up, however for bus 74 + it still comes up at the equator.
there are a few on site now.I notice 81 and 82 both have live trackers and are showing at seafield. Can anyone from longstone confirm if they’ve heard anything or have any new buses there yet?
Inner parts are Gemini (B7), outer parts are Gemini 2 (B9)Sorry to bring up 20942/942/whatever you want to call it again - as it was (I think?) rebuilt using the roof of a B7TL does it have the upper rear end of a Gemini 1 or were parts used to complete it to the original updated style rear?
Inner parts are Gemini (B7), outer parts are Gemini 2 (B9)

It was there before going to ECB, presume it was the one freed by 20942s return?850 is at LCB for the Amazon Contract, will it remain at LCB once the Contract is over or move back to Marine? https://www.flickr.com/photos/blaircamerontransport/50576621611/in/pool-3426208@N20/
(not my photo)
It was there before going to ECB, presume it was the one freed by 20942s return?
That would certainly lengthen it's allocation history of LB, LMC, LCB, ECB, LMC and possibly LCB again!
850 is at LCB for the Amazon Contract, will it remain at LCB once the Contract is over or move back to Marine? https://www.flickr.com/photos/blaircamerontransport/50576621611/in/pool-3426208@N20/
(not my photo)
If that were true then ECB would have a fleet made up mostly of buses new to ECB, and the 2010 Gemini Twos would be the oldest by 7 years, despite only being 11 years old (by next year), which is pretty good going.Canteen talk, i know, but ive heard the large vehicle order due next year is going to include 8-10 for ECB.
Allowing their allocation of LMC branded vehicles to go back to Lothian with most being repainted and a few being kept for LMC.