"Fill-in" electrification ideas.

Status
Not open for further replies.

43096

On Moderation
Joined
23 Nov 2015
Messages
18,782
Yes - huge win. It was top of the list in the Julian Worth article and presentation in terms of diesel to electric conversion per mile of route sparked up. Not sure of what the cost per mile would be though - north of 2 million quid per mile easily I would have thought.
Agreed. That and Felixstowe ought to be a priority.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
I hope you are right I really do. Then again, I didn’t think Preston to Manchester would be as eye wateringly expensive as it was. I assume the area is well north of the old salt mines?
The potential subsidence around Northwich would could cause problems if one was to contemplate electrifying the ex-CLC line between Knutsford and Greenbank, but such a proposal should be kicked into the long grass, as this line is primarily used by freight, with a sparse passenger service.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,759
Bimodes go onto the scotland route normally in times of disruption for diversions. Hence why about once every 6-8 weeks, the Chester &NWC services get cut back to Crewe.

Voyagers go on the route in time of disruptions. That ma6 not be the case for the bimodes.
 

Jack Hay

Member
Joined
18 Aug 2016
Messages
298
I hope you are right I really do. Then again, I didn’t think Preston to Manchester would be as eye wateringly expensive as it was. I assume the area is well north of the old salt mines?
Yes it is. It's HS2 which is proposed to be built acorss the old salt beds!
 

markymark2000

On Moderation
Joined
11 May 2015
Messages
5,100
Location
Great Britain
Voyagers go on the route in time of disruptions. That ma6 not be the case for the bimodes.
But it likely will though. Why would that change? They need a diesel train for diversions, and Voyagers currently fill that but the Bimodes are replacing the Voyagers and thus their current duties on the railway.

Unless you intend on electrifying all the WCML diversion routes, you cut trains back and don't run them at times of disruption, you will need another form of power. Batteries & hydrogen etc aren't due to be in use on the Pendos or the new trains and thus you will need diesel power to get the train where it's going on non electrified lines.
 

Jack Hay

Member
Joined
18 Aug 2016
Messages
298
The potential subsidence around Northwich would could cause problems if one was to contemplate electrifying the ex-CLC line between Knutsford and Greenbank, but such a proposal should be kicked into the long grass, as this line is primarily used by freight, with a sparse passenger service.
That line (Stockport to Chester) was ranked 4th best candidate for electrification out of the 32 un-electrified lines in the north of England, i.e. very high ranking, in the Northern Sparks Electrification Taskforce report in 2015. Manchester-Warrington-Liverpool was 2nd, Calder Valley was 1st.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,309
As a matter of interest, does the track layout at Felixstowe and Thames Gateway (and any other freight terminals where electrification might happen) allow the train to get to the container crane sidings without the wires and cranes getting muddled or are some track changes needed?
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
As a matter of interest, does the track layout at Felixstowe and Thames Gateway (and any other freight terminals where electrification might happen) allow the train to get to the container crane sidings without the wires and cranes getting muddled or are some track changes needed?

There's no way to avoid the wires and cranes getting muddled (actually, technically there is, if you used an massive traverser) so you always need some form of shunting to account for the fact there's no way to move an AC loco on OLE through the loading area.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs
There's no way to avoid the wires and cranes getting muddled (actually, technically there is, if you used an massive traverser) so you always need some form of shunting to account for the fact there's no way to move an AC loco on OLE through the loading area.
Battery shutters?
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,634
Location
Hope Valley
As a matter of interest, does the track layout at Felixstowe and Thames Gateway (and any other freight terminals where electrification might happen) allow the train to get to the container crane sidings without the wires and cranes getting muddled or are some track changes needed?
This is a real issue that is often glossed over. Obviously you can't have wires under the 'cranes' so you then end up with separate site shunting locomotives with all of the (un)coupling, brake tests, stabling point and so forth. These cost money (up front and ongoing), waste time, reduce terminal capacity and increase safety/performance risks.

Bi-mode locomotives with 'last mile' off-wire capability can help here but are themselves more expensive, require more training, are possibly slower when off the wire, etc.

For very short freight branches (possibly including London Gateway but also Tilbury2, Seaforth, East Midlands Gateway, Birch Coppice and so on in due course) it may well not be worth the trouble of designing and managing a wiring 'project' when there are other more straightforward routes to be done.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,309
This is a real issue that is often glossed over. Obviously you can't have wires under the 'cranes' so you then end up with separate site shunting locomotives with all of the (un)coupling, brake tests, stabling point and so forth. These cost money (up front and ongoing), waste time, reduce terminal capacity and increase safety/performance risks.

Bi-mode locomotives with 'last mile' off-wire capability can help here but are themselves more expensive, require more training, are possibly slower when off the wire, etc.

For very short freight branches (possibly including London Gateway but also Tilbury2, Seaforth, East Midlands Gateway, Birch Coppice and so on in due course) it may well not be worth the trouble of designing and managing a wiring 'project' when there are other more straightforward routes to be done.
It isn't insurmountable though is it, the trick appears to be to 'reverse in' / get dragged into the relevant transfer siding with the container crane above - my point was whether the track layout at the relevant terminals allows whatever form of operation exists at Mossend, Daventry, Trafford or any of the other places where electric-hauled container freight trains already happen.
 

Non Multi

Member
Joined
11 Dec 2017
Messages
1,191
AC loco with a permanent battery tender for yard work. Would be recharged by running under the wires.
 

markymark2000

On Moderation
Joined
11 May 2015
Messages
5,100
Location
Great Britain
That line (Stockport to Chester) was ranked 4th best candidate for electrification out of the 32 un-electrified lines in the north of England, i.e. very high ranking, in the Northern Sparks Electrification Taskforce report in 2015. Manchester-Warrington-Liverpool was 2nd, Calder Valley was 1st.
Like... How. I don't get how that is high up on the list. That's bonkers. Surely there has to be better lines out there to do which would have a bigger impact, not a little 1tph line with not much potential for increQuite a few bridges to contend with and the the Northwich viaduct.

They're not replacing the Voyagers on a like for like basis - the 7 car Hitachi units are straight electric, not bimode.
So if alternative power is needed due to diversions, there will be more strain on the bimodes so in theory, Chester and the NWC is more likely to have cuts than it was before as a result of the reduced amount of diesel trains.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
So if alternative power is needed due to diversions, there will be more strain on the bimodes so in theory, Chester and the NWC is more likely to have cuts than it was before as a result of the reduced amount of diesel trains.

It's more likely that they don't try to run diverts and simply just bus passengers instead
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
On freight yards with cranes, assuming that there's space could you not:
- loco 1 pulls train into a holding area
- loco 2 couples up
- loco 1 uncouples and moves out the way - loco 2 pushes wagons into loading/unloading area
- loco 1 moves to be in position to become loco 2 for next train
- loco 2 pulls train onto mainline to take the train where it's going

Clearly not ideal for low frequency services, but could work well for the large container ports.

How viable would a system which looked a bit like that uses on a lot of rollercoasters (chain drive to drag up inclines and use gravity to run downhill and breaking sections where needed), that would be going back to some of the early trackway systems but probably only using small level changes (reducing the risk of significant incident).
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
It's more likely that they don't try to run diverts and simply just bus passengers instead

There's not exactly an extensive number of diesel only diversionary routes in use by Avanti now a number of the older diversionary routes around Manchester have been electrified - it's a little surreal to think of some of the places we used to see a Class 57 dragging a Class 390 set - Chorley, Lostock etc, now fully electrified with the occasional Pendolino diversion operating on electric.
 

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,577
Crewe to Chester. There is absolutely no reason for it to not be electrified.
This one seems an obvious win especially as it's almost all plain line, the complex bits at Crewe are already in place due to the Electric depot.
 

Jack Hay

Member
Joined
18 Aug 2016
Messages
298
Like... How. I don't get how that is high up on the list. That's bonkers. Surely there has to be better lines out there to do which would have a bigger impact, not a little 1tph line with not much potential for ...
If you want to understand it, read the report - I did. Here it is https://transportforthenorth.com/wp-content/uploads/EFT_Report_FINAL_web.pdf . The basic reason seems to be that Stockport-Chester serves areas with little alternative public transport, there is suppressed demand because the existing service is so slow, and with so many station stops, electric will produces a decent journey time improvement. Regarding it being a '1tph line', you are overlooking that it is really a 2tph line. Two trains per hour is the minimum service requirement written into the Northern franchise, which has never been delivered owing to unsolved line capacity issues in south Manchester. The business case for 2tph was made at the time of the last franchise change. So it is a busier line with more potential than you may think.
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,460
Location
Northern England
The business case for 2tph was made at the time of the last franchise change. So it is a busier line with more potential than you may think.
Indeed.

There's also a case being made for a new station on that line at Cheadle, and by what I've seen of the buses there, there seems to be plenty of demand into Manchester. I'd reckon on electric a 15-20 minute journey into Manchester would be achievable (it's only about 20 on diesel from Navigation Road as is) which is extremely competitive with the buses, especially in the peak when they get stuck in traffic through Didsbury and Fallowfield.
 

BayPaul

Established Member
Joined
11 Jul 2019
Messages
1,514
Crewe to Chester. There is absolutely no reason for it to not be electrified.
The big future advantage of that would be that Chester trains could then use HS2 to reach London, which would further increase capacity of the WCML as well as speeding up journeys to Chester. Not an easy stretch to do with the number of bridges however as others have said, and it would presumably mean the end of through services from Holyhead to London.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,675
The big future advantage of that would be that Chester trains could then use HS2 to reach London, which would further increase capacity of the WCML as well as speeding up journeys to Chester. Not an easy stretch to do with the number of bridges however as others have said, and it would presumably mean the end of through services from Holyhead to London.
Which HS2 train is being diverted to do that though?
 