sem34090

Member
Joined
12 Sep 2018
Messages
30
Location
Where summer comes soonest!
You expect them to have train crew - Guards?!

You're hopeful, given the DfT's apparent love affair with DOO over recent years, albeit currently very quiet. As some have said we might not even get drivers; They cost money.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
You expect them to have train crew - Guards?!

You're hopeful, given the DfT's apparent love affair with DOO over recent years, albeit currently very quiet. As some have said we might not even get drivers; They cost money.

Whilst they do cost money, on a 400m train with seats for 1,100 passengers the cost per passenger traveling (especially with journey times of just over an hour between London and Manchester) is significantly less than it is with the current trains (a 9 coach and an 11 coach 390 have 1,048 seats between them).

Shortening the round trip times from 5 hours to 3 hours per set (i.e. time taken to travel from London to Manchester, back and be ready to go again) and with (say) 50% more passengers per train and your staffing costs fall by 60% per passenger.

Other routes may not reduce by that much, but the savings are likely to be significant.

Yes you'd save more by getting rid of them, however I suspect not all that much.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
At average adult walking speed the distance would take 6 minutes, add a couple of minutes for the driver tasks

It does not take 6 minutes to walk 200m, or even the length of a pendolino. Even if it was a 400m train, that would be a sedate 20-25 seconds to walk past each carriage. On a 200m, 8-car train it will take 2.5 to 3 mins to walk.

You’re also forgetting the important fact that NPR is not about getting from Liverpool to Leeds in the fastest time possible, or the highest frequency. It is about getting from Liverpool or Leeds to Manchester in the fastest time possible with the highest frequency.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,713
Standard values tend to be 5 minutes for an 800 or HST if two drivers, 7 or 8 without for a reversal. Less if its a DMU/EMU.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,010
Location
London
From a Manchester perspective, if NPR is to be a reversal in Piccadilly, I think the sensible solution has been taken. However 6 platforms for 15 tph? Is that not asking for trouble?

2.5 movements per hour. That's quite luxurious spacing in some places!
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
2.5 movements per hour. That's quite luxurious spacing in some places!

South Eastern Javelins (which I would imagine very similar in operational nature to NPR) manage about 8tph on 3 platforms in the peak at St. Pancras.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,010
Location
London
You expect them to have train crew - Guards?!

You're hopeful, given the DfT's apparent love affair with DOO over recent years, albeit currently very quiet. As some have said we might not even get drivers; They cost money.

I wouldn't be surprised if they didn't, but I might expect some sort of "OBS" type considering these are reasonably long-distance journeys.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
South Eastern Javelins (which I would imagine very similar in operational nature to NPR) manage about 8tph on 3 platforms in the peak at St. Pancras.

But NPR is asking for 10 tph on 2 platforms. It might work if only the London terminate (1 platform managing 1.5tph) therefore requiring the use of 2 platforms, with NPR using the other 4 platforms to manage 12 services (Birmingham continuing on to Leeds).
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,643
Location
"Marston Vale mafia"
Oh no, I think the reverse option is the best option. What sort of time penalty for reversing do you think will take place to make travelling on high speed lines irrelevant?

Given how major a destination Manchester is you're going to need a reasonable dwell time there. If you have a relief driver/guard stood waiting, the time penalty for a reversal should be small.

== Doublepost prevention - post automatically merged: ==

I wouldn't be surprised if they didn't, but I might expect some sort of "OBS" type considering these are reasonably long-distance journeys.

I would be astonished to see a long distance train without a second member of staff of any kind.

I strongly suspect they won't operate the doors, but that's really neither here nor there.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
Given how major a destination Manchester is you're going to need a reasonable dwell time there. If you have a relief driver/guard stood waiting, the time penalty for a reversal should be small.

Which means a reversal has very little impact on the passengers travelling between Liverpool & Leeds. To be fair, most will be boarding in Manchester at either station anyhow.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,981
I appreciate that the consultation for 'Phase 2b' now includes NPR, but is there any reason to suppose that has any effect on the Birmingham to Leeds stretch (as Lord Adonis did?)? I've just read a summary of the consultation 'refinements' and it seems as though the eastern route from Brum has no significant changes. Doesn't that just mean that no changes are planned?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,874
I appreciate that the consultation for 'Phase 2b' now includes NPR, but is there any reason to suppose that has any effect on the Birmingham to Leeds stretch (as Lord Adonis did?)? I've just read a summary of the consultation 'refinements' and it seems as though the eastern route from Brum has no significant changes. Doesn't that just mean that no changes are planned?

The announcement suggests that the Western leg will have a separate hybrid bill, to be progressed ASAP. The implication is that the bill for the eastern leg will have to follow at a slower pace.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,895
The junction just before the HS2 tunnel is the provision for North East & Leeds services to access the Piccadilly HS2 platforms, then reverse out towards the Airport and Liverpool (or even Birmingham).
Yes, that's right. I should have clarified my comment was responding to the suggestion that the eastern leg was going to be canned and all HS2 eastern leg services routed via Manchester, including those to London. But 6 platforms at Piccadilly won't be near enough capacity to do this, and the Birmingham - Manchester line would be overloaded.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Yes, that's right. I should have clarified my comment was responding to the suggestion that the eastern leg was going to be canned and all HS2 eastern leg services routed via Manchester, including those to London. But 6 platforms at Piccadilly won't be near enough capacity to do this, and the Birmingham - Manchester line would be overloaded.

That would probably depend on whether *all* Eastern leg services would be re-routed in such a scenario. Whereas Leeds-NPR-Manchester-HS2-Euston would be reasonably attractive compared to (and still faster than) the ECML and you could see Leeds services being re-routed, York-Leeds-NPR-Manchester-HS2-Euston would likely be slower than a non-stop run to King's Cross.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,895
That would probably depend on whether *all* Eastern leg services would be re-routed in such a scenario. Whereas Leeds-NPR-Manchester-HS2-Euston would be reasonably attractive compared to (and still faster than) the ECML and you could see Leeds services being re-routed, York-Leeds-NPR-Manchester-HS2-Euston would likely be slower than a non-stop run to King's Cross.
Even if only the Leeds services were to be diverted via Manchester, that would still double the number of reversing services in the HS2 Piccadilly platforms. If the revised plans were calling for 8 or more platforms there would be a stronger suspicion that this was being planned. As they stand the plans look adequate for NPR reversals but no more.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,302
Location
Bolton
The announcement suggests that the Western leg will have a separate hybrid bill, to be progressed ASAP. The implication is that the bill for the eastern leg will have to follow at a slower pace.
I get the impression that the government would like to see the Western Leg bill pushed through before the election, though its receiving Royal Assent in time may be difficult given the time taken up now by Covid-19 legislation. To me, it appears that this is a tacit admission that there's to be no Eastern Leg bill in this Parliament. Of course, an incoming government can still promise such a bill, which is why I see the way Lord Adonis put it as wrong.

== Doublepost prevention - post automatically merged: ==

Even if only the Leeds services were to be diverted via Manchester, that would still double the number of reversing services in the HS2 Piccadilly platforms. If the revised plans were calling for 8 or more platforms there would be a stronger suspicion that this was being planned. As they stand the plans look adequate for NPR reversals but no more.
If changing trains at either Manchester or Crewe saved 10 or 15 minutes for a Leeds to London journey that was on NPR or HS2 infrastructure throughout, or nearly throughout, but existing direct Leeds to London services were also maintained, I imagine only a small portion of travellers would switch, which would be quite possible for what capacity is available in Manchester to cope with. Through trains running that way doesn't seem terribly likely unless Manchester and Leeds are to share capacity which rather defeats the point.
 
Last edited:

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
@quantinghome and @Ianno87 On first inspection Leeds to London via Manchester seems a complete non-starter, but perhaps the devil is in the detail here. The NPR proposal is for 4 tph Manchester to Liverpool and 6 tph to Manchester to Leeds. The question is how will those 4 Liverpool and 6 Leeds services link up and what happens to the 2 additional Leeds trains?

We might see all 4 Liverpool trains continue to Leeds, with the additional Leeds services terminating at Piccadilly. We could see those 2 additional Leeds services continue to Birmingham, using a 200m unit. But if it is going to Birmingham, could it go to London instead? I think that would be problematic given that the train would likely need to be 400m and travel through Huddersfield (I predict NPR services will be operational long before any new line is ever built - TPE is NPR but on Victorian infrastructure). A London service would probably need to be in addition to the 3 Manchester and 2 Birmingham services.

There is also a question about the MML and IF the line is electrified and linked to HS2 via an electrified Derby-Birmingham line, could that be a faster route to London from Leeds than the ECML and via Manchester? So the most logical situation to me might be for the 6 Manchester-Leeds NPR services to consist of:
  • 2 tph Birmingham-Manchester-Leeds-York-Newcastle (1 tph continues to Edinburgh)
  • 2 tph Liverpool-Manchester-Leeds-York-Newcastle (1 tph continues to Edinburgh)
  • 1 tph Liverpool-Manchester-Leeds-Hull
  • 1 tph Liverpool-Manchester-Leeds-York-Middlesbrough
Current XC services will disappear too.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,874
There is also a question about the MML and IF the line is electrified and linked to HS2 via an electrified Derby-Birmingham line, could that be a faster route to London from Leeds than the ECML and via Manchester? So the most logical situation to me might be for the 6 Manchester-Leeds NPR services to consist of:
  • 2 tph Birmingham-Manchester-Leeds-York-Newcastle (1 tph continues to Edinburgh)
  • 2 tph Liverpool-Manchester-Leeds-York-Newcastle (1 tph continues to Edinburgh)
  • 1 tph Liverpool-Manchester-Leeds-Hull
  • 1 tph Liverpool-Manchester-Leeds-York-Middlesbrough

That’s not good for Derby / Chesterfield / Sheffield to Leeds and North thereof.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
I assume the freight operators have something to say about adding all the Carlisle to Annandale ECS onto the two track bit, even if it is short?
Shame at not having a through Manchester station, but the Ardwick link presumably means the case for Liverpool-Manchester NPR is pretty good as it could be used by TPE/NPR going on via Guide Bridge with little extra building. But mean Stalybridge being realigned AGAIN!
 

ABB125

Established Member
Joined
23 Jul 2016
Messages
4,345
Location
University of Birmingham
There's a BBC article here about the proposed stabling facility.
BBC News - High-speed train 'stabling' facility proposed near Gretna
A high-speed train "stabling" facility - creating up to 100 jobs - could be constructed in southern Scotland.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,713
I assume the freight operators have something to say about adding all the Carlisle to Annandale ECS onto the two track bit, even if it is short?
Shame at not having a through Manchester station, but the Ardwick link presumably means the case for Liverpool-Manchester NPR is pretty good as it could be used by TPE/NPR going on via Guide Bridge with little extra building. But mean Stalybridge being realigned AGAIN!
FOCs will have to petition against it in the hybrid bill as I doubt it would sit in any protective provisions.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
I assume the freight operators have something to say about adding all the Carlisle to Annandale ECS onto the two track bit, even if it is short?

If its just some early trains starting at Carlisle and heading south, and/or late trains from Euston terminating at Carlisle then heading to the depot, then arguably no more of a capacity load than the standard hour passenger service. In fact its possibly better as the entire train could head to depot from Carlisle as a complete 400m train in one path, rather than a 200m train to each of Edinburgh and Glasgow needing two paths.

== Doublepost prevention - post automatically merged: ==





NEW POST about Terminal vs Through stations:

Great thread just appeared on Twitter explaining how it's not nearly as simple as "Through stations are better than terminal stations". Recommend reading all the way through: https://twitter.com/WilliamBarter1/status/1314241848265904130?s=20

Through stations versus terminal station? Through stations sound attractive for many reasons, but the reality is not so clear. And you can’t ignore costs.
 
Last edited:

ABB125

Established Member
Joined
23 Jul 2016
Messages
4,345
Location
University of Birmingham
NEW POST about Terminal vs Through stations:

Great thread just appeared on Twitter explaining how it's not nearly as simple as "Through stations are better than terminal stations". Recommend reading all the way through: https://twitter.com/WilliamBarter1/status/1314241848265904130?s=20
Very interesting, I agree with quite a lot of it. The moral of the story is, "it depends". As with so much in life, there's no black or white answer.
One thing that he's possibly not mentioned is that HS2 trains, with 400m of passengers to board/alight, will no doubt need 5 or 10 minutes' dwell. However, shorter (200m?) NPR trains, possibly with a more "commuter" layout, perhaps need less time (or rather, don't need as much), so could probably cope better.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
If its just some early trains starting at Carlisle and heading south, and/or late trains from Euston terminating at Carlisle then heading to the depot, then arguably no more of a capacity load than the standard hour passenger service. In fact its possibly better as the entire train could head to depot from Carlisle as a complete 400m train in one path, rather than a 200m train to each of Edinburgh and Glasgow needing two paths.
AIUI it is a load of the trains dropping a unit at Carlisle and that unit popping to the depot?
i had thought that the units were splitting to go to both Glasgow and Edinburgh though
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,693
Location
Nottingham
That would probably depend on whether *all* Eastern leg services would be re-routed in such a scenario. Whereas Leeds-NPR-Manchester-HS2-Euston would be reasonably attractive compared to (and still faster than) the ECML and you could see Leeds services being re-routed, York-Leeds-NPR-Manchester-HS2-Euston would likely be slower than a non-stop run to King's Cross.
Having worked this through I think there's enough capacity for Birmingham-Manchester trains to be lengthened and extended to Leeds (possibly splitting in Manchester if NPR won't take 400m trains, although that introduces problems of its own). But London-Manchester trains are proposed to be 400m so they can't be lengthened to take London-Leeds passengers too, and there isn't capacity to run any more trains between the Birmingham junctions and Crewe.

My feeling is that a better package might be a mini-Y network going south from Leeds, with one leg to Sheffield and the other joining the ECML somewhere south of Doncaster. This could use some of the alignment of the eastern leg and might also have a link towards York. It would speed up London-ECML-Leeds trains (possibly those going further north too) as well as providing better fast service between Sheffield and Leeds including Cross Country. The East Midlands could have a connection off HS2 onto the Birmingham-Derby line in the Tamworth area, an upgrade of the Stenson to Sheet Stores line and an east-west bypass of the Trent junctions with electrification throughout, to accelerate services from London and Birmingham to Derby/Sheffield and Nottingham.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,348
One thing that he's possibly not mentioned is that HS2 trains, with 400m of passengers to board/alight, will no doubt need 5 or 10 minutes' dwell. However, shorter (200m?) NPR trains, possibly with a more "commuter" layout, perhaps need less time (or rather, don't need as much), so could probably cope better.

Assuming your platforms are large enough, the length of train should make little difference to the time to disembark and embark passengers.
 