Mcr Warrior
Veteran Member
- Joined
- 8 Jan 2009
- Messages
- 17,327
Not talking here about replacing track on already open routes, or doubling what was previously just a single track, etc., but instead what is effectively completely "new" track (or at the very least the re-opening of a closed line where the track had previously been lifted).