DynamicSpirit
Established Member
Moderator note: Split from https://www.railforums.co.uk/thread...increase-to-£200m.201452/page-16#post-4615482
So putting all this together, it seems to me like a reasonable aspiration for Ely would be:
Wisbech would then inevitably come behind all those in priority. So from the point of view of those hoping for a Wisbech re-opening, I guess the hope would be that making capacity at Ely North for an additional 5-6 tph turns out not to be that much more expensive than making capacity for an extra 4-5tph, and it's therefore considered worthwhile future-proofing the eventual Ely upgrade by providing that extra capacity.
So putting all this together, it seems to me like a reasonable aspiration for Ely would be:
- Cambridge-Peterborough-Birmingham going from one to two tph
- Ipswich-Peterborough becoming hourly
- London-Kings Lynn becoming half-hourly by extending an existing London-Cambridge service, which I believe is a long standing aspiration
- Cambridge-Norwith becoming half-hourly. Actually I suspect, once East-West rail is built and given the size of Norwich, it won't be too long before we're looking for 2 fast trains and 1 slow train per hour on that route.
- More freight from Felixstowe. I have no idea how many currently run and how many a reasonable aspiration to run would be?
Wisbech would then inevitably come behind all those in priority. So from the point of view of those hoping for a Wisbech re-opening, I guess the hope would be that making capacity at Ely North for an additional 5-6 tph turns out not to be that much more expensive than making capacity for an extra 4-5tph, and it's therefore considered worthwhile future-proofing the eventual Ely upgrade by providing that extra capacity.
Last edited by a moderator:

