Moderator note: Split from https://www.railforums.co.uk/thread...pgrade-and-electrification-updates-cp6.88054/
I've quickly made a rough track diagram of what this could look like, taking into account what we already know about the Huddersfield to Westtown project:

By the way, if we're going to talk about Dewsbury, is the plan still to electrify through there as there was talk that the bridge was quite difficult to wire through (live wire at least) as re-decking it was difficult - From my point of view it looks very similar to the one at Bingley and that was wired through.
Is there any reason why it can't be quad-tracked from Ravensthorpe to Dewsbury? (Mind you it might be difficult to get two fast lines in at Dewsbury). Operationally it'd be much better as a stopping train could be out of the way at Dewsbury before a fast train comes through.So, in essence, Dewsbury drops down to having 2 tracks, and Batley gets a 3rd track? Makes sense, given that Dewsbury's current function (of looping an eastbound Slow train to allow a Fast train to pass) can now be taken by Ravensthorpe; and of course completely separating Slow & Fast between Ravensthorpe & Huddersfield has its own advantages. Looping a westbound Slow at Batley to allow a Fast to pass then gives a pretty clear run to the separate tracks at Ravensthorpe too.
I've quickly made a rough track diagram of what this could look like, taking into account what we already know about the Huddersfield to Westtown project:

By the way, if we're going to talk about Dewsbury, is the plan still to electrify through there as there was talk that the bridge was quite difficult to wire through (live wire at least) as re-decking it was difficult - From my point of view it looks very similar to the one at Bingley and that was wired through.