• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Open access WCML proposals from Marylebone

Status
Not open for further replies.

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
I couldn't help but wonder...when East-West rail has eventually opened between Aylesbury Vale Parkway and Bletchley...

Does anybody think we'll see the Ian Yeowarts of the world apply to run open access services from Marylebone up the WCML using bi-modes in order to get past ORR abstraction regulations?

Stranger things have happened, after all...
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
It won't, it will free up capacity, which is a very large part of the point of it. Euston HS2 is basically a new station next to the existing one.
Oh dear. Evidently I need to revise this area of the rail syllabus.

Apologies, I still thought that the Euston redevelopment had had the brakes put on it.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,262
Oh dear. Evidently I need to revise this area of the rail syllabus.

Apologies, I still thought that the Euston redevelopment had had the brakes put on it.

It has.
So we get a brand new HS2 station next to essentially the existing Euston station, rather than a new station for all.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
Oh dear. Evidently I need to revise this area of the rail syllabus.

Apologies, I still thought that the Euston redevelopment had had the brakes put on it.

Yes, the redevelopment has, this would have had the whole station rebuilt. What's happening instead is that the existing station is staying as it is, but a new station is being built next to it for HS2. There will be some tweaking and connecting up of the two, but HS2 trains will not serve the "new" Euston and the approaches will be totally separate (at quite substantially different vertical heights). It'll look like many large airports where you have Terminal 1 right next to Terminal 2, built at different times, with a walkway between them and a different "look and feel" in each.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
Yes, the redevelopment has, this would have had the whole station rebuilt. What's happening instead is that the existing station is staying as it is, but a new station is being built next to it for HS2. There will be some tweaking and connecting up of the two, but HS2 trains will not serve the "new" Euston and the approaches will be totally separate (at quite substantially different vertical heights).
Ah, I see, thanks. I still remember the (justified) wailing and gnashing of teeth when someone said that trains from Scotland would be terminating at Queen's Park, which stuck in my memory; I'm glad the new station for HS2 will be built.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
Ah, I see, thanks. I still remember the (justified) wailing and gnashing of teeth when someone said that trains from Scotland would be terminating at Queen's Park, which stuck in my memory; I'm glad the new station for HS2 will be built.

Re HS2 you're probably thinking of Old Oak Common, and yes, I too think this would be a silly idea :)
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
A bit more on-topic for the thread, rather than Marylebone it was briefly proposed that Queen's Park could be used for classic WCML open access services but was later found that there was enough capacity for these at Euston even with 2 platforms (17-18) out of use for HS2 construction.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
A bit more on-topic for the thread, rather than Marylebone it was briefly proposed that Queen's Park could be used for classic WCML open access services but was later found that there was enough capacity for these at Euston even with 2 platforms (17-18) out of use for HS2 construction.
I remember that with GNWR's Blackpool application.

A reopened link between Aylesbury and Bletchley could prove useful in case of engineering works south of Bletchley, providing an alternative route to the Pentonville/Euston/Marylebone Road from the WCML. I wondered if an open access operator might choose to try and get a bi-mode application from Marylebone up to the WCML and to points further beyond; undoubtedly pie-in-the-sky stuff, but possibly a way of sneaking additional station stops, such as were removed from the Grand Central application to run to Blackpool (namely Tamworth, Lichfield Trent Valley, Crewe and Hartford), through the ORR vetting process.

Running Marylebone-High Wycombe-Aylesbury-Milton Keynes-Tamworth-Lichfield-Crewe-Hartford to a major northern city might make for an extremely lengthy service (and would likely be difficult to path through Little Kimble!) but could be an avenue potentially explored by a company such as Alliance who could argue that they were providing new transport links that were not "predominantly revenue abstractive" to Avanti or London Northwestern. It did cross my mind that they might attempt it, even thought it would be very likely to fail.
 

Jorge Da Silva

Established Member
Joined
4 Apr 2018
Messages
2,641
Location
Cleethorpes, North East Lincolnshire
I remember that with GNWR's Blackpool application.

A reopened link between Aylesbury and Bletchley could prove useful in case of engineering works south of Bletchley, providing an alternative route to the Pentonville/Euston/Marylebone Road from the WCML. I wondered if an open access operator might choose to try and get a bi-mode application from Marylebone up to the WCML and to points further beyond; undoubtedly pie-in-the-sky stuff, but possibly a way of sneaking additional station stops, such as were removed from the Grand Central application to run to Blackpool (namely Tamworth, Lichfield Trent Valley, Crewe and Hartford), through the ORR vetting process.

Running Marylebone-High Wycombe-Aylesbury-Milton Keynes-Tamworth-Lichfield-Crewe-Hartford to a major northern city might make for an extremely lengthy service (and would likely be difficult to path through Little Kimble!) but could be an avenue potentially explored by a company such as Alliance who could argue that they were providing new transport links that were not "predominantly revenue abstractive" to Avanti or London Northwestern. It did cross my mind that they might attempt it, even thought it would be very likely to fail.

two problems capacity north of MKC and Non-primary abstractive test.
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
two problems capacity north of MKC and Non-primary abstractive test.
Given as Alliance applied to run trains down the SWML to Southampton, I don't think they're concerned about capacity. And surely the entire point of this admittedly bizarre routeing would be to get it past the abstraction test?
 

backontrack

Established Member
Joined
2 Feb 2014
Messages
6,399
Location
The UK
as soon as an application is made network rail then tries to find paths. It would not stop applications being made even if there are no paths. They can still be refused
Exactly my point – they might try an application like this was my thinking, and it'd likely get turned down.
 

si404

Established Member
Joined
28 Dec 2012
Messages
1,267
Princes Risborough (or Neasden) - Aylesbury - Bletchley is really rather slow. I don't think Aylesbury-Bletchley would be that quick either.

The Wrexham & Shropshire route to Wolverhampton seems a more logical play if the going to Marylebone is about avoiding the congested southern WCML.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
The various single line sections along the way (e.g. Princes Risborough-Aylesbury) would be a pretty difficult constraint.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,571
I couldn't help but wonder...when East-West rail has eventually opened between Aylesbury Vale Parkway and Bletchley...

Does anybody think we'll see the Ian Yeowarts of the world apply to run open access services from Marylebone up the WCML using bi-modes in order to get past ORR abstraction regulations?

Stranger things have happened, after all...

Five main issues:

1) insufficient capacity between Neasden and Marylebone
2) persuading LU to grant track access on their section - AFAIK LU aren’t under an obligation to consider open access in the way NR are
3) insufficient capacity north of Bletchley
4) journey times would be horrendous, it would be at least 1h10 to MK, probably longer.
5) New Open Access has a very bleak future post virus / post Williams review. Even existing open access is going to struggle.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Wonder what rolling stock would be suited for these services?
Probably 802s/other class of AT300, the development costs have been taken on by the IEP so AT300s are comparatively cheap and have bimode available. The downsides are the rather high doors.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Isn’t Marylebone station operating at full platform capacity anyway? Any extra services require the Old Oak Common planned platforms, but they are just for extra services, not to enable spare platforms at MYB.
 

Jorge Da Silva

Established Member
Joined
4 Apr 2018
Messages
2,641
Location
Cleethorpes, North East Lincolnshire
Isn’t Marylebone station operating at full platform capacity anyway? Any extra services require the Old Oak Common planned platforms, but they are just for extra services, not to enable spare platforms at MYB.

yes thats the plan. I think it was 4tph down that route and it was only as extra's as Marylebone is at full capacity in both track capacity and passenger capacity
 

PR1Berske

Established Member
Joined
27 Jul 2010
Messages
3,025
A bit more on-topic for the thread, rather than Marylebone it was briefly proposed that Queen's Park could be used for classic WCML open access services but was later found that there was enough capacity for these at Euston even with 2 platforms (17-18) out of use for HS2 construction.
Yes I was going to say, I remember Queen's Park as the initial terminus for the Alliance/Great North Western Open Access service. Much will chop and change between now and the start of both OA and HS2 services around this part of London, no doubt!
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,625
yes thats the plan. I think it was 4tph down that route and it was only as extra's as Marylebone is at full capacity in both track capacity and passenger capacity
Some would be diverted out of Marylebone, I seriously doubt the ability to get an extra 4tph north of Ruislip.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,607
Journey times would be awful. Chiltern are better off with their 'golden triangle' of London, Birmingham and now Oxford - and growing opportunities out of those.

The latter especially has potential to grow (to Stratford/Birmingham, Cowley, EWR if it happens and they can get it) - plus Moor St will have some capacity, earmarked yes, once everything moves through to Snow Hill.

Longer term, wires at each end could really transform both commuter networks. But I can't see anything more running from Marylebone unless something drastic happens at OOC, and those are intended to be extra.
 
Status
Not open for further replies.

Top