backontrack
Established Member
Silloth isn't even the fourth-best proposal in Cumbria...To think people mock the idea of reopening Tweedbank to Carlisle
Seriously though, good to see the Burscough Curves in there and Skipton-Colne.
Silloth isn't even the fourth-best proposal in Cumbria...To think people mock the idea of reopening Tweedbank to Carlisle
Seriously though, good to see the Burscough Curves in there and Skipton-Colne.
what could be the sixty schemes? Awards of up to £50,000 towards things like Feasibility studies
The ones I know of that have been submitted or were going to be submitted:
The other 26? Are some of these stations?
- Leicester-Burton
- Stockport to Stalybridge
- Stocksbridge-Sheffield
- Sheffield to Chesterfield via Barrow Hill
- Doncaster to Knottingley
- Doncaster to Shireoaks
- Stafford to Wellington
- Buxton to Matlock
- Gobowen to Oswestry
- Rhyl to Corwen
- Tavistock to Bere Alston
- Tavistock to Okehampton
- Brent to Kingsbridge
- Heathfield to Newton Abbot
- Stratford to Honeybourne
- Lostwithiel to Fowey
- Northampton to Market Harborough
- Northampton to Bedford
- Wisbech to March
- Uckfield to Lewes
- Bourne End to High Wycombe
- Sandall and Agbrigg to Barnsley
- Skipton to Colne
- York to Beverley
- Penrith to Keswick
- Silloth to Carlisle
- Skelmersdale Spur
- Afon-wen to Bangor
- Totton to Fawley
- Newport to Smallbrook Junction
- Shanklin to Ventor
- Burscough Curves
- Grazebrook to Baguely
- Shirebrook to Ollerton
- Poulton-le-Fylde to Fleetwood (not included in the 60)
- Northumberland Park to Ashington (not included in the 60)
List of station bids:
I have thought about maybe Gainsborough to Cleethorpes was submitted?
- Cullompton
- Wellington
- Methley
- Little Deeping
- Donnington Road
- Wilton Parkway
- Standish
- Marsh Barton
A mile of track will cost a mile of track no matter whether it's done today tomorrow or in 10 years time.
Not sure why some of these are asking for money to fund studies when a few must have them coming out their ears. £50k isnt going to get them much else.
Except it doesn’t. Costs can vary widely depending on where that mile is and what it is to be built on (physically and politically).
4. Sheffield to Chesterfield via Barrow will be ambitious if they don't sort out the Sheffield Midland two track bottleneck.
Unless they propose running it as an extension of the Stocksbridge service?
I believe they do and it would go via Victoria to Darnall thereby avoiding the congested northern throat from Midland.
It might also avoid the places most people currently want to go to but may generate new journey opportunities. .
Are they thinking of having a station at Nunnery Square, for Supertram interchange? Or Orgreave/Waverley, for the new developments there and the Advanced Manufacturing Park?
Might Brockenhurst to Ringwood be on the list?
Could Lyme Regis or Sidmouth be some of them? (We are still missing 9 even with these)
Being truly honest, i think it will be a great time to be a company who does feasibility studies for this sort of thing...
Might Brockenhurst to Ringwood be on the list?
The number of passengers using the Hurst Green - Uckfield line has increased rapidly over the past few years
Maybe commuter rail growth would give a better comparison than all domestic rail growth, but I doubt such statistics are recorded.9.5% since 2007/8, vs 44% nationwide.
I, without a railway to my settlement, am still paying for you to have and retain one at your settlement. Is that best use of my taxes?No I don't. I simply try to remove the irrational, emotional guff they bring to any discussion of this sort and look at what is the best use of OUR money. I get the emotional bond with this topic but that shouldn't be the basis for a decision. We also have to acknowledge ( and this is VERY hard for people here) that the train isnt the only or often best option. A new road might be better for a certain community.
I, without a railway to my settlement, am still paying for you to have and retain one at your settlement. Is that best use of my taxes?
I, who cannot drive or own a car and is ill when travelling by bus or coach, is a new road better for me than a new or reinstated railway line?
There is no irrational or emotional guff about it as you flippantly put it. It a service and necessity to many.
I, without a railway to my settlement, am still paying for you to have and retain one at your settlement. Is that best use of my taxes?
I, who cannot drive or own a car and is ill when travelling by bus or coach, is a new road better for me than a new or reinstated railway line?
There is no irrational or emotional guff about it as you flippantly put it. It a service and necessity to many.
I, without a railway to my settlement, am still paying for you to have and retain one at your settlement. Is that best use of my taxes?
I, who cannot drive or own a car and is ill when travelling by bus or coach, is a new road better for me than a new or reinstated railway line?
There is no irrational or emotional guff about it as you flippantly put it. It a service and necessity to many.
I, without a railway to my settlement, am still paying for you to have and retain one at your settlement. Is that best use of my taxes?
I, who cannot drive or own a car and is ill when travelling by bus or coach, is a new road better for me than a new or reinstated railway line?
There is no irrational or emotional guff about it as you flippantly put it. It a service and necessity to many.
They, who ever they are, have not bid because not one of the 3 MPs on the route have supported it. The Harrogate MP has publicly stated he supports restoring Harrogate-Northallerton but privately refuses to. He supports reinstatement but not this one as it is not local to Harrogate. He must be deranged as you can't get more local than the southern end being in Harrogate.possibly added Harrogate to Ripon after I have read they have bidded for funding
I chose to live in a settlement with a railway. It was taken away by Beeching's flawed accounting in 1967.Well you chose to live in a settlement without rail.
You have realistically 3 options if you can't use buses, either move to a place with a train station, learn to drive, or put up with the buses.
But, and I will try to say this as politely as possible, it’s not about you or your situation.
It’s about everyone. That’s the whole point of society and Government - to get the best result for society as a whole. And in almost all cases, that will not be a new railway. That’s why @DarloRich said *our* taxes, not *my* taxes.
I will reply as politely as I can. "Our" or "my" taxes is splitting hairs. Those with a railway are still financed by those without a railway from taxes. I would pay less taxes and be better off if your railway was closed too and not subsidised. 30% of railway operation is still paid for out general taxation.
Ideas Fund: Bids for March submitted and due to be announced in May: Second bidding in June and third in November 2020
Potential Bids for Ideas Fund?
- Leicester-Burton
- Stockport to Stalybridge
- Stocksbridge-Sheffield
- Sheffield to Chesterfield via Barrow Hill
- Doncaster to Knottingley
- Doncaster to Shireoaks
- Stafford to Wellington
- Buxton to Matlock
- Gobowen to Oswestry
- Rhyl to Corwen
- Tavistock to Bere Alston
- Tavistock to Okehampton
- Brent to Kingsbridge
- Heathfield to Newton Abbot
- Stratford to Honeybourne
- Lostwithiel to Fowey
- Part of Northampton to Bedford
- Uckfield to Lewes
- Bourne End to High Wycombe
- Sandall and Agbrigg to Barnsley
- York to Beverley
- Penrith to Keswick
- Silloth to Carlisle
- Afon-wen to Bangor
- Totton to Fawley
- Newport to Smallbrook Junction
- Shanklin to Ventor
- Burscough Curves
- Grazebrook to Baguely
- Shirebrook to Ollerton
- Poulton-le-Fylde to Fleetwood (not included in the 60)
- Harrogate to Northallerton via Ripon
- Station: Cullompton
- Station: Wellington
- Station: Methley
- Station: Little Deeping
- Station: Donnington Road
- Station: Standish
- Station: Cullompton
- Wortley Curve
- Devizes Parkway
- Gainsborough Central to Cleethorpes (Potentially, but guess work)
- Northampton to Market Harborough
- Sharpness to Berkeley Road (Potentially, but guess work)
- Burnley-in-Wharfedale to Weeton via Otley (potentially but guess work)
- Brokenhurst to Ringwood (Potentially but guess work)
Accelerating Existing Proposals: Separate Bidding process to the other two
New Stations Fund: Separate bidding process to the other two
- Skipton to Colne
- Corsham
- Wilton Parkway
- Northumberland Park to Ashington
- Wisbech to March
- Skelmersdale Spur
- Edingswell
- Marsh Barton
Updated: Separated into separate section so there are more bids as the 60 schemes were all ideas funds so?
I cannot see why there is a need for a Gainsborough to Cleethorpes reopening, there is already a line via Barnetby which is fairly direct.
I assume that what this means is regular services on the existing line 6/7 days per week